Project overview

Maatr Waters is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700026313. Maatr Waters is located at 24/1 12/4. This is a New being developed by Maatr Enterprises.

Maatr Waters has 3 BHK Apartments with carpet areas ranging from 939 to 1018 Sq.ft. Carpet. The Project has total 32 of which 17 are currently available for sale.

Maatr Waters is being developed on a total land area of 27341 Sq.ft. Maatr Waters has 1 Wings / Towers Maatr Waters

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Maatr Waters
  • Location:
  • 24/1 12/4
  • Const. Stage:
    New
  • Possession:
    30 Sep 2023
Developer Details

  • Developer:
    Maatr Enterprises
  • Phone:
  • Address:
  • Vasant Elite
Project RERA Details
MAHA REARA No: P51700026313
Project Type Residential / Group Housing
RERA Project Status New
Architect Vitan Consultants
Funding Bank HDFC BANK
Proposed Possession 30 Sep 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 11 May 2022
Last Retrived 26 Jul 2025
Maatr Waters QR Code
Maatr Waters
MahaRERA - P51700026313
Apartment Details & Configuration
TypeArea
3 BHK87.26 Sq.mts. ( 939 Sq.ft. )
3 BHK93.35 Sq.mts. ( 1005 Sq.ft. )
3 BHK94.62 Sq.mts. ( 1018 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Maatr Waterslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Water Supply
Kdmc Water Supply After Oc
Water Conservation, Rain water Harvesting
Before Oc
Treatment And Disposal Of Sewage And Sullage Water
Na
Street Lighting
Na
Storm Water Drains
Before Oc
Solid Waste Management And Disposal
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Drain Line
Open Parking
Na
Landscaping & Tree Planting
Before Oc
Fire Protection And Fire Safety Requirements
Before Oc
Energy management
Solar Panels
Electrical Meter Room, Sub-Station, Receiving Station
Meter Room
Community Buildings
Na
Aggregate area of recreational Open Space
Na
Buildings / Wings in Maatr Waters
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Maatr Waters by Maatr Enterpriseslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

27341 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

32 apartments in total
Total
32
Booked
15
Available
17

Saleable Area Statistics (Sq. ft.)

30636 Total
Total
30636
Booked
14444
Available
16192
Total 32 apartments in project. 15 apartments booked. 46% apartments booked.
Total 30636 Sq.ft. saleable area. 14444 saleable area booked.
47% area booked.

Maatr Waters

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Maatr WatersMar 2023171010024
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK87.26 Sq.mts. ( 939 Sq.ft. )24
10 Booked41% Booked
41% Booked
3 BHK93.35 Sq.mts. ( 1005 Sq.ft. )4
3 Booked75% Booked
75% Booked
3 BHK94.62 Sq.mts. ( 1018 Sq.ft. )4
2 Booked50% Booked
50% Booked
32 total apartments / 15 apartments booked. 46% apartments booked.
Work Description in Building Maatr WatersCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Maatr Enterprises
for Project
Maatr Waters
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation