Project overview

Lodha Kandivali Project - Tower 3 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800031346. Lodha Kandivali Project - Tower 3 is located at 174C1. This is a New being developed by Lodha Developers Limited.

Lodha Kandivali Project - Tower 3 has 2 BHK & 4 BHK Apartments with carpet areas ranging from 1449 to 693 Sq.ft. Carpet. The Project has total 63 of which 3 are currently available for sale.

Lodha Kandivali Project - Tower 3 is being developed on a total land area of 10926 Sq.ft. out of which 2390 Sq.ft. i.e 22% is reserved for recreational purposes. Lodha Kandivali Project - Tower 3 has 1 Wings / Towers Tower 3

ProjectDeveloperLocationPossession
Dipti Sky City PHASE 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
SNEHAL PARADISE WING AM/S KRISHNA DEVELOPERSS No 2A H No 2B31-01-2020 00:00:00
SHREE RAJrajententerprisesSr No 39 H No 530-04-2019 00:00:00
MASTER BUILDCONMASTER BUILDCONGut No 27 Plot No 1630-03-2022 00:00:00
SAI TIRTH PHASE IPINNACLE CORPORATIONS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KASTURIJ.K.INFRAS R No 130 Hissa No 330-12-2024 00:00:00
MOHANKHEDA GREENSRAJESHKUMAR MOOLCHAND RUPAWATSurvey No 38 Hissa No 330-12-2023 00:00:00
OZONE GALAXYHALLMARK INFRA REALTY LLP64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
SHUBHAM GALAXY - B WINGNAVKAR ASSOCIATES4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
SHAFIQUE KHATIMITI TOWERRAMEEZ SHAHNAWAZ MAJEEDCts 126430-12-2021 00:00:00
ELEMENTSUMA REALTYC. S. No. 27/130-12-2023 00:00:00
SHREE SIDDHIVINAYAK PARK WING A1 AND A2SATYASHIV DEVELOPERSS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
SAI PURABWESTERN ARCH DEVELOPERS9/1/230-09-2023 00:00:00
AKSHAR EVANNAM/S AKSHAR OM CONSTRUCTIONPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B and B1RASSAZ INFRASTRUCTURE PRIVATE LIMITED369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
PadmanabhYash Govinda Build Infra LLPTika No.10, C.T.S No.222B24-10-2023 00:00:00
Orchid A to LPalava Dwellers Pvt Ltd27Pt And 139/2 Pt30-06-2018 00:00:00
Tanisha heightsM/S. BALAJI DEVELOPERSCts No. 1962-197230-03-2023 00:00:00
VIMAL SHREERITESH RAMESH JAINOld Sno 215 Hno 1 New Sno 198 Hno 130-12-2023 00:00:00
SAI PALACEPRAVIN NARASI MANANI3630-06-2022 00:00:00
SAISHIV COMPLEXSAISHIV CONSTRUCTIONSurvey No 54 By 3 Hissa No 1 And 230-12-2023 00:00:00
SWAMI SAMARTH APARTMENTMHATRE DEVELOPERS1231A30-03-2023 00:00:00
YASHOGHAR CHSBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
VISHWAJEET PRECIOUS PHASE IABHIJEET PRIDESurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
Mhatre CompoundLodha Developers Limited85/2 Pt30-06-2018 00:00:00
AASTHA RIVER VIEWAASTHA BUILDCON3 And 4 / Sec 1830-12-2022 00:00:00
PATELS PRAYOSHA - PRAMUKH SADANSAHAJANAND DEVELOPERSSurvey No 39A Hissa No 1A And 1B30-12-2023 00:00:00
BHAKTI PARKSHIVKRUPA ENTERPRISES730-03-2023 00:00:00
PRITI APARTMENTMAHESH MAHADU TARE579 To 583 , 604 A And B30-12-2022 00:00:00
RAJ REGALIA PHASE-1AAMRUT LAXMI DEVELOPERSS No. 54/3/E, 55/2, 55/330-06-2023 00:00:00
REGENCY PARK III BUILDING NO 2JOHAR HASAN ZOJWALLACts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
SEASONS SAHARASAMARTH SAI BUILDERS & DEVELOPERSS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
IndrayaniM/s Vedant Chetana Enterprises NXS No.380, Cts No 133230-12-2023 00:00:00
HARMONYBUILDMAN CONSTRUCTION225/831-12-2019 00:00:00
N G VALENCIA PHASE IIRNA Builders (NG)S No 335/3 Part Old 338/10 New30-09-2020 00:00:00
VANDANAMMETRO BUILDCONSurvey No 68Plot No 28 Hissa No 1P 3P 4P30-12-2021 00:00:00
Lodha Quality Home Tower 4LODHA DEVELOPERS LIMITED32/10P, 32/15P, 32/14P30-09-2024 00:00:00
VISHWAJEET PINK CITYGULABRAO BABURAO KARANJULE PATILGut No.48, Plot No.15,19,23,24,25,26,27 And 3730-05-2025 00:00:00
SPM Lake City Phase II Part 1KOTHARI & DESHMUKH LANDMARK LLPSurvey No 56 Hissa No 230-01-2026 00:00:00
NAVARE PLAZAOM DEVELOPERS8028 8029 803028-08-2022 00:00:00
SAI HERITAGEMITRA HOMESSurvey No 59 Hissa No 1 B30-03-2023 00:00:00
SHREE GIRIJATMAK CO OP HOU SOC LTDSHREE SARASWATI DEVELOPERSOld Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/730-12-2021 00:00:00
ANANTAM HEIGHTSKANAK REALTYS.No.101, C.T.S No.328030-06-2024 00:00:00
CAPMATRIX SQUARECapmatrix Buildcon Private LimitedB-33, 33 Part15-12-2022 00:00:00
Lodha Panacea IILODHA DEVELOPERS LIMITED240/5A Pt30-09-2023 00:00:00
SHREEMAN RESIDENCY B AND C WINGOM ENTERPRISESSurvey No 1 Hissa No 14/2, 14/1/230-12-2029 00:00:00
VALENCIAIMPRESSIONSC T S No 2065 To 2068, 1465 And 146630-06-2024 00:00:00
Silver Creast Wing -A Phase - IISHRIKRISHNA ENTERPRISESS No 83 H No 1430-03-2026 00:00:00
SIYARA ICONSHAKTI REALTY1/34/35/36/44/79/3/80/131-12-2025 00:00:00
SPECTRUMKULIN ENTERPRISES3445-3454, 3455-347401-12-2024 00:00:00
Liana CLODHA DEVELOPERS LIMITED65 /15 A (Pt)31-03-2026 00:00:00
SAI LEELASAIJYOTBUILDERS&DEVELOPERSPlot No 20 Sector 30D30-06-2024 00:00:00
SHIV HEIGHTSBALAJI DEVELOPERSSurvey No.15 Hissa No 731-03-2023 00:00:00
SHREE SAI SABURI APARTMENT-BUILDING BSHREE SAISHRADDHA ENTERPRISESSurvey No 9/3 And 16/131-03-2025 00:00:00
Vedant Palacia Phase IV Wing B-BrutusTHARWANI PROPERTIESSr.No.16,Hissa No.431-12-2026 00:00:00
DELTA STELLARNOBLE ORGANICS PVT. LTD.Plot No D-43/3 And D-43/431-12-2028 00:00:00
MAULI SADANMAULI CONSTRUCTIONCts 9039 To 904304-02-2024 00:00:00
Mount casaNagraj Mutha108B,112A/3, 113B31-12-2026 00:00:00
Upper Thane-Casa EdenLODHA DEVELOPERS LIMITED55/12 A31-03-2026 00:00:00
OMKAR HEIGHTSOMKAR BUILDERS & DEVELOPERSCts No 114831-03-2024 00:00:00
JAY RESIDENCYMUKESH VITHAL GITES.No. 111/H.No. 2/1/3/531-12-2024 00:00:00
SEVEN HEIGHTSOVAIS MUDABBIR BARDIS No 15/1 20/2 Plot No 4 And Cts No 383831-12-2025 00:00:00
Jardino ALODHA DEVELOPERS LIMITED62/2 P, 62/3 P And 65/5C P31-08-2027 00:00:00
Upper Thane-IRIS Wing ALODHA DEVELOPERS LIMITED293/1 And 293/331-12-2027 00:00:00
JIVDANI BUILDINGMILDSTONE ENTERPRISES LLP133231-12-2024 00:00:00
YASHRAJ HEIGHTSVIKRANT VIKAS RAIKAR731-01-2025 00:00:00
Shivaay AvyaanSHREERAM BUILDCONNew Survey 7,281(Old), Hissa No.230-11-2025 00:00:00
Dosti Desire - Phase 2D.D. Associates85/731-08-2027 00:00:00
SHUBH MANGALAM PHASE IISHUBH REALITYSr No 106 Hissa No 125-12-2026 00:00:00
Vardhaman Tower Building Nos. 6 & 7Vardhaman Property DevelopersPlot Bearing Surveyno.26Hissa No1(Part)31-12-2023 00:00:00
ZIRCON HEIGHTSIQBAL ABDUL RAUF PUNJABI59/1, 83/5 Paiki, Cts No 482931-12-2024 00:00:00
ARJUN VILLAMANOHAR SAHEBRAO KADAM192-J230-03-2022 00:00:00
DOSTI GREATER THANE - PHASE 1ADRIKA DEVELOPERS PRIVATE LIMITED9/4 Pt,7/8 Pt,7/1Pt, 11/25Pt,11/23Pt,12/19Pt,7/13Pt,11/17Pt,11/12Pt,11/13Pt,11/7Pt,11/1Pt,11/8Pt,11/18Pt,11/19A Pt,11/19B Pt,11/15Pt,11/16Pt,11/14Pt,11/11Pt,12/9Pt,11/21Pt01-04-2026 00:00:00
Gayatri EleganceGayatrikripa Developers Private LimitedOld Survey No. 229, Hissa No. 1330-12-2025 00:00:00
SHREE SAISHRADDHA APARTMENT BUILDING ASHREE SAISHRADDHA ENTERPRISESSurvey No 9/3 And 16/130-03-2023 00:00:00
PINNACOLO NXSKD REALTY LLPOld S.No.445,New S.No.12930-06-2025 00:00:00
Akshar Business Park- Phase IIIAkshar DevelopersPlot No. 3, Sector-2531-07-2022 00:00:00
SWARAJ ORCHIDM/S CRYSTAL HOMESSurvey No 25 Hissa No 230-12-2022 00:00:00
SURYA COMPLEXM/S. JAI SANTOSHI MAA ENTERPRISESS. No. 102, H. No.2, 3 Pt, 5, 17, 1830-06-2023 00:00:00
19 EASTMORESHWAR DEVELOPERS5230-12-2025 00:00:00
RELIANCE GOLDGOLDEN ENTERPRISESS No 58/1/4 S No 59/128-02-2028 00:00:00
BASERA HEIGHTSKAMRUDDIN HASMULLAH SIDDIQUEOld Sno 223/5 221/1 New Sno 191/5 190/130-03-2024 00:00:00
SIDDHIVINAYAK GARDENSA1 BUILDCON991, 2, 3 And 1001830-12-2024 00:00:00
SHREE SHALINIJAY SERVICE AND CONSULTANTCts No 251 And 252A30-09-2023 00:00:00
M Square IT ParkPaper FlutingsA241 And A24230-03-2024 00:00:00
SHREE GANESH SYMPHONYPAWAR GROUPS. No.172, H.No.1/801-12-2025 00:00:00
TRIMURTI GARDENSAI NARAYAN DEVELOPERSSurvey No 126 Hissa No 130-12-2025 00:00:00
Tulsi Aahan - B WingRAJ GROUPS No 39, H No 1,230-12-2022 00:00:00
TIARASagar EnterpriseS No 20 And Chalta No 2430-03-2024 00:00:00
METRO AANGAN PHASE - IMETRO CREATORSS No 78 H No 7 P And 8 P30-12-2028 00:00:00
PRAKRUTI SPARSHAVISHKAR BUILDCONS No 49, H No 10D30-12-2022 00:00:00
SAI CITYOM SAI BUILDERS & DEVELOPERSSurvey No.3/1/E,3/1/D,3/1/C31-12-2031 00:00:00
MARATHON NEXTOWN JASPERMARATHON ENER-GEN140,141/2,141/1,142/3,220/1B31-12-2027 00:00:00
Shyam ParkVishnu Shyamlal SachdevCts . No. 2077031-12-2025 00:00:00
The Universe Neptune - BGayasuddin Riyazuddin KhanS No 112/130-06-2024 00:00:00
SIYARA FORTUNE BUILDING A WING BSHAKTI REALTY8145, 8146, 8153, 8172, 8176 To 820231-12-2027 00:00:00
Satyaneelayam Co Op HSg SocietyYASH INFRA749 B31-12-2025 00:00:00
SADGURU NAKSHTRA PHASE ISADGURU DEVELOPERSSurvey No 1204A And Survey No 118330-12-2023 00:00:00
BANJARA HILLS SECTOR 7SEEMA DEVELOPERS127, 408/1, 407/230-12-2022 00:00:00
Lodha Panacea ILODHA DEVELOPERS LIMITED55Pt31-12-2021 00:00:00
BUILDING No 1 PADMAVATIM/s. SAI BALAJI EMRALD REALTYOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2022 00:00:00
SWANAND TARANGM/S OMKAR REALTORSSurvey No 43 Hissa No 230-12-2021 00:00:00
BUILDING NO 2 MAHALAKSHMI A WINGM/s. SAI BALAJI EMRALD REALTYOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
JHALAK LUXURIA PHASE IJHALAK CONSTRUCTIONSGut No 48 P Plot C, Cts No. 9353 P30-12-2021 00:00:00
BALAJI ANNEXM/S OM SWAYAMBHU SIDDHIVINAYAK BUILDERS AND DEVELOPERSSurvey No 93/3, 93/4, 93/530-12-2026 00:00:00
ARYA ARIANAASHAPURA CORPORATION5664/A30-03-2024 00:00:00
GAJANANGK BUILDCONB6330-06-2023 00:00:00
Anantam - Phase IOyster Living LLP13/230-06-2022 00:00:00
BUILDING No 2 MAHALAKSHMI B WINGM/s. SAI BALAJI EMRALD REALTYOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Aai Mauli ParkHENDAR LAXMAN MHATRES. No. 1731-12-2025 00:00:00
SHUBHAM MONOLITH D WINGGaurivinayak Builders and Developers Pvt LtdSurvey No 30 Hissa No 15A31-12-2026 00:00:00
Godrej Ascend Phase 3Godrej Properties Limited39 Part, 41/1 Part31-10-2029 00:00:00
SHETH SUPREMESHETH BUILDERS PRIVATE LIMITEDOld Survey No 159 Pt And New Survey No 20 Pt30-12-2024 00:00:00
ONE AKSHARAKSHAR REALTORSPlot No 730-12-2026 00:00:00
VEDANT KALASHSHIVALIK DEVELOPERSSurvey No 48 Hissa No 2 Plot No 5 And 630-03-2022 00:00:00
Empire Industrial Centrum Phase-IIIEmpire Industries Limited22R30-03-2026 00:00:00
Empire Industrial Centrum Phase-IVEmpire Industries Limited2230-03-2025 00:00:00
SEASONS SAHARA BUILDING NO 2SAMARTH SAI BUILDERS & DEVELOPERSS No 24/2 At Village Adavli-Dhokli Taluka Ambernath And S No 34/10, 34/11, 34/12 At Village Pisavli Taluka Kalyan30-12-2024 00:00:00
Shreeram ResidencyRaghunath Kedari Phadtare690/330-12-2025 00:00:00
JAGJEET ENCLAVEJAGJEET SHRUSTI REALTORS29/1/C04-05-2024 00:00:00
ZUNERA HEIGHTS786 MICRON BUILDERS & DEVELOPERS101/ 2 3 4 5 1230-12-2022 00:00:00
AMRUTA CHSUTKARSHA CONSTRUCTION7462/70/2403-06-2022 00:00:00
SAI SHRUSHTI SAPPHIRESAI SHRUSHTI ENTERPRISES136/1 P Sub Plot D30-12-2021 00:00:00
Umiya OasisUmiya Developers29 Hissa No 1 Survey No 30 Hissa 1,2,3A30-12-2029 00:00:00
KRISHNA GALAXYKRISHNA BUILDERS & DEVELOPERSSurvey No 42 Hissa No 230-06-2023 00:00:00
VILLA SMARANOM VILLA BUILDTECH LLPCts No 1194E And Cts No 1194A Sector 2930-03-2024 00:00:00
Virat MansionNeelyog DevelopersCts No 9907,9908 To 991330-12-2022 00:00:00
Project Details
  • Project:
    Lodha Kandivali Project - Tower 3
  • Location:
  • 174C1
  • Const. Stage:
    New
  • Possession:
    31 Oct 2025
Developer Details

  • Developer:
    Lodha Developers Limited
  • Phone:
  • Address:
  • Vardhaman Chamber
Project RERA Details
MAHA REARA No: P51800031346
Project Type Residential / Group Housing
RERA Project Status New
Architect Vilas Desai & Associate
Funding Bank YES BANK
Proposed Possession 31 Oct 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 08 Nov 2024
Last Retrived 13 Feb 2026
Lodha Kandivali Project - Tower 3 QR Code
Lodha Kandivali Project - Tower 3
MahaRERA - P51800031346
Apartment Details & Configuration
TypeArea
2 BHK64.38 Sq.mts. ( 693 Sq.ft. )
4 BHK134.62 Sq.mts. ( 1449 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Lodha Kandivali Project - Tower 3last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space15% completed
15% Complete
Na
Closing Parking45% completed
45% Complete
Na
Community Buildings
Shared Across The Phases Of Real Estate Project
Electrical Meter Room, Sub-Station, Receiving Station80% completed
80% Complete
Na
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)40% completed
40% Complete
Na
Solid Waste Management And Disposal
Na
Storm Water Drains50% completed
50% Complete
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply100% completed
95% Complete
Na
Buildings / Wings in Lodha Kandivali Project - Tower 3
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Lodha Kandivali Project - Tower 3 by Lodha Developers Limitedlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

10926 Sq. ft.

Project Area

2390 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

63 apartments in total
Total
63
Booked
60
Available
3

Saleable Area Statistics (Sq. ft.)

60292 Total
Total
60292
Booked
57457
Available
2835
Total 63 apartments in project. 60 apartments booked. 95% apartments booked.
Total 60292 Sq.ft. saleable area. 57457 saleable area booked.
95% area booked.

Tower 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 3Oct 20252310000111
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK64.38 Sq.mts. ( 693 Sq.ft. )41
39 Booked95% Booked
95% Booked
4 BHK134.62 Sq.mts. ( 1449 Sq.ft. )22
21 Booked95% Booked
95% Booked
63 total apartments / 60 apartments booked. 95% apartments booked.
Work Description in Building Tower 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
Lodha Developers Limited
for Project
Lodha Kandivali Project - Tower 3
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation