Project overview

Mahalaxmi Ashish Co.Op. Housing Society Ltd. is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700052135. Mahalaxmi Ashish Co.Op. Housing Society Ltd. is located at 17/3/5/A/5 Plot No 5. This is a New being developed by Vpm Developers.

Mahalaxmi Ashish Co.Op. Housing Society Ltd. has 1 BHK, 1RK & Shop Apartments with carpet areas ranging from 142 to 93 Sq.ft. Carpet. The Project has total 25 of which 16 are currently available for sale.

Mahalaxmi Ashish Co.Op. Housing Society Ltd. is being developed on a total land area of 3105 Sq.ft. Mahalaxmi Ashish Co.Op. Housing Society Ltd. has 1 Wings / Towers Mahalaxmi Ashish Co Op Housing Society Ltd

ProjectDeveloperLocationPossession
Arham VatikaArham EnterprisesS No.140 H. No. 8A31-07-2018 00:00:00
Shiv-GauriShivam Developers32/1/A/8/Plot No 830-12-2021 00:00:00
Om VatikaOm Shiv EnterprisesS No.105, H No.3P30-06-2018 00:00:00
PalmPranjee Properties Pvt. LtdPlot No. 528-05-2021 00:00:00
Vishnu Vatika Nx Wing C1 E1 E2 Phase 1Vishnu GroupS No. 131 /1 And 132/230-10-2023 00:00:00
Jeevan LifestylesJeevan EnterprisesS N 148 / 13/1531-03-2019 00:00:00
Shubh AarambhPacific Construction & Developers105A, 3P, 830-04-2018 00:00:00
Hill Side Residency Wing A B And CSupreme Developers421503, Thane30-12-2022 00:00:00
Vedant Nakshatra Abc Phase 1Mohan Hardasmal TharwaniS No 70/1/2 And S No 70/5/B31-12-2017 00:00:00
Shubh Vastu Wing B And CShubh HomesSurvey No.143, Hissa No.3, 4 And 731-12-2025 00:00:00
Satish Oak HeightShree Sai Prathamesh DevelopersS No 66 H No 911 B And C, S No 66 H No 1031-03-2026 00:00:00
Sarvesh Dream City Wing DSai Shradha DevelopersS No 76 H No 1531-12-2025 00:00:00
Shree Datta Narhari ApartmentOmkar EnterprisesSurvey No 32,Hissa No 2,Plot No 901-12-2025 00:00:00
Amrut ManjilSai Shradha DevelopersS No 120 H No 4 & S No 120 H No 731-01-2028 00:00:00
Ram RiveraS No 29/A/3 Plot No 13 And 1430-09-2025 00:00:00
Tulsi AahanRaj GroupS. No.39 , H No. 1,2,331-12-2019 00:00:00
Kondilkar ResidencyAditi Construction50/6P01-01-2019 00:00:00
Amrut Vishwa Phase 2Sai Shradha DevelopersSurvey No. 173 Hissa No. 331-12-2019 00:00:00
Wing D- DurvankurM K Patil DevelopersGut No 8 P19-08-2019 00:00:00
M/S. Shubham Karoti Complex Phase - IM/S. Shubham Karoti Enterprises146/4 B Plot 1,231-03-2018 00:00:00
Aruna UlhasGaondevi Developers49/10/3,431-08-2018 00:00:00
Swanand Treo Building No 3 -Swami GannayakSwanand HeightsSurvey No 13, Hissa No 231-12-2017 00:00:00
Ekdanta ApartmemtEashanya Builder And Developers421503, Thane31-12-2019 00:00:00
Shreeji Iconic Phase IRaj Laxmi Developers137B, 148 Hn1 And 2B, 145 Hn 130-05-2022 00:00:00
Nirmala ParadisePokhriyal And AssociatesS No 12730-09-2024 00:00:00
Bingo Dham Co-Op Hsg Soc LtdSai ConstructionsThane, 421503, Badlapur31-12-2022 00:00:00
Sarveshwar Co-Op Hsg SocDalal BuildscapeTaluka Ambernath30-06-2024 00:00:00
Mohan ArecaMohan Lifespaces LlpSurvey No 4/Hissa No 1P31-12-2019 00:00:00
Thanekar ParadiseAjay Madhukar Thanekar81/1A30-12-2019 00:00:00
Vishwajeet ManorAbhijeet RealtyGut No 574 Pt 574231-12-2019 00:00:00
Krishna DarshanKrishna BuildconSurvey No. 148, Hissa No. 20/A31-12-2025 00:00:00
Samarth ParadiseS P DevelopersS No 21 H No 1331-12-2026 00:00:00
Park One Phase IiShree Laxmi EnterprisesSurvey No. 125, H.No. 1/A31-12-2027 00:00:00
Motiram PuramNayan Dilip DalalSurvey No 183 H.No 9 Survey No 184 Hissa No 2A30-05-2022 00:00:00
Evergreen Residency C WingBalaji ConstructionS No 25 Hissa No 5 And 6 And S No 24 Hissa No 130-12-2022 00:00:00
M/S. Shubham Karoti Complex Phase - IiiM/S. Shubham Karoti EnterprisesThane, 42150331-03-2020 00:00:00
Apte HomesShree Siddhi DevelopersSurvey No-44, Hissa No-1/A/331-12-2018 00:00:00
Sonal Co-Op Housing SocietySoham Developers4918231-01-2019 00:00:00
Nav Avani ChsMangalya InfraS. No. 51, H. No. 3/A/30, Plot No. 3031-01-2025 00:00:00
Mangalam ArcadeMangalam EnterprisesSurvey No 7 Hissa No 1(P) Plot No 4224-04-2024 00:00:00
Soham NeelM/S Neel Siddhi Enterprises27/1/11 , Plot No. 831-03-2027 00:00:00
Sai ShrutiPinnacle ConstructionsSurveyno 331-03-2018 00:00:00
Rubyana Residency Phase 1Sudhir Damodar GhatnekarSurvey No. 8930-06-2018 00:00:00
Krishna KunjRaj Manohar WadhwaSurvey No 63 / Hissa No 2 Plot No A231-03-2018 00:00:00
Aditi PlazaChintamani Construction53/13P30-06-2018 00:00:00
Manohar Vikas Shreeji Paraiso Phase 1Deeplaxmi DevelopersS No 60/5, 60/6, 61/130-05-2022 00:00:00
Shree Sai PoojaM/S Mahalaxmi Construction Co.15/331-12-2019 00:00:00
Blue Diamond ResidencyKimaya ConstructionSurvey No 61 Hissa No 331-12-2019 00:00:00
Sky HillSeven Hill Buildcon100/5A30-04-2019 00:00:00
LeelaanganPravin Kashinath Haware135/230-12-2022 00:00:00
First EleganceGurupreet Singh Baldev Singh SandhuSurvey No 26, Hissa No2/A/23, Plot No 20, Shirgaon31-12-2025 00:00:00
Shreeji Landmark Phase 1Deep Laxmi Associates167 Part31-03-2027 00:00:00
Krishna HillsShree Omsai ConstructionThane, 40053131-07-2017 00:00:00
Ganesh HeightsShiv Builders And DevelopersGut No 53/1 And 53/2 Plot No. 11 And 1431-12-2019 00:00:00
Sai DarshanUnity Infratech17030-12-2020 00:00:00
Jalaram Jyot Co-Op Housing Society Ltd.Shiv AssociatesS No.23, H.No.1701-08-2027 00:00:00
Shreeji Landmark NxShubh InfraSurvey No.136, Hissa No 1/B And 2A,31-12-2026 00:00:00
Om Chandraprakash Co. Op. Housing Society Ltd.Mega Arcade DevelopersPlot No 16, Survey No. 26/3/A31-05-2027 00:00:00
Shivansh EnclaveShivansh BuildconPlot No 5 & 6 Survey No 41 Hissa No 1/11 And 1/1331-12-2027 00:00:00
Olive - Phase Iii - Pranjee Garden CityPranjee Properties Pvt. LtdPlot No. 5 Part30-06-2024 00:00:00
Parijatak Phase I A And B WingVarad BuildersSno.44/1/A/2 Sno.46H No.6/A/8 Plot 22 Sno 46 Hno.6/A/9 Plot No 23Sno 46 H No 6/A/10 Plot No 2430-06-2025 00:00:00
Satvik Wing BM/S. Jigar EnterpriseS.No 39/6 Hissa No. 1 And 6 Pt31-12-2023 00:00:00
Swami HighlandsShree Swami Samarth AssociatesSurvey No 10A Hissa No 5P,Plot No 10, 9A31-12-2019 00:00:00
Entilla By DevDev Konark CorporationSurvey No 98 Hissa No 4A30-09-2018 00:00:00
Bahinai BhuvanManoj Vasudev VaidyaCts No 22230-12-2020 00:00:00
Shree AtharvAtharv EnterprisesS No 43 Hissa 1A31-12-2025 00:00:00
Sonal ParadiseShubh GroupGut No 84, Gut No 86/1/A31-12-2026 00:00:00
Mahalaxmi Ashish Co.Op. Housing Society Ltd.Vpm Developers17/3/5/A/5 Plot No 531-03-2025 00:00:00
Trinity Galaxy R1 And R4Trinity DevelopersSurvey No 172 Hissa 13 14 1530-06-2018 00:00:00
Vedant Imperial D Phase 3Mohan Hardasmal TharwaniS No 56/3 57/1P 57/330-06-2023 00:00:00
Shree Ashtavinayak Vastu PrakalpaBalkrishna Kashinath Bhoir5730-11-2019 00:00:00
NilgiriShivam DeveloperSurvey No 46 Hissa No 6A 19 Plot No 3230-05-2018 00:00:00
Namdev PlazaMetro InfraS No 1/4, 1/9, 1/9A30-06-2019 00:00:00
Silicon TowerShree Radhakrishna DeveloperSurvey No 50 And 93 Hissa No 1531-05-2018 00:00:00
Daksh PalaceThakur DevelopersManjarli30-09-2024 00:00:00
Shreshtha Swapna Co-Op Housing Society LtdOm Shree Sai Builders And DevelopersTaluka Ambarnath31-12-2024 00:00:00
Uma Kunj Cooperative Housing Society LimitedPravin Arvind ApteSurvey No 50, H No.2B, S No. 51 H No.4/A/36 Plot No 35B15-12-2025 00:00:00
Mohan Areca IiMohan Lifespaces LlpSurvey No.4/Hissa No 1P31-12-2019 00:00:00
Suraj Co.Op.Hsg.Soc.LtdAsd EnterprisesS No /Gut No 48/3 Plot No 6 To 1030-05-2024 00:00:00
Bhavani HeightsKalyani Enterprises99/430-12-2023 00:00:00
Sai Girnar Chs LtdMitra RealityS.No. 24/1/1 Plot No.2 And 25/2/5, 25/2/6 And 25/2/7 Plot No. 2, 3 And 431-12-2028 00:00:00
Vanya ArcadeR A InfrastructureS.No. 40/3/8 Plot No. 930-06-2027 00:00:00
Shree Ayyappa Co-Operative Housing Society LimitedG. K. BuildersPlot No. 1, S No.25/1/A/130-09-2026 00:00:00
Vastudeep ChsVastu NirmanSurvey No 20/1/2, Plot No.201-02-2029 00:00:00
Samruddhi Evergreens Phase-4CPoddar Housing And Development LimitedThane, 421503, -31-03-2020 00:00:00
Maple City Phase IShree Chintamani EnterprisesS No 141 S No143 H No 4A S No 144 H No 1A And 230-12-2021 00:00:00
Vastu SquareVastu BuildersS No 28A Hissa No 3/1P Plot No 7A31-03-2018 00:00:00
Tulsi AnandAnand HomesSr No 72 H 231-12-2019 00:00:00
Sai Prasad PlazaSainath Shete421503, Thane31-12-2019 00:00:00
Vedant Nakshatra M Phase 2Mohan Hardasmal TharwaniS No 70/1/2 And S No 70/5/B30-12-2025 00:00:00
Shreeji GreensDeep Laxmi AssociatesS No 70 H No 6A S No 70 H No 6B S No 73 H No 2 S No 73 H No 531-07-2026 00:00:00
Shiv ParadiseShiv CorporationPlot No 14 & 15 S No 45 H No 1/A/17 And 1 /A/1831-12-2025 00:00:00
Fulora Co-Op Housing Society LtdPinnacle CreatorsSurvey No 13 Hissa No 6 A 1731-07-2025 00:00:00
Saishyam ArcadeShubh BuildspaceSurvey No 20, Hissa No 2,431-12-2025 00:00:00
Shreeji IconicRaj Laxmi DevelopersSr No 137B And Sr No 9 H No 1031-12-2028 00:00:00
Samarth Shivani Co-Operative Housing Society LimitedGururaj Enterprises Builders And DevelopersS.No. 31, H. No. 2/A, Plot No. 8 & 931-08-2025 00:00:00
Wing B-6 SwanandM K Patil DevelopersGut No 8 P31-12-2018 00:00:00
Khatri GrandeAashiyana Builders AnddevelopersS No 37 Hissa No 2 And 3 S No 38 Hissa No431-12-2019 00:00:00
Wing C-7 MoryaM K Patil DevelopersGut No 8 P31-12-2018 00:00:00
Rachana HeightsReshma Vikas Bambulkar482109-06-2019 00:00:00
Ekdant SmaranPrashant Tukaram BaeetSurvey No. 41, H.No. 1, Plot No. 116-03-2021 00:00:00
Madhumalti Apartment B WingShree Datta EnterprisesS No 105A, H No 4/2,3,431-03-2018 00:00:00
Satvik E WingJigar EnterprisesS No 39 H No 6 Pt Plot No 1 And 1201-12-2019 00:00:00
Khatri NxAashiyana ConstructionsGut No 111 Hissa No 3, 41, 4231-12-2019 00:00:00
Padmaprabha Co Op Hsg SocietyShree Mahaveer EnterprisesSurvey No 46 Plot No 23 24 H No 6A9 6A10 P30-04-2018 00:00:00
Sai VillaBuilt Tech Builders & Developers Pvt. Ltd.Survey No 174 Hissa No 5P30-12-2022 00:00:00
Nav Sai Chhaya Chs LtdNiket EnterprisesS No. 30 Final Plot No. H. No. 1/B1631-01-2020 00:00:00
Panvelkar OptimaVarad Vinayak DevelopersSurvey No 16 Hissa No 330-09-2020 00:00:00
Satyam Sheela Wing FShreeji DevelopersSurvey No 72/4 And Survey No 73/1/B, Shirgaon,Badlapur-42150331-07-2026 00:00:00
Shiv Tirth B WingGajraj EnterprisesSr No 36 Hissa No 3P Cts No 37931-12-2025 00:00:00
Sai FloraM/S Mitra Reality59, Hissa No 1 B Part31-12-2026 00:00:00
Shubh AshishShubh BuildersS No 82 Hissa No 14-231-12-2019 00:00:00
Manohar Shreeji Nirvana Phase 4Deeplaxmi DevelopersS No 43 H No 1A, S No 43 H No 1B30-10-2022 00:00:00
Shiv SamarthShiv CorporationPlot 8/9, Survey No 5, H No 24/E30-09-2020 00:00:00
Nav Balaji Co-Op Hsg. Soc. Ltd.Ruturaj DevelopersSurvey No 29/A31-12-2025 00:00:00
Mauli ParkM/S. Mauli DevelopersSurvey No 83 Hissa No 1531-03-2028 00:00:00
Shiv Paradise Wing CShiv CorporationPlot No 14 & 15 Village Shirgaon, Survey No 45 H No 1/A/17 & 1/A/18, Survey No 45 H No 1/B31-12-2026 00:00:00
Shri Jiveshwar ApartmentOmkar EnterprisesSurvey No. 33,Hissa No. 7,Plot No.8 & 906-12-2028 00:00:00
Krishna Nayan Complex Phase IShreeji Builders And DevelopersSurvey No 37,Hissa No 4A31-12-2027 00:00:00
Pg VrundavanMaruti CorporationS No 62, H No 6A31-12-2027 00:00:00
Balkrushna Co-Op Housing Society LtdSai HomesSurvey No 3031-12-2026 00:00:00
Siddhivinayak ResidencySairaj DevelopersS No 48 H No 2 P No 831-12-2024 00:00:00
Audumbar DarshanAudumbar EnterprisesSurvey No 55 H No 3/A/10 Plot No 231-01-2024 00:00:00
Mahalaxmi ResidenceShree Mahalaxmi DevelopersCs No 1263 C.No. 19 Cs No 1264 C.No. 3931-12-2024 00:00:00
Jai Ganesh Co-Operative Housing Society LtdDeepali LandscapeSurvey No 42(P), Plot No H-1 (9 To 16 & 17 To 22)31-12-2026 00:00:00
Shreeji Landmark Phase IiShubh HousingSurvey No 136, Hissa No 331-12-2026 00:00:00
Samarth VatikaShree Samarth Associates122Asurvey No 32 Shirgaon Badlapur30-12-2018 00:00:00
Om Savai NiketanSagar Super Structures Private LimitedPlot Bearing S.No.143, H.No.5-631-05-2018 00:00:00
AsawariAshish Waman GoleSurvey No 38 Hissa No 2A1 And 2A2 , Plot No 3 And 531-03-2018 00:00:00
Sai ArcadeSai DevelopersSurvey No 5 Hissa No 22 Plot No 431-12-2017 00:00:00
Shubh VatikaShubh Enterprises7A, H No 230-11-2018 00:00:00
BhagatiniwasShri Sadguru ConstructionSurvey No 42 P30-12-2018 00:00:00
Ravindranath Tagore NiketanSai City DevelopersSurvey No 45 Hissa No 4 Plot No 630-12-2020 00:00:00
Avantika ResidencySanchita Construction28A/2/1P27-08-2018 00:00:00
ParshvadharaParshvanath Developers38 Hissa No 630-04-2019 00:00:00
Kool Breeze Phase IiAbhishek Shelters LtdS No 127 H No 32 S No 13 H No 1231-05-2018 00:00:00
Swaroop OrchidSwaroop ConstructionS No 87 Hissa No 1130-06-2018 00:00:00
Shubh AanganShubh EnterprisesSurvey No 52 H No 3131-12-2019 00:00:00
The Address Ph-1 Wing ASadguru Associate421503, Thane, Badlapur31-08-2020 00:00:00
Parijat Plaza Type BM/S Parijat ConstructionsS No 49 H No 20 P No 10 S No 50 H No 731-05-2018 00:00:00
Vastu Swapnapurty ResidencyVastu Builders And Developers3831-07-2023 00:00:00
Maitri HillsEshwar EnterprisesSurvey No 7 A H No 4 P Plo No 9 And 1030-06-2019 00:00:00
Sai HighlandShree Saikrupa DevelopersGat No 91 Hissa No 330-03-2022 00:00:00
Patil Hill ViewEkdant DevelopersS No 42 Hissa No 5 S No 57 Hissa 330-06-2018 00:00:00
Neelkanth DeepKeshav RealtySno-7A, H No-1/2 Plot-2 Moje Belavali30-06-2019 00:00:00
Bhakti Park B WingBhakti CorporationSurvey No 83 Hissa No 12A31-03-2018 00:00:00
Krishna KunjKrishna Associates97/B, H.No.- P ,Plot No.-1231-03-2018 00:00:00
M/S. Shubham Karoti Complex Phase - IiM/S. Shubham Karoti Enterprises1484 B Plot 731-12-2018 00:00:00
Saffron HillsAlpha CombinesSno 148 Hno 15A30-06-2019 00:00:00
Morya ResidencySairatna ConstructionS No 36 And 37 Hissa No D1 D3 5A7 And 8 Plot No 7 8 And 930-09-2020 00:00:00
Shubh HillsVardhman Enterprises1273C31-07-2018 00:00:00
Nirmal DharaSiddhivinayak EnterprisesS No. 4831-12-2019 00:00:00
Krishna ResidencyKrishna EnterprisesSurvey No 23, Hissa No 7/1,7/230-11-2018 00:00:00
Vitthai Anant PlazaSharad GaikwadBadlapur31-12-2026 00:00:00
Shree Datta Samartha ChslShree Sai Swami EnterprisesS No-40 H No-6 P No-630-06-2023 00:00:00
Project Details
  • Project:
    Mahalaxmi Ashish Co.Op. Housing Society Ltd.
  • Location:
  • 17/3/5/A/5 Plot No 5
  • Const. Stage:
    New
  • Possession:
    31 Mar 2025
Developer Details

  • Developer:
    Vpm Developers
  • Phone:
  • Address:
  • City Pride
Project RERA Details
MAHA REARA No: P51700052135
Project Type Residential / Group Housing
RERA Project Status New
Architect Mr Yogesh Nagane
Funding Bank HDFC BANK
Proposed Possession 31 Mar 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 24 Jul 2023
Last Retrived 26 Jul 2025
Mahalaxmi Ashish Co.Op. Housing Society Ltd. QR Code
Mahalaxmi Ashish Co.Op. Housing Society Ltd.
MahaRERA - P51700052135
Apartment Details & Configuration
TypeArea
1 BHK19.68 Sq.mts. ( 212 Sq.ft. )
1 BHK22.76 Sq.mts. ( 245 Sq.ft. )
1 BHK25.9 Sq.mts. ( 279 Sq.ft. )
1RK14.32 Sq.mts. ( 154 Sq.ft. )
Shop15.18 Sq.mts. ( 163 Sq.ft. )
Shop5.35 Sq.mts. ( 58 Sq.ft. )
Shop7.56 Sq.mts. ( 81 Sq.ft. )
Shop8.66 Sq.mts. ( 93 Sq.ft. )
Shop13.17 Sq.mts. ( 142 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Mahalaxmi Ashish Co.Op. Housing Society Ltd.last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Not Yet Started
Energy management
Na
Fire Protection And Fire Safety Requirements
Not Yet Started
Landscaping & Tree Planting
Not Yet Started
Open Parking
Not Yet Started
Sewerage (Chamber, Lines, Septic Tank , STP)90% completed
90% Complete
Not Yet Started
Solid Waste Management And Disposal
Na
Storm Water Drains90% completed
90% Complete
Not Yet Started
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Not Yet Started
Water Supply
Not Yet Started
Buildings / Wings in Mahalaxmi Ashish Co.Op. Housing Society Ltd.
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Mahalaxmi Ashish Co.Op. Housing Society Ltd. by Vpm Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

3105 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

25 apartments in total
Total
25
Booked
9
Available
16

Saleable Area Statistics (Sq. ft.)

4986 Total
Total
4986
Booked
1360
Available
3626
Total 25 apartments in project. 9 apartments booked. 36% apartments booked.
Total 4986 Sq.ft. saleable area. 1360 saleable area booked.
27% area booked.

Mahalaxmi Ashish Co Op Housing Society Ltd

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Mahalaxmi Ashish Co Op Housing Society LtdMar 202551010251
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK19.68 Sq.mts. ( 212 Sq.ft. )5
2 Booked40% Booked
40% Booked
1 BHK22.76 Sq.mts. ( 245 Sq.ft. )5
1 Booked20% Booked
20% Booked
1 BHK25.9 Sq.mts. ( 279 Sq.ft. )5
None Booked0% Booked
0% Booked
1RK14.32 Sq.mts. ( 154 Sq.ft. )5
1 Booked20% Booked
20% Booked
Shop15.18 Sq.mts. ( 163 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop5.35 Sq.mts. ( 58 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop7.56 Sq.mts. ( 81 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop8.66 Sq.mts. ( 93 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop13.17 Sq.mts. ( 142 Sq.ft. )1
1 Booked100% Booked
100% Booked
25 total apartments / 9 apartments booked. 36% apartments booked.
Work Description in Building Mahalaxmi Ashish Co Op Housing Society LtdCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress70% done
70% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Vpm Developers
for Project
Mahalaxmi Ashish Co.Op. Housing Society Ltd.
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation