Project overview

Madhu Milind Co-Op Housing Society Ltd is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700034830. Madhu Milind Co-Op Housing Society Ltd is located at Tika No. 22, C.T.S. No. 17/B. This is a New being developed by Aditya Associates.

Madhu Milind Co-Op Housing Society Ltd has 2 BHK, 3 BHK, 4 BHK & Shop Apartments with carpet areas ranging from 1155 to 1066 Sq.ft. Carpet. The Project has total 47 of which 3 are currently available for sale.

Madhu Milind Co-Op Housing Society Ltd is being developed on a total land area of 12566 Sq.ft. Madhu Milind Co-Op Housing Society Ltd has 1 Wings / Towers Madhu Milind Co-Op Housing Society Ltd

ProjectDeveloperLocationPossession
Sai ApartmentsGajanan Kotkar & Nandini Kotkar5931-12-2018 00:00:00
New Kirtikar ProposedChaturthi Developers40060201-07-2025 00:00:00
Shanti KunjShreyas Enterprises616,617,61831-12-2017 00:00:00
Royal Height - Building BNew Royal Construction Company.1025 Part And 112030-12-2021 00:00:00
GiriviharAbhinandan Enterprise77-A/4 And 631-05-2019 00:00:00
Nandishwar PlazaNandishwar Cons CoS No 13 Hissa No 410-08-2023 00:00:00
Empire TowersLakhani Realty Llp208/4 214/631-07-2024 00:00:00
Manorama ChsRupa Properties & Securities Pvt. Ltd.Cts No 926 To 933 And 94231-12-2019 00:00:00
Vaikunth Cluster 4APiramal Estate Private Limited100/24-30,100/31A,31B31-07-2024 00:00:00
Vakratunda ChsArya Enterprises43/931-12-2025 00:00:00
Suprabhat C.H.S. Ltd.Suprabhat Cooperative Housing Society LimitedCts 1732, Tika No 1331-05-2024 00:00:00
Diwa Swapna Co. Op. Housing SocietyL. K. RealtorsS/No.37/3, C.T.S No.366, 36731-07-2025 00:00:00
Redevelopment Of Manas ChsArvij Builders And Developers Private LimitedCts No 118/B Of Naupada, M G Road, Thane07-05-2022 00:00:00
Dreamland Co-Op. Hsg. Soc. Ltd.Vaastusukh DevelopersTika No.2130-12-2021 00:00:00
Viraj HeightsV-Raj BuildconTika No 20 Part, City Survey No 1025 A Part30-12-2026 00:00:00
Madhu Milind Co-Op Housing Society LtdAditya AssociatesTika No. 22, C.T.S. No. 17/B10-03-2025 00:00:00
Rohit Co-Op Housing Society LtdVedant ConstructionFinal Plot 283 Sub Plot 7 Vill Panchpakhadi Thane31-12-2024 00:00:00
HundiwaleAditya Associates1513, 1514, 151516-09-2023 00:00:00
PadmalaxmiKedar Bhikaji Bapat945 946 947 And 94831-03-2018 00:00:00
Ashwa PlatinumAshwamedh Builders And Developers75531-12-2019 00:00:00
Imperial Heights S1 S2Kamran Livestock & Real Estate Pvt Ltd2/9 Pt 2/11 Pt 2/12 Pt 2/13 Pt31-12-2019 00:00:00
AudumberAadyashakti EnterprisesSn 6631-12-2018 00:00:00
ShivkrupaAnant Arjun Madhavi3931-03-2018 00:00:00
Snehadeep Co-Operative Housing Society LtdJoshi EnterprisesSurvey No.8, Tikka No.2 Part Corresponding Totikka No.16, Cts No. 6031-12-2017 00:00:00
Shree Pradyumna Co. Op. Hsg. Soc. Ltd.Joshi And Yash Realtors LlpCts No 53 Tika No 1230-06-2025 00:00:00
Datta SamarthPandurang Arjun ChawanSurvey No. 1277, 1278/A, 1279/A, 1280/A, 1281/A30-06-2024 00:00:00
Pushpak HeightsJ K AssociatesCts No 13/431-12-2024 00:00:00
Sandhya BuildingS D Bhalerao Constructions Pvt Ltd - Sandhya3 Cts No 27 Tikka No 2131-03-2019 00:00:00
Sahakar NiwasJnm EnterprisesCts 147/2, Tika 12, Fp 262 Part31-08-2018 00:00:00
Ghantali Sainath PlazaKalpataru EnterprisesTika No.15 Cts No 13A Pt10-08-2022 00:00:00
Redevelopment Of Parijat Building Of Sanksriti Nagar Coop Hsg Soc LtdOjass ConstructionsTps 1, Final Plot No 226, Sub Plot No 1719-12-2021 00:00:00
Madan VilasIshaan Enterprise24/1 27/2 31/131-03-2018 00:00:00
CrossvillaShreeya EnterprisesCts 25,16130-06-2021 00:00:00
Shree SadanShrinivas Dattatray Kale761 Tika No 1131-01-2020 00:00:00
Rajesh Co-Operative Housing SocietyJoshi EnterprisesThane, 40060208-08-2019 00:00:00
TrividhCosmos Skyline Green View Llp60/A28-02-2029 00:00:00
Debonair ClassicAnant Square DevelopersT.P.S.No. 1, Final Plot No. 365/B30-04-2029 00:00:00
AshirwadGautam Shanti EnterprisesTika No.23, Cts91/231-07-2027 00:00:00
Arvind Co-Op Housing Society LtdAditya AssociatesCts 75/A/2 Tika No. 15, Sector No. 2, Mouje Naupada08-06-2027 00:00:00
Pradeep Co-Operative Housing Society Ltd.Squarefeet Real EstateFinal Plot No. 269 And 270, T.P. Scheme No. 130-09-2027 00:00:00
Vinu Icchapurti ApartmentAtharva Constructions191, 193 & 194 Tika No 131-03-2026 00:00:00
Thana Co-Op Housing Society SopanAditya AssociatesCts Nos 108 / 8, 110A / 4, 108/9 Part Veer Savarkar Path Old Bombay Agra Road Thane West31-12-2019 00:00:00
Anmol SapphireM/S Ekdant Housing53/B/701-08-2019 00:00:00
Redevelopment Of The Bombay Thana ChsGaurang Properties Pvt. Ltd.Shivaji Nagar, 40060231-12-2019 00:00:00
MaithiliSharda Vastu Nirmitee Pvt. Ltd.25/Fp 145/341 -10/345 - 2 -3/350-5 P31-03-2019 00:00:00
Jai Jhulelal Co. Op. Hsg. Soc.M/S. Shubham Developers400601, Thane31-12-2024 00:00:00
Harikunj EnclaveSamir Shrinivas KaleCts No 63631-08-2025 00:00:00
Manohar MahalSharda Vastu Nirmitee Pvt. Ltd.Final Plot No 226 And Sub Plot No26 Tps 131-12-2025 00:00:00
New Aparna ShaileshDinanath Kashinath Thanekar168130-12-2024 00:00:00
RhythmAradhana Lifespace LlpCts 247/230-06-2026 00:00:00
Geeta PlazaRoyal DevelopersCts No243,244,24830-06-2026 00:00:00
Vaikunth Cluster 4Piramal Estate Private LimitedNo 7/1 To 14, 8/1To37, 39To42, 9/1To17, 10/2To9, 10/10A,10/10B,10/11To18, 99/13B, 15B30-12-2023 00:00:00
StarlivingTheme Developers Private LimitedT No 21 Cts No 7 Pt And 8 Pt T No 19 Cts No 30 And 3130-12-2025 00:00:00
Sapphire HeightsSpace Corporation25225-12-2024 00:00:00
Vaikunth Cluster 1Piramal Estate Private LimitedNo 7/1 To 14 8/1To37 39To42 9/1To17 10/2To9 10/10A 10/10B 10/11To18 99/13B 15B 100/14A30-12-2022 00:00:00
Suasha Co.Operative Housing Society LimitedAnantnath EnterprisesTika No. 21 Cts No. 106 Sector No.2 Mouje Naupada31-12-2027 00:00:00
Bakul Co-Operative Housing Society LimitedAdhiraaj DevelopersCts No. 51, Tika No. 22, Sector No. 209-07-2027 00:00:00
Amogh RatanAashish Krishanarao Pathare1914/631-12-2026 00:00:00
Veer YashodeepYash InfraC.T.S. No 15/B/2,Tika No 21,Sector No 216-01-2028 00:00:00
Suyog Society ChsDream Realtors168/331-12-2019 00:00:00
Tropical EliteSchema Enterprises Private Limited88A,88B,9131-05-2018 00:00:00
Orchid Square Phase 2M/S Squarefeet Eco Housing Llp128/631-12-2018 00:00:00
Rahul Co.Op. Housing Society LtdSna Build-Tech7 339/1 34815-02-2025 00:00:00
Shree Krishna ChsVaibhav Developers4031-12-2025 00:00:00
Satyabhama Chs LtdMahesh Shriram BorkarCts No 8830-06-2024 00:00:00
Gaurang RoyaleGaurang Properties Pvt. Ltd.Gokhale Road31-12-2019 00:00:00
Vaikunth Cluster 2Piramal Estate Private LimitedNo 7/1 To 14, 8/1To37, 39To42, 9/1To17, 10/2To9, 10/10A,10/10B,10/11To18, 99/13B, 15B30-12-2024 00:00:00
Shree SiddhivinayakShree Siddhivinayak Developers26930-06-2025 00:00:00
Ashtavinayak ResidencyAshvattha Realty LlpCts No 67 Tika No 2331-12-2025 00:00:00
Rbi Employees Awantika Co Op Hsg Soc LtdGovind Ojass Edifice Pvt. Ltd.Cts No. 63A/1B / Survey No. 3131-12-2024 00:00:00
Highland Sky Towers A BuildingProvidence Realty LlpCts No 15,47,4831-12-2026 00:00:00
Highland Sky Tower Damani B BuildingProvidence Realty LlpCts No 15,47,4830-04-2025 00:00:00
TarabaugVidyadhar Achyut VaishampayanCts 114. 7A, 1A Of Tika No. 2120-12-2024 00:00:00
Gautam Co-Operative Housing SocietyMahesh Shriram BorkarCts No.867/B Final Plot No.34831-07-2018 00:00:00
Indira Niwas AnnexShree Swami Krupa Builders And DevelopersCts 785 To 795 230 233 839 Tika No 10 11 Naupada Thane31-12-2018 00:00:00
Dhanashree Co-Operative Housing SocietyL. K. Realtors400602, Thane31-12-2019 00:00:00
Laabh NeelkanthLaabh BuildtechCts No 2931-12-2019 00:00:00
Godrej Alive AModella Textile Industries Limited40060231-12-2020 00:00:00
SindhusmrutiYogiraj Powertech Pvt LtdTikka No 22 Cts No 5/130-11-2018 00:00:00
Amrut PlazaShreeram Builders293,29430-12-2026 00:00:00
New Thana ChsGaurang Properties Pvt. Ltd.Eastern Express Highway, 40060223-09-2018 00:00:00
Raghuanand ChsVijay Sawant400602, Thane30-06-2018 00:00:00
Suraj Rama HeightsShree Rama Shree Construction Pvt LtdFp No 383 And Fp 38530-06-2021 00:00:00
Mauli Krupa ApartmentJayvijay Builders And Developers87,8830-09-2018 00:00:00
Mai Kripa Co. Op. Hsg. Soc.Ojass ConstructionsFinal Plot No. 164/A31-03-2024 00:00:00
Shahs AvenueShah EnterprisesNaupada31-12-2025 00:00:00
Ramchandra Co-Operative Housing Society LimitedShree Ganeshay Developers45831-12-2025 00:00:00
Kalika HeightsSanjay PandeyPanchpakhadi01-01-2011 00:00:00
Kamdhenu Prasad Chs Ltd.Mahesh Shriram BorkarCts No.-28-C31-01-2018 00:00:00
AdijonJ. Alvares & Others123/A Tika No 1230-03-2022 00:00:00
Surshree Co Op Hsg Soc LtdVaibhav Shashikant KadamCts No 175, Tika No. 1231-12-2027 00:00:00
Sarvesh Chs LtdShree Swami Samarth DeveloperPlot No. 7 & 831-03-2029 00:00:00
Business BayRitu Multitrade Services Pvt Ltd7130-12-2025 00:00:00
Naiks Central PlazaClean Construction Co.Opp Gaondevi Ground31-12-2018 00:00:00
GopaldhamShree Hari DevelopersPlot No 26 Sector 5, Ulwe31-12-2018 00:00:00
Yash RealtorsYash RealtorsC.T.C No 1736 A/, Tikka No 1316-09-2020 00:00:00
Bhagirathi TowerBali ConstructionsCts No.448,G.No. 6-2/1, 6/131-07-2018 00:00:00
Atmaram SadanAditya AssociatesCts Nos110atikka No 21 Prashant Nagar Naupada Thane West31-03-2018 00:00:00
Project Details
  • Project:
    Madhu Milind Co-Op Housing Society Ltd
  • Location:
  • Tika No. 22, C.T.S. No. 17/B
  • Const. Stage:
    New
  • Possession:
    10 Mar 2025
Developer Details

  • Developer:
    Aditya Associates
  • Phone:
  • Address:
  • Kamathe Tower
Project RERA Details
MAHA REARA No: P51700034830
Project Type Others
RERA Project Status New
Architect Saakaar
Funding Bank TJSB SAHAKARI BANK LTD
Proposed Possession 10 Mar 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 28 Apr 2022
Last Retrived 26 Jul 2025
Madhu Milind Co-Op Housing Society Ltd QR Code
Madhu Milind Co-Op Housing Society Ltd
MahaRERA - P51700034830
Apartment Details & Configuration
TypeArea
2 BHK65.4 Sq.mts. ( 704 Sq.ft. )
3 BHK70.69 Sq.mts. ( 761 Sq.ft. )
3 BHK91.95 Sq.mts. ( 990 Sq.ft. )
3 BHK92.32 Sq.mts. ( 994 Sq.ft. )
3 BHK109.81 Sq.mts. ( 1182 Sq.ft. )
4 BHK119.6 Sq.mts. ( 1287 Sq.ft. )
4 BHK219.9 Sq.mts. ( 2367 Sq.ft. )
Shop99.06 Sq.mts. ( 1066 Sq.ft. )
Shop107.28 Sq.mts. ( 1155 Sq.ft. )
Shop19.87 Sq.mts. ( 214 Sq.ft. )
Shop62.77 Sq.mts. ( 676 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Madhu Milind Co-Op Housing Society Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station80% completed
80% Complete
Work In Progress
Energy management
Solar Heater To Be Installed Before Oc
Fire Protection And Fire Safety Requirements90% completed
90% Complete
Work In Progress
Landscaping & Tree Planting
As Per Tree Authority Requirement
Open Parking
Na
Parking Tower80% completed
80% Complete
Work In Progress
Sewerage (Chamber, Lines, Septic Tank , STP)90% completed
90% Complete
Work In Progress
Solid Waste Management And Disposal
Na
Storm Water Drains90% completed
90% Complete
Work In Progress
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting90% completed
90% Complete
Work In Progress
Water Supply
Water Connection Will Be Provided By Tmc After Oc
Buildings / Wings in Madhu Milind Co-Op Housing Society Ltd
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Madhu Milind Co-Op Housing Society Ltd by Aditya Associateslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

12566 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

47 apartments in total
Total
47
Booked
44
Available
3

Saleable Area Statistics (Sq. ft.)

40956 Total
Total
40956
Booked
36891
Available
4065
Total 47 apartments in project. 44 apartments booked. 93% apartments booked.
Total 40956 Sq.ft. saleable area. 36891 saleable area booked.
90% area booked.

Madhu Milind Co-Op Housing Society Ltd

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Madhu Milind Co-Op Housing Society LtdOct 2025161010053
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK65.4 Sq.mts. ( 704 Sq.ft. )12
11 Booked91% Booked
91% Booked
3 BHK70.69 Sq.mts. ( 761 Sq.ft. )14
14 Booked100% Booked
100% Booked
3 BHK91.95 Sq.mts. ( 990 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK92.32 Sq.mts. ( 994 Sq.ft. )13
12 Booked92% Booked
92% Booked
3 BHK109.81 Sq.mts. ( 1182 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK119.6 Sq.mts. ( 1287 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK219.9 Sq.mts. ( 2367 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop99.06 Sq.mts. ( 1066 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop107.28 Sq.mts. ( 1155 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop19.87 Sq.mts. ( 214 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop62.77 Sq.mts. ( 676 Sq.ft. )1
1 Booked100% Booked
100% Booked
47 total apartments / 44 apartments booked. 93% apartments booked.
Work Description in Building Madhu Milind Co-Op Housing Society LtdCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress80% done
80% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress90% done
90% Booked
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Aditya Associates
for Project
Madhu Milind Co-Op Housing Society Ltd
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation