Project overview

Madhuban Heights is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800006442. Madhuban Heights is located at Mr7gfpfibxc3wn06xrp4za==. This is a Ongoing being developed by Wadhwana Housing Development And Infrastructure Co.

Madhuban Heights has 1 BHK, 2 BHK T1, 2 BHK T3 & 3 BHK Apartments with carpet areas ranging from 308 to 721 Sq.ft. Carpet. The Project has total 28 of which 2 are currently available for sale.

Madhuban Heights is being developed on a total land area of 22051 Sq.ft. out of which 3307 Sq.ft. i.e 15% is reserved for recreational purposes. Madhuban Heights has 2 Wings / Towers Wing A,Wing B

ProjectDeveloperLocationPossession
Casa RareGeopreneur Corp Pvt LtdVixn1njzx8tt8ilbh+9Ydq==31-03-2019 00:00:00
Casa PalazzoM/S. Paradigm Real Estates LlpS88wb9moxtmq8xnfermcvomvv5lqfw6xy2xdqyc6k/Jflclbk5uqpkkqthyfjjc9vtgrhqsqluogbi9snrlp2s2cuhdwlpochmgtflv589gwt4v/Xbkopz3gog1nh14e31-03-2019 00:00:00
Manek Terrace Chs LtdK T GroupMumbai Suburban, 40009228-02-2017 00:00:00
Rakhi Tower Phase 1Western DevelopmentsGvw2geojwue7eaj/O27j/Ggafjos6tc40t5xk5hw12u=21-12-2019 00:00:00
New Tashkent Terrace ChslAmar AssociatesKbamhlwzojcix0nfkf6m6a==01-10-2018 00:00:00
SwashrayShanti EnterpriseLa9isq7/Ymgz1utqeg05va==30-05-2022 00:00:00
Jayakunj Apartment ChslJayakunj Apartment Chsl8Ykwj2d3vb2yh6dqhqcfhq==30-10-2022 00:00:00
SamtaGreen Tree Lifescapes LlpEf8olezrxhxcsnr+Mmfhjq==01-08-2022 00:00:00
Supreme MadhukarSupreme EnterprisePeh0rb68lyw/P/Clh+Vnbko8kslupxsjw3yxezl8eqgenlw45afl1teambgycfor/Rhroxdxwuww5whmgrn7dhxrnfjboo16fuphtafjkka=05-01-2025 00:00:00
Borivali Padam ChslAmisha Constructions Private LimitedVkjxlk7ram1q9lc2x7nr4s30zxb9qiwtevzgcndvmuu=30-06-2025 00:00:00
Shivoham EnclaveSiddheshwar Builders Pvt. Ltd.J5f3xujzws9ecduqdva8set5x4bm4h0cyvryxrughrfpepn/M5uocbqmtm90oylnk79jc3fjud3yjedtx8pos8fmusnj9ulg7xtamjj0r9htslc+6Zisej5axfjfd+Vc30-06-2022 00:00:00
Redevelopment Of Nahar ChslRishubh DevelopersRmsvu6huk8xpyw5xbezodq==25-12-2021 00:00:00
Rite PerintoRite Developers Pvt. Ltd.Oveyhwbt7dyj0ko3fjyfj6u+466Agevu5lldk9n10xa=30-03-2021 00:00:00
AsharaDevleela DevelopersDnxo5g43kfusasishjzqrw==31-12-2019 00:00:00
Rajal - Veer Abhimanyu Chs LtdNisar Properties Pvt. Ltd.Y4bloabstw6mevk2jk7rvanjskwirkwcc+Mxjhjne/A=30-06-2023 00:00:00
VrindavanDinesh Amrutlal ThakkarNciqn0e0lyhnfovfzvsymw==31-12-2025 00:00:00
OmkareshwarTriumph VenturesLn/U3za3tme5ntec4so27g==31-12-2024 00:00:00
Rishabraj Park VistasH Rishabraj RealtyMorxh9esfwykp2n9n3/Ezg==31-12-2025 00:00:00
Borivali Neelkanth Nagar Chs LtdMahavir InfrastructureYdhr4fsuj+7Byghyw2yfrodabfikvt4tj+Yp26o4vpwuknkswd0nvbosm0hx1jpn31-12-2020 00:00:00
Om Sarjan ChslGlasswood Realty Private LimitedS9enuv1vhiacwso9y5l5y0oag3rnv1xfv5plmxj4cac=31-12-2019 00:00:00
DreamsvilleParadiso Builders Private LimitedRfwj2j0zuqz/Q8zsfewo/G==31-05-2024 00:00:00
Shree YashodhanK Mehta And CompanyE8hzguwjw6nm6dn7cjzxbw==30-09-2025 00:00:00
Orchid TowerShree Laxmi Estate Pvt. Ltd.Wghra9fonmcak01tbhciuzlcoe4bsz8vimwj90trrgc=31-03-2026 00:00:00
Ananda ResidencyParadigm Ambit BuildconNhfxqbot8wbhmecajmbirxggtwijr03fskytxgjeg8s=31-12-2019 00:00:00
Sakshat NavkarNavkar Infra Projects4Ftzuz95iazeikpjlkzhpxgu/3Gdk1xd0tqiz1pnwss=30-09-2019 00:00:00
Navkar ParadiseNavkar Infra ProjectsGsczomozptug66dezbw7vtbi+Kdgi6/Ofgzehnhtv0y=15-06-2021 00:00:00
Rosary Villa Co Operative Housing Society LimitedJay Vee ConstructionSmc3c8vt9gqayrpksbnocbidztvqgxcrxfwji3cxoa3bb7mihz9+Gnu57pouxnvc31-03-2018 00:00:00
Palkhi AuraKcd And Synergy VenturesDukgb9/Ysupj/Tnranawig==31-12-2019 00:00:00
Rite AspireRite Developers Pvt. Ltd.K0+Vf0fzpjs2cslebgkrww==30-06-2021 00:00:00
Ashtavinayak NxAshtavinayak InfrastructureUmmfxwidvtcdgy0zl4p75cjkqltugqi6szkwd3bi91q=31-03-2019 00:00:00
Kamla Prasanna Jeevan Building1Kamla Homes And Lifestyles Pvt LtdHhv6jbdyqgau7jf7xusghq==31-03-2025 00:00:00
Kamla Prasanna Jeevan Building 2Kamla Homes And Lifestyles Pvt LtdMmdlderjpu455woxfdsgka==31-03-2025 00:00:00
Om SamarpanK Mehta And Company+Uqdatqq02brjolymxnkr3lttugfltghgmgs9rljvi0=31-07-2019 00:00:00
Shiv AaradhanaBrightmen Buildspaces Llp7Jamtfw/Rdpu3yhhqqbqgw==30-12-2023 00:00:00
Rustomjee SummitKeystone Realtors LimitedTrhrq1qevvvlgmgvnylxyq==31-12-2021 00:00:00
Rashmi VasudeoModi's Navnirman LimitedTotziradavajcmsoeizv5g==11-08-2025 00:00:00
Bank Of India Employees Sukhada ChslM/S Hirani RealtorsUsnslvhjld7oary6qgmrgq==10-06-2026 00:00:00
Kasturi MilanH Rishabraj Realty+Rh7nunxssnnqaw2ppi7wq==28-02-2025 00:00:00
Madhuban HeightsWadhwana Housing Development And Infrastructure CoMr7gfpfibxc3wn06xrp4za==31-08-2018 00:00:00
Target The MallMahendra Jamnadas KaraO6tjintsywmhn3jtkv1zdtaedm3nltlf/Qiwt3w6bmw=31-12-2017 00:00:00
The ZoneMs Amann Raj Housing And Development CorporationWdg+B8hxdydwwcewjxzabl6w11j2lfixogbdcvf5l/Gwqcbaxwzefwnl5upbrn/Rfm5oy4bmqg+/Ff54feizma==31-01-2021 00:00:00
AureateNext Space Realty LlpOhchb6psvfj/En2idpcl4em2tb4el7sr57gzd8qsush+9A8eokb4cocprz1lxtd+Scc4oee7npieigze+Vuyi6gi7lhb/Bbrkmzar3xi3u4x/Siirv6m1gp+Iasycvwa30-06-2027 00:00:00
Meghalok HeightsS S Landmark Private LimitedQw2twsb5a9yzwpm50pvrkw==31-12-2025 00:00:00
Ganesh Siddhi 2Shanti Enterprise400092, Mumbai Suburban08-01-2018 00:00:00
Vilas Vaibhav ChsAditya Developers400092, Mumbai Suburban25-12-2019 00:00:00
Sai Laxmi ChslShreejani DevelopersFwfmyydir/Qjgppbsy/3Eziaite74limswwpdw6bjcw=31-12-2017 00:00:00
Ekta Apartment Upto 17Th FloorAditya Enterprise 0F6qnzdzeajed7+Kubynjq==31-03-2019 00:00:00
VrindavanRight Channel Construction Pvt LtdCarter Road No 331-12-2017 00:00:00
Kcd RidgewoodKcd Heritage Pvt LtdBorivali, 400092, Mumbai Suburban29-02-2020 00:00:00
Shraddha ParadiseShraddha Prime Projects LimitedPp5wyv8nhamja7wycq9rilfg7/H+Aerux2fby84fxys=31-12-2028 00:00:00
Proposed Red On Plot Bearing Fp No 40 Of Tps Iii Village Borivali West MumbaiSurbhi Midas ConstructionC8bjqxgwo1fvz2enmax3sq==31-05-2025 00:00:00
101 BoulevardH M DevelopersTtu4s9tpp4kmo9yguwtnwy16pxwxz6ngzacs7q//Rvi=30-06-2026 00:00:00
Redevlopment Of Rajendra Nagar - Shree Ganesh Chs Ltd.Kaustubh Construction Private LimitedW1uctr/Wqtozxf9hv8eega==31-12-2018 00:00:00
Rustomjee PinnacleKeystone Realtors LimitedTrhrq1qevvvlgmgvnylxyq==31-12-2018 00:00:00
Pushp Vinod-3Vas Infrastructure Ltd.Mumbai Suburban, 40009215-12-2015 00:00:00
Paarijat Chs LtdMaan Housing DevelopmentJdyxeqv4l38axjqbbithnq==31-12-2018 00:00:00
Rooprajat EnclaveSiddhivinayak DevelopersVt1crgrkjcyrwe9o+Wfgyw==30-12-2021 00:00:00
Borivali Yashodhan ChslTgn Realtor LlpH1ydfyazwnqsgkfguxo+Ha==30-06-2024 00:00:00
KASHI BHUVANBHARAT V KENNY1011/A31-12-2024 00:00:00
ASHIRWAD CHSLKRANVIS REALTY LLP21901-08-2025 00:00:00
Neelkamal HeightsOsho DevelopersNf29p/Ysv6pvovtywscrfw==31-12-2017 00:00:00
New Anamika Triveni FortuneTriveni DevelopersMumbai Suburban, 40009230-09-2017 00:00:00
Mangaldeep Chsl.Dhariwal Constructions (India) Private LimitedRnk+Jy4nhvebkxodliafmg==31-12-2018 00:00:00
Avyukta RajhansShivoham Infrahomes LlpPstqroatyst/Z2r8muzgmw==31-12-2024 00:00:00
Rishabraj RameshwarH Rishabraj Realty+Vwoh6hxo7a/Vjxzufl9sq==31-08-2024 00:00:00
Manusmruti ChslGoyal Wedevelopment Pvt LtdMzqqpk3vif7pkdpo1yulla==31-03-2024 00:00:00
Gautam PrabhuH Rishabraj RealtyNypezzhkdrtqoptt/Qxboq==30-04-2027 00:00:00
103 WestM/S. Relcon Zp Je Construction LlpFmq6rurkazksxgo+Alsysa==31-03-2029 00:00:00
Alliance EternisAlliance City Developers Realtors Pvt LtdBbqmsplyj2zf7c4vhhn6ig==30-04-2027 00:00:00
Sbi Ragvihar ChsTuvin Consultancy Llp/Pnegt/5Coplf0ogc2d4za==10-12-2020 00:00:00
Borivali Ranjee ChsAditya Developers400092, Mumbai Suburban27-12-2018 00:00:00
Adinath ChsAditya Developers400092, Mumbai Suburban22-04-2020 00:00:00
Modispaces AmazonModispaces Real Estate Pvt Ltd2Ogqhyhyfohnm10l4pmnhluxorumaso5ujrfud1tem0=31-12-2019 00:00:00
Krishna KamalGraphic Housing Developments Pvt. Ltd.Yek7e9xwzpvdlweiiuj5jw==01-03-2020 00:00:00
Fortune Avirahi Wing AFortune ConstructionsXdxuagp4+Pjlndvykxvbkkjtrblhqjyap/13X7iqiw4=30-12-2022 00:00:00
Vir EnclaveJkd Engineers And Infrastructure Private LimitedAlopr7c+8Dhxnrab5knlfa==30-06-2025 00:00:00
Jay KrishnaThe Green VenturezJbhhsmkrydpsdqb7r5jtsw==31-12-2025 00:00:00
Preesha ParadiseVastu Realtors And DevelopersMlhmjwgmcni5mg0ujpmpqg==31-12-2025 00:00:00
Parag - Reserve Co-Op Hsg SocSadguru Buildspacespvt. Ltd.3Hnhjahsx9++Vxwv1sgthq==30-12-2020 00:00:00
Redevelopment Of Ulka ChslPranav Constructions LimitedVzxaazrzecxydaicme6xfxvofdngevlwggzkzuamy/+Paiiqp6t5w62xx6guhsnpqcyi3voutlc9guvgxkm7ta==31-12-2019 00:00:00
Satra ParkShreenivas Developers9Cai4tmnfwz7i1kmnhlukw==30-12-2021 00:00:00
Redevlopment Of Sun And Moon Chs Ltd. Bldg No. 12 And 13Kaustubh Construction Private LimitedPnvehsygmwzgjjzzxpxbcq==31-12-2019 00:00:00
KrishnaSunit EnterpriseGvraf+1J3ddtii56966mxtewpyheuwlag0rn33bkqnw=30-12-2028 00:00:00
Rite OscarRite PropertiesBw3lzgtf0iiydxlbitduygtgf8afgseg5v5mtkpcg5e=30-06-2021 00:00:00
Ramkrupa ChslKosmos&Amp;T-CreationL T Road30-03-2024 00:00:00
Rite Nectar Phase IiRite Developers Pvt. Ltd.D/0Fkugluqrtv2a0qphndw==30-09-2022 00:00:00
Kaveri HeightsKaveri GoldZh5zlby42zlzcaoorhmvuw==30-12-2021 00:00:00
Avenue 641Dimple CreationsSruqowqkfvv7osl5nz739mloa9jr3whsyw5vxnqgcfq=30-09-2020 00:00:00
New Vandana Co-Op Hsg. Soc. Ltd.Bhoomi Associates0Ulnmwwrtxwpewn6zkwl1a==30-12-2022 00:00:00
Akar PinnacleAkar Creations Private LimitedDs2s0vhmfqxrszdxje+Kcg==31-12-2017 00:00:00
Ankur PalaceOsho Developers6+Zboysub/Z3mqeckaqfbg==15-08-2019 00:00:00
Samet Sikar MahalKothari Construction CompanyCgiva6txrjalqohy/53Xevtlteom5mohgwvbmkrvfwqjdnjgdefki5/Bwmuodqu8j7u1bguvhgclddhrheuahq==31-12-2018 00:00:00
Bella VistaSidharth EnterprisesUphsl30nv6gl50psw8n9mq==31-12-2026 00:00:00
Chaitanya Om Shivam - Om Shivam Premises CslChaitanya Enterprises84Mnczrpwpqx3l35tlkciq==31-05-2024 00:00:00
Rbies Jaidatta ChslRbies Jaidatta ChslO5bnrb2zlbe2nbygomxozg==31-12-2023 00:00:00
Ekta Appartment From 18Th Floor To 22Nd FloorAditya Enterprise 0F6qnzdzeajed7+Kubynjq==30-12-2021 00:00:00
SiddhivinayakTriumph Ventures0F6qnzdzeajed7+Kubynjq==30-06-2021 00:00:00
Borivali Gulmohar Terrace ChsAditya DevelopersFvvap+1W4dgxz1jkfph14w==25-12-2019 00:00:00
Sajag ChsNavkar Infra Projects5S6snxgjtjt3dgklkx6bmw==24-06-2019 00:00:00
Om Satyam Niwas Chs LtdGreenfield Developers & Realtors LlpRkq6f7lurgk/Q6vmvhkblccij6f0c4oldzxtbfzqtfmmjgierg+K9uqqjirkytwprpfq8evst/Xmkbr3n2ojkw==31-07-2020 00:00:00
Dlh KesleyDlh Pansn Developers LlpLthbsqomckzkfg2zc39f9g==31-03-2019 00:00:00
Ostwal TowerUnnati Builders5M3kmkuaxv2ehz7qd9x0pg==31-12-2018 00:00:00
Mayur Pankh Chs Ltd.Brightmen Buildspaces LlpOdltdaghukpxcdmkngovwa==30-12-2022 00:00:00
Rakhi Tower Phase 2 9Th To 11Th Floor PartWestern DevelopmentsMumbai Suburban, 40006621-12-2020 00:00:00
Rishabraj AradhanaH Rishabraj RealtyY5sxysqg5zdsk0rjndpmpg==31-07-2026 00:00:00
Borivali Kesar Kripa Chs LtdBorivali Kesar Kripa Chs LtdQabuheoe+Mqss0p/Zfpy/Q==31-12-2027 00:00:00
SwastikReliance CorporationDxcyhwmruvmzh2l9bqfvqg==30-09-2026 00:00:00
Pushp Vinod - 15Vas Infrastructure Ltd.Mmv5sj/+Wzraxz4wviucya==30-12-2021 00:00:00
MadhukunjDhara ConstructionDu2qhvj00imo+Duwgrfvsodo93hcxfvh1+Ehyptkdas=31-03-2018 00:00:00
Ami ChslMehta Group3Cyxjzqnds9b5p672mkkpswkkxzb3rmp5fu2l7xrp3zb7cbmkqotsyqgseoacdcr31-12-2018 00:00:00
Himat Mansion Chs LtdBhatia Builders And Developers Pvt LtdcTa2a4komixsk0cnxcinfua==30-06-2027 00:00:00
Krishna KoynaJkd Engineers And Infrastructure Private LimitedWyt5uaziopfpm1/Unmtwygzdue7n0qoy6gd+Pcfozto=15-05-2024 00:00:00
Royal EksarKosmos DeveloperBorivali West09-04-2026 00:00:00
Muktangan ResidencyRaaz Mohammed Abdul Samad PathanIeeob4ym+Pwncbi6un8wzytadkk8fj0iqbd1rk36vgk=31-10-2027 00:00:00
Anmol ResidencyB B EnterpriseNe2gbhrptgulmii1ocepyg==31-12-2028 00:00:00
Anjani ShikharGeetaspans Realtors Private Limited1Kx3kwz3nd1gs73m5wlhxg==31-12-2027 00:00:00
Om Moti Nagar ChslRenovator ConstructionE8l3gnio/2Esxqs2tuumn+H8055sjtifnqo1qvlrre4=30-06-2024 00:00:00
Anjani TirthGeeta Space RealtorsVrzjq5fysmd3amvbjrodzpxyrlw3fssw28reuy0g7dc=31-12-2024 00:00:00
Auris Business CentreDev Pooja Builders Pvt LtdCu5b0fb2nzes96gktfdr1q==31-12-2024 00:00:00
Vira AvenueVira Realty India Private LimitedV1qvn1nkcezsd8mko81n1a==31-12-2026 00:00:00
Dollars Avenue ChslM/S Hirani RealtorsWdo3hbdvzglkjxpv7pziyw==02-11-2027 00:00:00
Pratham - By ShraddhaShraddha Prime Projects Limited0Dhooynxpjsglqxlkpi+2Ooiiko+4Hxi5j2vdedjvsi=31-12-2029 00:00:00
Nicco Vanashri And Nicco HeightsNew India Construction CompanyVglwg6wrkpn/Lssjs3t+Uixqq54hgvcr9yhyt4d+77Efjrrd4klw1epwrygfxu2n31-12-2028 00:00:00
Borivali Veer DhavalShree Durga Vastu Makers LlpNwe1z7hxr1oq3x8j9m3+Zhtgn3chc2wtzab4xy2dkgkuwcjhndbdrfucnn4wsldq3pyys/Chvmeqrkqfkljzaxuhktpfpcwcxbp4+Wf/Sxy=31-05-2024 00:00:00
Ajmera ManorAjmera Manor Private LimitedLoxnpde8y8i2c6e4hwy2uzhz6y/Ujtjehwd7gxngt4qge2turucvzhchpekftbpf31-12-2025 00:00:00
Anamika Niwas ChslltdAnamika Niwas Chs Ltd5Inqwywnmihmpaqjocgw8a==31-03-2024 00:00:00
DhanrajAneisha Livings LlpFzqcpm7tnfeufr347btlvw==28-02-2025 00:00:00
Unicorn HeightsTeoama Infrastructure Private LimitedGglw2u/3Pcwcznlspaomnhlcxcqw/Uflnnlwz8z3nle=30-06-2025 00:00:00
ZENONENTITY DEVELOPERS PRIVATE LIMITEDDattapada Road, Opp Dattapada Bmc School31-12-2025 00:00:00
MahirrShree Balaji EnterpriseDuezwocs3vf4adbaa7ytuv8fa2qn0es2p4f+Manpxl4=31-12-2026 00:00:00
Kedar DarshanKosmos Developers+K7uqcknddbtfpuxbnlolq==11-04-2027 00:00:00
Kaveri HeritageKaveri Shine Builders And Developers LlpI2ci4eieaijqqbzwpzx+Jg==31-03-2025 00:00:00
Borivali New Roma Sadan ChslSumukh InfraprojectJptqfcg0uvxkt5+Qgqxbzq==30-06-2023 00:00:00
Brahma AashirvadM/S Brahma RealtorsL4fw/Xb/Bde+Esmzgx5ywg==26-02-2026 00:00:00
Rathi NiveraGhori Developers3Aoc9iyia6z/0Vu90u3ovg==31-12-2026 00:00:00
Triguni HeightsTriguni Builders & Developers Pvt LtdEjrceqgs/Pl0eioys+T9dg==31-12-2027 00:00:00
Zen PristineKonark Shakti Group Of CompanyBx/Ic+Ygfnc7f2cnmgfj5w==31-12-2028 00:00:00
Ipsit Anand MangalNavkar Developers9Sgjge1/Brkn6ea6uvzb2d8b9qnqewkerqdvkea5eh/V43sjittny7shqgihaxuf2losw56+Xrln361adla61g==31-12-2027 00:00:00
The Jambli Galli Chs LtdMahavir Corporations5Iyewjzapmayblkx9vbwgq==31-03-2024 00:00:00
Maya MamtaGreenbuilding Lifescapes LlpXg9ydromzadlfey8cid30w==07-10-2025 00:00:00
TreviAshirwad Nice Developers1Bhxkrolxvxgicmpwczdgstiiqamtmutvici0x+R5rw=31-12-2025 00:00:00
New Abhiram Chs LtdPeerless Constructions Pvt. Ltd.Ejrceqgs/Pl0eioys+T9dg==30-06-2025 00:00:00
Garden ViewSmlife Shreeji Developers LlpOi19z2eonrb20x5rp5o9xa==30-05-2025 00:00:00
House Of Shreeji SharanMiles Infra Llp5C2fi473ncghad8z314zla==30-09-2026 00:00:00
Balaji Heights Redevelopment Of Rajendra Nagar Om Sairam Chs LtdBalaji Builders And DevelopersIi3/Ouu7o9ncusak2/Idxg==31-05-2027 00:00:00
AAKRUTI BUILDING NO. 4 AND 5AAKRUTI BUILDERS & DEVELOPERS15A/2/B/1 And 15A/4,5A,6A And 18/1,2,3 And 19/1,2 And 20,1,230-06-2021 00:00:00
Rishabraj MangaleshRishabraj Infra LlpJnogpjz9e00iq1tf8jaxgw==31-12-2026 00:00:00
Rashmi CelestiaModi's Navnirman LimitedJqumxfuyex+Ic1dpcmloaa==11-08-2025 00:00:00
Sanjay Abode – Shree Vijay C-D Wing Chsl Sanjay Habitats Llp31-12-2027 00:00:00
ArhamDsd Realty 31-03-2030 00:00:00
Parshuram HeightsSpacewalk Realty Llp30-09-2028 00:00:00
Rishabraj AnujaH Rishabraj Developers30-06-2028 00:00:00
The CrimsonI M Builtkon Private Limited30-12-2030 00:00:00
Jessika Chs.Ltd.Vinayak DevelopersPa/Neqil66m+54Atxxa7ow==30-12-2020 00:00:00
AtulyaPhoenix Developers/2Iy8ztmc4wnu4ewskljea==31-12-2026 00:00:00
AurumRd Brothers Realty Llp01-06-2028 00:00:00
Megh Mahal ChslSamarpan Homes & Developers31-12-2027 00:00:00
GiirnarMahavir Land Developer31-12-2029 00:00:00
Shreenath RegencyShreenathji Infracon Build Private Limited31-10-2027 00:00:00
Avyukta JayeshShivoham Infrahomes Llp31-03-2029 00:00:00
Ebhaan EnclaveSawant Constructions31-05-2027 00:00:00
ChaitanyaOvk Co-Operative Housing Society Limited31-12-2027 00:00:00
Gold LeafShelaji Horizon Llp31-12-2029 00:00:00
Harshail Iris ApartmentHarshmaan Spaces Llp30-09-2029 00:00:00
25 RbcRander Bandhu Corporation Llp31-03-2029 00:00:00
66 Infinia Parsh Realtors31-12-2028 00:00:00
One ReserveNeminath And Disha Realtors31-12-2030 00:00:00
Manorama JewelM/S Manorama Corporation31-08-2028 00:00:00
Vanita Niketan Co Operative Housing SocietySamarpan Buildtech Llp31-12-2028 00:00:00
Narayan ResidencyNarayan Vventures30-01-2030 00:00:00
Shimpoli Sai SmrutiShaurya Realty31-12-2027 00:00:00
Project Details
  • Project:
    Madhuban Heights
  • Location:
  • Mr7gfpfibxc3wn06xrp4za==
  • Const. Stage:
    Ongoing
  • Possession:
    31 Aug 2018
Developer Details

  • Developer:
    Wadhwana Housing Development And Infrastructure Co
  • Phone:
  • Address:
  • Madhuban Heights
Project RERA Details
MAHA REARA No: P51800006442
Project Type Others
RERA Project Status Ongoing
Architect Ellora Project Consultants Pvt Ltd
Funding Bank STATE BANK OF INDIA
Proposed Possession 31 Aug 2018
Revised Possession 31 Aug 2018
Extended Possession 28 Aug 2024
Litigations No Litigations
Last Modified 12 Aug 2023
Last Retrived 13 Feb 2026
Madhuban Heights QR Code
Madhuban Heights
MahaRERA - P51800006442
Apartment Details & Configuration
TypeArea
3 BHK T166.94 Sq.mts. ( 721 Sq.ft. )
3 BHK T271.45 Sq.mts. ( 769 Sq.ft. )
3 BHK T375.2 Sq.mts. ( 809 Sq.ft. )
4 BHK88.45 Sq.mts. ( 952 Sq.ft. )
Shop12.65 Sq.mts. ( 136 Sq.ft. )
Shop13.06 Sq.mts. ( 141 Sq.ft. )
Shop18.26 Sq.mts. ( 197 Sq.ft. )
Shop20.22 Sq.mts. ( 218 Sq.ft. )
Shop23.02 Sq.mts. ( 248 Sq.ft. )
Shop26.37 Sq.mts. ( 284 Sq.ft. )
1 BHK28.66 Sq.mts. ( 308 Sq.ft. )
2 BHK T147.39 Sq.mts. ( 510 Sq.ft. )
2 BHK T363.75 Sq.mts. ( 686 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Madhuban Heightslast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space90% completed
90% Complete
Work In Progress
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Work In Progress
Energy management100% completed
95% Complete
Work In Progress
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Done
Landscaping & Tree Planting100% completed
95% Complete
Work In Progress
Open Parking100% completed
95% Complete
Work In Progress
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Dome
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Done
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Done
Water Supply100% completed
95% Complete
Bmc Water Connection For Rehab Done Part Oc Recvd
Buildings / Wings in Madhuban Heights
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Madhuban Heights by Wadhwana Housing Development And Infrastructure Colast updated on 13 Feb 2026 as per information obtained from MARA RERA.

22051 Sq. ft.

Project Area

3307 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

28 apartments in total
Total
28
Booked
26
Available
2

Saleable Area Statistics (Sq. ft.)

16602 Total
Total
16602
Booked
16101
Available
501
Total 28 apartments in project. 26 apartments booked. 92% apartments booked.
Total 16602 Sq.ft. saleable area. 16101 saleable area booked.
97% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AAug 201815101091
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK T166.94 Sq.mts. ( 721 Sq.ft. )4
4 Booked100% Booked
100% Booked
3 BHK T271.45 Sq.mts. ( 769 Sq.ft. )5
5 Booked100% Booked
100% Booked
3 BHK T375.2 Sq.mts. ( 809 Sq.ft. )5
5 Booked100% Booked
100% Booked
4 BHK88.45 Sq.mts. ( 952 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop12.65 Sq.mts. ( 136 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop13.06 Sq.mts. ( 141 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop18.26 Sq.mts. ( 197 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop20.22 Sq.mts. ( 218 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop23.02 Sq.mts. ( 248 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop26.37 Sq.mts. ( 284 Sq.ft. )1
None Booked0% Booked
0% Booked
22 total apartments / 20 apartments booked. 90% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BAug 2022151010821
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.66 Sq.mts. ( 308 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK T147.39 Sq.mts. ( 510 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK T363.75 Sq.mts. ( 686 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK66.94 Sq.mts. ( 721 Sq.ft. )2
2 Booked100% Booked
100% Booked
6 total apartments / 6 apartments booked. 100% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Wadhwana Housing Development And Infrastructure Co
for Project
Madhuban Heights
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation