Lodha Kandivali Project - Tower 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800031351. Lodha Kandivali Project - Tower 2 is located at 174C1. This is a New being developed by Lodha Developers Limited.

Lodha Kandivali Project - Tower 2 has 3 BHK & 3 BHK Large Apartments with carpet areas ranging from 932 to 1051 Sq.ft. Carpet. The Project has total 149 of which 6 are currently available for sale.

Lodha Kandivali Project - Tower 2 is being developed on a total land area of 15808 Sq.ft. out of which 3458 Sq.ft. i.e 22% is reserved for recreational purposes. Lodha Kandivali Project - Tower 2 has 1 Wings / Towers Tower 2

ProjectDeveloperLocationPossession
Vedant Palacia Phase IV Wing B-BrutusTHARWANI PROPERTIESSr.No.16,Hissa No.431-12-2026 00:00:00
DELTA STELLARNOBLE ORGANICS PVT. LTD.Plot No D-43/3 And D-43/431-12-2028 00:00:00
MAULI SADANMAULI CONSTRUCTIONCts 9039 To 904304-02-2024 00:00:00
BHAKTI PARKSHIVKRUPA ENTERPRISES730-03-2023 00:00:00
PRITI APARTMENTMAHESH MAHADU TARE579 To 583 , 604 A And B30-12-2022 00:00:00
RAJ REGALIA PHASE-1AAMRUT LAXMI DEVELOPERSS No. 54/3/E, 55/2, 55/330-06-2023 00:00:00
SIYARA ICONSHAKTI REALTY1/34/35/36/44/79/3/80/131-12-2025 00:00:00
SPECTRUMKULIN ENTERPRISES3445-3454, 3455-347401-12-2024 00:00:00
Liana CLODHA DEVELOPERS LIMITED65 /15 A (Pt)31-03-2026 00:00:00
Dipti Sky City PHASE 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
SNEHAL PARADISE WING AM/S KRISHNA DEVELOPERSS No 2A H No 2B31-01-2020 00:00:00
SHREE RAJrajententerprisesSr No 39 H No 530-04-2019 00:00:00
MASTER BUILDCONMASTER BUILDCONGut No 27 Plot No 1630-03-2022 00:00:00
SAI TIRTH PHASE IPINNACLE CORPORATIONS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KASTURIJ.K.INFRAS R No 130 Hissa No 330-12-2024 00:00:00
Shivaay AvyaanSHREERAM BUILDCONNew Survey 7,281(Old), Hissa No.230-11-2025 00:00:00
Dosti Desire - Phase 2D.D. Associates85/731-08-2027 00:00:00
SHUBH MANGALAM PHASE IISHUBH REALITYSr No 106 Hissa No 125-12-2026 00:00:00
RITZ PHASE - IIVIKAS HARAKCHAND JAINSurvey No. 39/5 Part, 6/1 Part And 6/2 Part.30-06-2024 00:00:00
GANPATI HEIGHTSMANOJ PRABHAKAR PATILS. No 2 H No 23B30-05-2024 00:00:00
OMKAR DARSHAN CO OP HSG SOCVINOD MADHUKAR BHOIRS No 26 H No 2A Plot No 430-06-2024 00:00:00
MOHANKHEDA GREENSRAJESHKUMAR MOOLCHAND RUPAWATSurvey No 38 Hissa No 330-12-2023 00:00:00
OZONE GALAXYHALLMARK INFRA REALTY LLP64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
SHUBHAM GALAXY - B WINGNAVKAR ASSOCIATES4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
Lodha Quality Home Tower 4LODHA DEVELOPERS LIMITED32/10P, 32/15P, 32/14P30-09-2024 00:00:00
VISHWAJEET PINK CITYGULABRAO BABURAO KARANJULE PATILGut No.48, Plot No.15,19,23,24,25,26,27 And 3730-05-2025 00:00:00
SPM Lake City Phase II Part 1KOTHARI & DESHMUKH LANDMARK LLPSurvey No 56 Hissa No 230-01-2026 00:00:00
SAI LEELASAIJYOTBUILDERS&DEVELOPERSPlot No 20 Sector 30D30-06-2024 00:00:00
SHIV HEIGHTSBALAJI DEVELOPERSSurvey No.15 Hissa No 731-03-2023 00:00:00
SHREE SAI SABURI APARTMENT-BUILDING BSHREE SAISHRADDHA ENTERPRISESSurvey No 9/3 And 16/131-03-2025 00:00:00
Mount View R4 to R7Himanshu Builders & DevelopersS No 67/3A 68/9B31-12-2023 00:00:00
BALAJI VIVANTAMAYUR ENTERPRISES BUILDERS & DEVELOPERSPlot No 3 ,Hissa No 1 ,2,3 ,4 Old Survey No 71 Hissa No 1,231-12-2023 00:00:00
SHAFIQUE KHATIMITI TOWERRAMEEZ SHAHNAWAZ MAJEEDCts 126430-12-2021 00:00:00
ELEMENTSUMA REALTYC. S. No. 27/130-12-2023 00:00:00
SHREE SIDDHIVINAYAK PARK WING A1 AND A2SATYASHIV DEVELOPERSS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
SAI CITYOM SAI BUILDERS & DEVELOPERSSurvey No.3/1/E,3/1/D,3/1/C31-12-2031 00:00:00
MARATHON NEXTOWN JASPERMARATHON ENER-GEN140,141/2,141/1,142/3,220/1B31-12-2027 00:00:00
Shyam ParkVishnu Shyamlal SachdevCts . No. 2077031-12-2025 00:00:00
SAI PURABWESTERN ARCH DEVELOPERS9/1/230-09-2023 00:00:00
AKSHAR EVANNAM/S AKSHAR OM CONSTRUCTIONPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B and B1RASSAZ INFRASTRUCTURE PRIVATE LIMITED369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
Mount casaNagraj Mutha108B,112A/3, 113B31-12-2026 00:00:00
Upper Thane-Casa EdenLODHA DEVELOPERS LIMITED55/12 A31-03-2026 00:00:00
OMKAR HEIGHTSOMKAR BUILDERS & DEVELOPERSCts No 114831-03-2024 00:00:00
SAI GEETA APT.K K ENTERPRISESSurvey No 29, H N 5A, Plot No 7231-12-2023 00:00:00
LAXMINARAYAN PARKJALARAM INFRASurvey No 63 Hissa No331-12-2023 00:00:00
MANGALJYOT CO OP HSG SOC LTDSHRIDHAR DATTATRAY PATIL8/B/1/2 And 9/B/1/331-12-2026 00:00:00
PadmanabhYash Govinda Build Infra LLPTika No.10, C.T.S No.222B24-10-2023 00:00:00
Orchid A to LPalava Dwellers Pvt Ltd27Pt And 139/2 Pt30-06-2018 00:00:00
Tanisha heightsM/S. BALAJI DEVELOPERSCts No. 1962-197230-03-2023 00:00:00
The Universe Neptune - BGayasuddin Riyazuddin KhanS No 112/130-06-2024 00:00:00
SIYARA FORTUNE BUILDING A WING BSHAKTI REALTY8145, 8146, 8153, 8172, 8176 To 820231-12-2027 00:00:00
Satyaneelayam Co Op HSg SocietyYASH INFRA749 B31-12-2025 00:00:00
Gami Industrial Park - C BuildingGolden Falcon Pacific LtdPlot No C-39A31-12-2024 00:00:00
SHREEJI CLOUDSHREEJI LIFESPACES INFRASTRUCTUREPlot No 78, Sector 21 At Ulwe30-06-2026 00:00:00
PRIYAL AUMSHREE MAULI CHS LTDPlot No 47 Sector 2601-06-2024 00:00:00
SWAMI SAMARTH APARTMENTMHATRE DEVELOPERS1231A30-03-2023 00:00:00
YASHOGHAR CHSBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
VISHWAJEET PRECIOUS PHASE IABHIJEET PRIDESurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
AKANKSHA CO. OP. HSG. SOC. LTD.KRISHNA BUILDCONS.No.48, H. No.6(P)31-12-2026 00:00:00
VRINDAVAN CITY PHASE -1VANDU BUILDER LLPSurvey No. 67/4/A,4/B,4/C,4/D31-12-2030 00:00:00
SADHANA SOCIETYShree Sai Laxmi Builders and Developers13/172831-03-2027 00:00:00
DASHMESH PEARLEMPIRE REALTYSurvey No 5, Hissa No 30/B, Plot No 2 To 430-12-2026 00:00:00
JAY RESIDENCYMUKESH VITHAL GITES.No. 111/H.No. 2/1/3/531-12-2024 00:00:00
SEVEN HEIGHTSOVAIS MUDABBIR BARDIS No 15/1 20/2 Plot No 4 And Cts No 383831-12-2025 00:00:00
Jardino ALODHA DEVELOPERS LIMITED62/2 P, 62/3 P And 65/5C P31-08-2027 00:00:00
MAHADEV HEIGHTSONBV REALITYS. No. 1/3/B/1 & S.No. 1/3/B/1131-12-2026 00:00:00
PRITHVI PRIDE BUILDING NO 2PRITHVI LAND DEVELOPERSSno 22031-12-2028 00:00:00
ELANZA WING BSTONEWALL BUILDCON LLP(Old) Survey No. 462 Hissa No 4 And 7, (New) Survey No. 138 Hissa No 4 And 731-03-2027 00:00:00
Haware Paramount Kalyan Phase-IIHaware Properties LLPSurvey No. 3/2 (Pt), 3/5 (Pt)31-12-2028 00:00:00
SHREEMAN RESIDENCY B AND C WINGOM ENTERPRISESSurvey No 1 Hissa No 14/2, 14/1/230-12-2029 00:00:00
VALENCIAIMPRESSIONSC T S No 2065 To 2068, 1465 And 146630-06-2024 00:00:00
Silver Creast Wing -A Phase - IISHRIKRISHNA ENTERPRISESS No 83 H No 1430-03-2026 00:00:00
REGENCY PARK III BUILDING NO 2JOHAR HASAN ZOJWALLACts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
SEASONS SAHARASAMARTH SAI BUILDERS & DEVELOPERSS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
IndrayaniM/s Vedant Chetana Enterprises NXS No.380, Cts No 133230-12-2023 00:00:00
Upper Thane-IRIS Wing ALODHA DEVELOPERS LIMITED293/1 And 293/331-12-2027 00:00:00
JIVDANI BUILDINGMILDSTONE ENTERPRISES LLP133231-12-2024 00:00:00
YASHRAJ HEIGHTSVIKRANT VIKAS RAIKAR731-01-2025 00:00:00
ARJUN VILLAMANOHAR SAHEBRAO KADAM192-J230-03-2022 00:00:00
DOSTI GREATER THANE - PHASE 1ADRIKA DEVELOPERS PRIVATE LIMITED9/4 Pt,7/8 Pt,7/1Pt, 11/25Pt,11/23Pt,12/19Pt,7/13Pt,11/17Pt,11/12Pt,11/13Pt,11/7Pt,11/1Pt,11/8Pt,11/18Pt,11/19A Pt,11/19B Pt,11/15Pt,11/16Pt,11/14Pt,11/11Pt,12/9Pt,11/21Pt01-04-2026 00:00:00
DREAM AVENUEDREAM MARUTI REALTORSS No 15, H No 4 - S No 16, H No 331-12-2025 00:00:00
Kisan HeightsPravin Kisan BhoirS No 86/1/130-09-2027 00:00:00
Regency Sarvam Phase 12REGENCY NIRMAN LTDS No.42/1, 42/2, 42/3, 42/4A/1, 42/4A/2, 42/5, 42/6, 47/1, 50/1A, 50/2, 220/1, 201/1, 223/130-11-2024 00:00:00
Gayatri EleganceGayatrikripa Developers Private LimitedOld Survey No. 229, Hissa No. 1330-12-2025 00:00:00
SHREE SAISHRADDHA APARTMENT BUILDING ASHREE SAISHRADDHA ENTERPRISESSurvey No 9/3 And 16/130-03-2023 00:00:00
PINNACOLO NXSKD REALTY LLPOld S.No.445,New S.No.12930-06-2025 00:00:00
Aai Mauli ParkHENDAR LAXMAN MHATRES. No. 1731-12-2025 00:00:00
SHUBHAM MONOLITH D WINGGaurivinayak Builders and Developers Pvt LtdSurvey No 30 Hissa No 15A31-12-2026 00:00:00
Godrej Ascend Phase 3Godrej Properties Limited39 Part, 41/1 Part31-10-2029 00:00:00
Vardhaman Tower Building Nos. 6 & 7Vardhaman Property DevelopersPlot Bearing Surveyno.26Hissa No1(Part)31-12-2023 00:00:00
ZIRCON HEIGHTSIQBAL ABDUL RAUF PUNJABI59/1, 83/5 Paiki, Cts No 482931-12-2024 00:00:00
MOUNTAIN VIEWMADHAV BUILDSPACESurvey No 10 Hissa No 10/330-06-2029 00:00:00
JAGDAMBA CO OP HOUSING SOCIETY LTDSAI CONSTRUCTIONSurvey No. 26/2/A/30, Plot No. 28 Village Shirgaon31-12-2027 00:00:00
Sankheshwar PlazaVNG EnterprisesSurvey No 50/331-12-2026 00:00:00
SHREE GAYATRIDEEPOM SAI CONSTRUCTIONS. No. 48, H. No. 4, P. No.130-04-2027 00:00:00
NAVARE PLAZAOM DEVELOPERS8028 8029 803028-08-2022 00:00:00
SAI HERITAGEMITRA HOMESSurvey No 59 Hissa No 1 B30-03-2023 00:00:00
SHREE GIRIJATMAK CO OP HOU SOC LTDSHREE SARASWATI DEVELOPERSOld Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/730-12-2021 00:00:00
THANEKAR CIVICSHREE SWAMI SAMARTH ENTERPRISESS No 133, H No 209-04-2024 00:00:00
SAURABH RESIDENCYM/s Krishna Builders & DevelopersS No 77 , H No 2/1730-06-2024 00:00:00
VED PARADISEKULKARNI AND ASSOCIATES896631-12-2024 00:00:00
Joshi ArcadeMeera DevelopersSurvey No 34-1/12, Hissa No. 3, Plot No. 731-03-2026 00:00:00
Sai Narayana ResidencyMM Landmark Realty LLPS.No.1431-12-2025 00:00:00
Akshar Business Park- Phase IIIAkshar DevelopersPlot No. 3, Sector-2531-07-2022 00:00:00
SWARAJ ORCHIDM/S CRYSTAL HOMESSurvey No 25 Hissa No 230-12-2022 00:00:00
SURYA COMPLEXM/S. JAI SANTOSHI MAA ENTERPRISESS. No. 102, H. No.2, 3 Pt, 5, 17, 1830-06-2023 00:00:00
SHREE RAM CO OPERATIVE HOUSING SOCIETY LIMITEDSANTOSH VASANT CHITNISS No 704/2 706/6 Old , 286/2 294/6 Cts No 821 And 82231-03-2025 00:00:00
Yashshree Co.Op.Hsg.SocNitant Narendra DesaiSurvey No. 28, Hissa No. 3/2/K30-09-2025 00:00:00
Vaishnavi HeightsVAISHNAVI BUILDERS & DEVELOPERS58,H No.1 P.No. 1 & 224-06-2024 00:00:00
DASHMESH PARKSATYAM CONSTRUCTIONSCts No 2340931-03-2023 00:00:00
SHANKESHWAR DARSHANKALPVRIKSH HOMES LLPOld Sno 559 New Sno 207 Hno 1,2 Old Sno 560 New Snio 165 Hno 1Pt31-12-2024 00:00:00
EKNATH HEIGHTS - 1OMKAR ENTERPRISESSurvey No 123 Hissa No 331-12-2022 00:00:00
19 EASTMORESHWAR DEVELOPERS5230-12-2025 00:00:00
RELIANCE GOLDGOLDEN ENTERPRISESS No 58/1/4 S No 59/128-02-2028 00:00:00
BASERA HEIGHTSKAMRUDDIN HASMULLAH SIDDIQUEOld Sno 223/5 221/1 New Sno 191/5 190/130-03-2024 00:00:00
TIARASagar EnterpriseS No 20 And Chalta No 2430-03-2024 00:00:00
METRO AANGAN PHASE - IMETRO CREATORSS No 78 H No 7 P And 8 P30-12-2028 00:00:00
PRAKRUTI SPARSHAVISHKAR BUILDCONS No 49, H No 10D30-12-2022 00:00:00
FATIMA ENCLAVE- C WINGRAIS AZIZ QURESHI46/4 , 46/531-12-2025 00:00:00
SHREE PRABHUCHARAN CHS.LTDSHREE PRABHUCHARAN CO-OP HOUSING SOCIETY66/5/6731-03-2024 00:00:00
Aastha OmkarAastha RealtorsS. No. 56, H. No. 35/D/2B/1 To 35/D/2B/14 And H. No. 35/D/2B/15/131-12-2026 00:00:00
KAPLESHWARA RESIDENCYKAPLESHWARA HOMES LLP119/6C (Old), 84/6C (New)31-12-2029 00:00:00
SARA TOWERHOPE BUILDERS AND DEVELOPERS233 And 23431-12-2026 00:00:00
VEDANG LAKE CITYVEDANG CONSTRUCTIONS. No. 4 H. No. 2/1 And S. No. 12 H. No 1/331-12-2025 00:00:00
Fiora ELODHA DEVELOPERS LIMITED260/1A (Pt)31-03-2026 00:00:00
SAVALIYA HEIGHTSSHREE SAVALIYA HOMES LLPOld Sno 477 New Sno 119 Hno 131-12-2026 00:00:00
RAMAKANT ARCADEVASTU ENTERPRISESCts No. 244, 25431-05-2023 00:00:00
VIMAL SHREERITESH RAMESH JAINOld Sno 215 Hno 1 New Sno 198 Hno 130-12-2023 00:00:00
SAI PALACEPRAVIN NARASI MANANI3630-06-2022 00:00:00
SAISHIV COMPLEXSAISHIV CONSTRUCTIONSurvey No 54 By 3 Hissa No 1 And 230-12-2023 00:00:00
ZENR A CONSTRUCTIONCts No 2086430-06-2024 00:00:00
Navrang Co Op Hsg SocietyYADAV BROS CONSTRUCTIONPlot No. 3, Gut No 5431-12-2024 00:00:00
PRATHAMESH CHSLNIRMAL DEVELOPERSSurvey No 26 Hissa No 2A Plot No 3 (Old Plot No.18)31-12-2024 00:00:00
SHETH SUPREMESHETH BUILDERS PRIVATE LIMITEDOld Survey No 159 Pt And New Survey No 20 Pt30-12-2024 00:00:00
ONE AKSHARAKSHAR REALTORSPlot No 730-12-2026 00:00:00
VEDANT KALASHSHIVALIK DEVELOPERSSurvey No 48 Hissa No 2 Plot No 5 And 630-03-2022 00:00:00
Vardhaman EnclaveVardhaman Builders260/331-12-2025 00:00:00
REGENCY SARVAM PHASE 13REGENCY NIRMAN LTDMauje - Manda S No42/1,42/2,42/3,42/4A/1, 42/4A/2,42/5,42/6, 47/1,50/1A,50/2, Mauje - Titwala S No201/1,220/1,223/131-12-2025 00:00:00
Raheja Lunaris-1 - CallistoRaheja Universal (Pvt.) Ltd.Plot No. Gen-2/1/B Part-131-12-2030 00:00:00
9PBR TOWER C2MISTRY CONSTRUCTION CO. PVT. LTD.Pocket D & E Sector -60, Nerul31-12-2028 00:00:00
AKANKSHAPURTI CHSLS R DEVELOPERSSurvey No 32 Hissa No 2A Plot No 1531-12-2024 00:00:00
Celeste 612Hiralal Ramnarayan GuptaC. T. S No 1057 To 1083 At Village Mumbra Dist Thane31-12-2027 00:00:00
SHREE LAXMI NARAYAN PRASADLAXMI REALTY93/A/2931-12-2025 00:00:00
Chandrakant ResidencyAmogh ConstructionC.T.S No- 2 To 8 & C.T.S No- 169 To 178, C.T.S No- 295 To 30031-12-2027 00:00:00
Daisy Gardens Building No.13ANKITA BUILDERSSurvey No 9, Hissa No 2A30-06-2026 00:00:00
MADHUSUDAN RETREAT TERRACESMADHUSUDAN LEISURE HOMESSurvey No 5031-12-2026 00:00:00
Mhatre CompoundLodha Developers Limited85/2 Pt30-06-2018 00:00:00
AASTHA RIVER VIEWAASTHA BUILDCON3 And 4 / Sec 1830-12-2022 00:00:00
PATELS PRAYOSHA - PRAMUKH SADANSAHAJANAND DEVELOPERSSurvey No 39A Hissa No 1A And 1B30-12-2023 00:00:00
SAMBHAVISHREE VAKRATUNDA DEVELOPERSSurvey No 531-10-2024 00:00:00
SHREE MANGAL NARAYAN RESIDENCYN V CONSTRUCTIONCts 9721 To973431-12-2023 00:00:00
VAKRATUNDA HOMESNARAYAN SUNIL RANEPlot No 4,S .No 108, Hissa No 131-12-2023 00:00:00
Shreeram ResidencyRaghunath Kedari Phadtare690/330-12-2025 00:00:00
JAGJEET ENCLAVEJAGJEET SHRUSTI REALTORS29/1/C04-05-2024 00:00:00
ZUNERA HEIGHTS786 MICRON BUILDERS & DEVELOPERS101/ 2 3 4 5 1230-12-2022 00:00:00
Cyber Square - 1GREENSCAPE IT PARK LLPD-102,D-103 &D-10431-03-2027 00:00:00
DELTA LUXURIASHREENATHJI ORGANISERS PVT LTDPlot No 6130-04-2027 00:00:00
GIRIRAJ SPARSHDURA VIDA ASSOCIATES77 Tika No 18 Naupada30-06-2025 00:00:00
Panvelkar EmpireOm Sai Shraddha DevelopersSurvey No. 30/4 (P)30-06-2026 00:00:00
OM SAI ONE PARKINFINI DEVELOPERSCts 133/3 133/4 134/3 134/5 134/9 134/10 134/11 134/4/A 138/13/A 138/13/B 138/13/C31-12-2028 00:00:00
Infinity Square28-Aeon Infinity LLPC.T.S. No. 434P31-12-2027 00:00:00
MM VALLEY D1 D2ALFA ENTERPRISES55/131-12-2028 00:00:00
PEARL COMPLEXM/S Sai Developers33/1/A & 33/1/B31-12-2026 00:00:00
HARMONYBUILDMAN CONSTRUCTION225/831-12-2019 00:00:00
N G VALENCIA PHASE IIRNA Builders (NG)S No 335/3 Part Old 338/10 New30-09-2020 00:00:00
VANDANAMMETRO BUILDCONSurvey No 68Plot No 28 Hissa No 1P 3P 4P30-12-2021 00:00:00
ELANZA WING ASTONEWALL BUILDCON LLP(Old) Survey No. 462 Hissa No 4 And 7, (New) Survey No. 138 Hissa No 4 And 731-03-2027 00:00:00
ANANDI VRINDAVANShree Sai Malhar DevelopersSurvey No 28 Hissa No 330-06-2029 00:00:00
THE PALLAZOSHETRUNJAY REALTY LLP164 Hissa No.1131-05-2029 00:00:00
YASHODA VRUNDAVAN COMPLEX - C WINGVARDHMAN REALTYSurvey No. 71/8/A And 71/8/B31-07-2027 00:00:00
Mukund VIshnuShree Swami Samartha AssociatesTika No 12 Cst No 103A 2A 103A 2B Village Pachpakhadi30-12-2021 00:00:00
Anjani SparshGeeta Space Realtors249-2, 249-730-12-2020 00:00:00
Mohan Nano Estates IIIMOHAN LIFESPACES LLP24/1,24/2P,24/6P,24/8,24/9,25/1,25/231-12-2019 00:00:00
SHREE SHAMBHAV DARSHANSWASTIK ENTERPRISES2071 To 2075 Of Village Ghatkopar - Kirol30-12-2021 00:00:00
Reliable ResidencyReliable InfraventuresPLOT NO 72 SC S NO 12, 130-04-2024 00:00:00
Aadi AarambhNirman Construction129/1 A And 129/1B28-02-2018 00:00:00
Pushpa ParkVas Infrastructure Ltd.75715-08-2023 00:00:00
Silver SpringAnudan Properties Private LimitedF. P.4330-12-2022 00:00:00
Crystal HeightsNirala Construction424B, 425, 416B, 421/1 To 3, 421, 417/1 To 430-12-2021 00:00:00
Nirmaan HeightsChaitanya DevelopersCts 233A, 234B And Benefits Of Plots Under Set Back/Road Widening Bearing Cts 234C And 234D Borivali09-03-2022 00:00:00
AROMA HEIGHTSVASTU SAI BUILDERS AND DEVELOPERSSurvey No 5 (New) 94 (Old) Hissa No 231-12-2028 00:00:00
Regency OnyxREGENCY NIRMAN LTDSurvey No 52 Hissa No 13B30-06-2025 00:00:00
Dosti West County - Dosti Nest - Phase 3DOSTI ENTERPRISES21(Pt), 22B, 25/5B, 25/6(Pt), 25/7B(Pt), 25/8(Pt), 25/10/A/2(Pt)31-08-2027 00:00:00
Kamdhenu VogueM/S KAMDHENU LIFESPACES20 Plus 2131-03-2027 00:00:00
Sai Galaxy A- Wing and C- WingJash DevelopersS. No. 10 Hissa No. 231-12-2025 00:00:00
TANISHKA RESIDENCYANMOL DEVELOPERSSurvey No 61 Hissa No 2C/9A/10D/2B, Survey No 80 Hissa No 9A15-01-2023 00:00:00
KRISHNA GALAXYKRISHNA BUILDERS & DEVELOPERSSurvey No 42 Hissa No 230-06-2023 00:00:00
VILLA SMARANOM VILLA BUILDTECH LLPCts No 1194E And Cts No 1194A Sector 2930-03-2024 00:00:00
Virat MansionNeelyog DevelopersCts No 9907,9908 To 991330-12-2022 00:00:00
UNIQUE ELANZAUNIQUE STAR DEVELOPERS LLPS No 29 H No 4 And S No 30 H No 5 Village Ghodbunder25-03-2027 00:00:00
SINDHRI SAGARROUNAK SHYAM PANJWANIU No 75(P) Cts No 30783 9458 (P) Sheet No 49 R .No 163931-12-2024 00:00:00
SWARUP TOWERBABA REALTYSurvey No 124 Hissa No 1/B31-12-2024 00:00:00
SIDDHIVINAYAK GARDENSA1 BUILDCON991, 2, 3 And 1001830-12-2024 00:00:00
SHREE SHALINIJAY SERVICE AND CONSULTANTCts No 251 And 252A30-09-2023 00:00:00
M Square IT ParkPaper FlutingsA241 And A24230-03-2024 00:00:00
HEMANT SHISHIR CO.OP HSGNARENDRA KALYANJI PATEL3512-352131-12-2023 00:00:00
FORTUNE EMPORIOQUANTA REALTY LLPCts No 4090 To 4096,4166 To 4171,4240,4241 New Sno 37 Hno 3C31-12-2025 00:00:00
THE VALAJI ESTATEFORE HOLDINGS4065,4093-4097,4099-410205-07-2024 00:00:00
ASHWIN KIRTI CO-OP HSG SOCIETYVINAYAK ENTERPRISES DEVELOPERSS.No.17,H.No.3,Plot No.130-06-2024 00:00:00
GAURI GANPATI CO. OPERATIVE HOUSING SOCIETY LTDPATEL P N & COMPANY53/9C 30/9D10-11-2026 00:00:00
ROYAL ENCLAVEOM DEVELOPERS3/5 And 3/6 Narpoli Bhiwandi31-12-2026 00:00:00
Windsor Tower AGrandbuild Land Developers Llp7Bbooitkjphj1yavgdflzj9iry+Yibnrrnhzm0dji70cbapb00g0kviuip/Mpqdavho59qdeno6chd8q32me0xkkrrqbyru5k9jpajlb840o7yw+Uqxleoat6btocuuztdnwsmed5lqi8o9ziim7jjrbyluttuiczzmna5najcnmg9orb2px+Lczfabdzvkgkybh/6Hsm9xezuh2rt0umq==31-03-2032 00:00:00
Imperial Heights Phase Iii - E WingAkshar Shanti Realtors Private Limited62A/Iozzwi2z55y5/7Dejzfdp/Jo+Cumw9nonrm+9X8hfu2fpbjqcupnp0uv3w+Pmdykvvlkwux+2+Zzootspg==31-12-2030 00:00:00
Aai NiwasAai Mauli EnterprisesBmql3a93nih12cfxypr+//Uidryr72eydzdvnxk+Rjalw/D961efytnmn4vvfme431-03-2027 00:00:00
Belvedere-B and CLODHA DEVELOPERS LIMITED212/7A Part 212/7B Part 212/7C Part 212/7D Part 212/7E Part 25/2A(Part) 25/2B(Part) 25/4(Part)30-11-2027 00:00:00
SAI DREAM ONEGLS INFRASTRUCTURESS No.88, H No 6 & 731-12-2025 00:00:00
NEELKANTH PALM AVENUENEELKANTH INFRATECHPlot No-23 & 24, Sector-09 Ghansoli29-12-2029 00:00:00
SHREE GANESH SYMPHONYPAWAR GROUPS. No.172, H.No.1/801-12-2025 00:00:00
TRIMURTI GARDENSAI NARAYAN DEVELOPERSSurvey No 126 Hissa No 130-12-2025 00:00:00
Tulsi Aahan - B WingRAJ GROUPS No 39, H No 1,230-12-2022 00:00:00
ZENNEELKANTH REALTORS PVT LTD194/1B- Part -Under Reservation For Housing The Dishoused31-12-2026 00:00:00
Vedant Empire Phase III Wing C-ClifftonMOHAN HARDASMAL THARWANISurvey Nos.32/2/1/A,32/2/1/B30-06-2024 00:00:00
Jay Bharati CHS LTDSHIV DEVELOPERS1110/A Part 1168 1169 1170 1171 And 117331-12-2025 00:00:00
Shiv Aangan ResidencyDHANANJAY DEVELOPERSSurvey No 40 Hissa No 5/2 And 5/630-03-2025 00:00:00
NANA PATIL RESIDENCYQUALITY BUILDERS & DEVELOPERSPardi No 3, Hissa No 1, Hissa No 231-01-2021 00:00:00
SATYAM ORCHIDGIRIJA INFRASTRUCTUREPlot No 1030-12-2021 00:00:00
NEELKANTH PALM PRESIDENTNEELKANTH INFRATECHPlot No 10 Sectot 11 Ghansoli31-12-2029 00:00:00
Garden Estate Phase -IISHREE BALAJI DEVELOPERSSurvey No. 46, Hissa No. 12/131-03-2025 00:00:00
Parvati NiwasAADARSH DEVELOPERSCst No 27/1B, 27/1C Tikka No 2231-12-2025 00:00:00
Aai Mauli Park Building BHendar Laxman MhatreQtkg0s7ncpzseujnmt+Zccf5a3+Mqu1gyett7tnl1hm=31-12-2027 00:00:00
Windsor Tower CGrandbuild Land Developers Llp7Bbooitkjphj1yavgdflzj9iry+Yibnrrnhzm0dji70cbapb00g0kviuip/Mpqdavho59qdeno6chd8q32me0xkkrrqbyru5k9jpajlb840o7yw+Uqxleoat6btocuuztdnwsmed5lqi8o9ziim7jjrbyluttuiczzmna5najcnmg9orb2px+Lczfabdzvkgkybh/6Hsm9xezuh2rt0umq==31-03-2032 00:00:00
Saurabh SankulS K DevelopersLeja/Iebjeazvdasulvhxekmvr124jcd3h6i8dmfk9nszphr8qpxvv9wvcnyy4rbcyslhupk2d8eikiqeplstzsxdgddsv0qhc76zmalujo=31-12-2028 00:00:00
SIYARA AVENUESIYARA REALTY PRIVATE LIMITEDSurvey No. 11 & 1431-03-2029 00:00:00
MILAN HEIGHTSMILAN ASSOCIATESCts No. 10015/A & 1001619-04-2029 00:00:00
SHREE MARUTI HEIGHTSSUNITA ENTERPRISESCts No. 195/A/3A, 195/A/3B And 195/D31-03-2029 00:00:00
Metro RegaliaSHREE ASHTAVINAYAK ENTERPRISESS No 232, H No 3B/131-12-2027 00:00:00
Plot No -1A,Sector -19, Vashi Truck TerminalCITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITEDPlot No -1A31-12-2025 00:00:00
JP HARMONYJP CORP DEVELOPERS (INDIA) LLP12931-12-2023 00:00:00
Deep Royal ResidencyM/s. Deepali Infracon LLPSurvey No.80 Hissa No.231-12-2023 00:00:00
SHIVALAYA COMPLEX PH 2 WING BM/s Balaji group of companiesSurvey No 17 Hissa No 131-12-2022 00:00:00
AMINA BI INAMDAR TOWERROYAL INFRA61 To 6431-03-2024 00:00:00
Seva SmrutiNeelpadma AssociatesC.T.S.No 1150 To 115131-05-2024 00:00:00
ONE PYRAMIDPACIFIC PROPERTIESPlot No 2631-12-2026 00:00:00
AMAR PEARLAMARMAYA & ASSOCIATESCts No. 2328430-06-2024 00:00:00
PRIDE PARKNIKHIL RAJESH SUKHRAMANICts No 10429, 10430, 10431, 10401, 10432, 10438, 3097131-12-2025 00:00:00
BALAJI ANNEXM/S OM SWAYAMBHU SIDDHIVINAYAK BUILDERS AND DEVELOPERSSurvey No 93/3, 93/4, 93/530-12-2026 00:00:00
ARYA ARIANAASHAPURA CORPORATION5664/A30-03-2024 00:00:00
GAJANANGK BUILDCONB6330-06-2023 00:00:00
SAI LAKE ATULYAMMatoshree ConstructionOld 129/1/A Paiki-3 Plot No. 5, New 129/1/Sh/Plot No. 530-12-2025 00:00:00
IRIS MIRA ROAD EJEETENDRA ALIAS RAVI AMARNATH KAPOOR21/1, 24/230-12-2022 00:00:00
SAI ENCLAVEVIGHNAHARTA DEVELOPERSSurvey No 57 Hissa No 1 And 2 Part30-12-2023 00:00:00
ANANTAM HEIGHTSKANAK REALTYS.No.101, C.T.S No.328030-06-2024 00:00:00
CAPMATRIX SQUARECapmatrix Buildcon Private LimitedB-33, 33 Part15-12-2022 00:00:00
Lodha Panacea IILODHA DEVELOPERS LIMITED240/5A Pt30-09-2023 00:00:00
SHUBHAM RESIDENCYSHUBHAM REALTYPlot No 79,Sector 2130-06-2025 00:00:00
SHREE MAHALAXMI RESIDENCYSHREE GAJANAN BUILDERS AND DEVELOPERSS No 93 / H No A, S No 9431-07-2028 00:00:00
Thane ProjectLODHA DEVELOPERS LIMITED144/1 Part31-07-2029 00:00:00
Empire Industrial Centrum Phase-IIIEmpire Industries Limited22R30-03-2026 00:00:00
Empire Industrial Centrum Phase-IVEmpire Industries Limited2230-03-2025 00:00:00
SEASONS SAHARA BUILDING NO 2SAMARTH SAI BUILDERS & DEVELOPERSS No 24/2 At Village Adavli-Dhokli Taluka Ambernath And S No 34/10, 34/11, 34/12 At Village Pisavli Taluka Kalyan30-12-2024 00:00:00
OMKAR AVENUEOMKAR REALTORSCts No. 761 (Old Survey No.87/11 Plot No.11)31-03-2028 00:00:00
CENTURY TWOCITY INFRAPlot No 22,Sector-0931-03-2028 00:00:00
POKHRIYAL PARAMOUNTPOKHRIYAL AND ASSOCIATESSurvey No. 127, Plot No. D31-12-2028 00:00:00
Amruta ParkCheroba HomesS. No. 218, H. No. 2/Cpt & 3 & S. No. 21931-12-2026 00:00:00
Ram NiwasJitendra Gangji Dedhia21/B31-03-2025 00:00:00
FENKIN 9 PHASE IIFen-kin Buildpro LLPC-0631-12-2027 00:00:00
Vrundavan DhamShikhar LifespacesS.No 13, H No. 1 P31-12-2023 00:00:00
Riverwood Park Building No -3Shree Khidkaleshwar Property Developers Pvt. Ltd.26/2, 26/3 All In Parts30-06-2026 00:00:00
VISHWAJEET EMPIRE NXGULABRAO BABURAO KARANJULE PATILSurvey No 39 Hissa No 2A, Hissa No 2B, Hissa No 2C And Hissa No 2D23-06-2026 00:00:00
SADGURU NAKSHTRA PHASE ISADGURU DEVELOPERSSurvey No 1204A And Survey No 118330-12-2023 00:00:00
BANJARA HILLS SECTOR 7SEEMA DEVELOPERS127, 408/1, 407/230-12-2022 00:00:00
Lodha Panacea ILODHA DEVELOPERS LIMITED55Pt31-12-2021 00:00:00
RAJESHWARI RESIDENCY PHASE IISHREE SIDDHI CONSTRUCTIONSurvey No 30/2, 30/3/2/1, 30/3/2/230-03-2025 00:00:00
PINNACLE ROYALPINNACLE INFRAGut No41, Hissa No 20, Plot No 1530-03-2023 00:00:00
KOHINOOR AASHIYANAKGI REALTY PRIVATE LIMITED24/3 37/130-10-2024 00:00:00
KALYAN RAJASHREE COOPERATIVE HOUSING SOCIETY LTDSAI JAGAT BUILDCONOld Survey No 176/B And New Survey No 176/231-12-2028 00:00:00
CHAKRAPANI CO OP HSG SOCIETY LTDYADAV BROS CONSTRUCTIONS N 25 H No 3/4 Plot No 231-12-2025 00:00:00
SHREE SWAMI SAMARTH HEIGHTSPARVATI DEVELOPERS212, Tikka No. 331-03-2027 00:00:00
NANDIGRAMYOGENDRA MATADIN SHARMAC.T.S.No. 100 Tika No. 2231-05-2029 00:00:00
Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 1ADRIKA DEVELOPERS PRIVATE LIMITEDS. No. 156/1(Pt), 156/2(Pt), 157/1(Pt), 157/2(Pt), 159/1A(Pt), 159/1B(Pt), 159/1C(Pt)31-10-2028 00:00:00
NEELKANTH HEIGHTS CHSSHREE NEELKANTH DEVELOPERSSurvey No 14 Hissa No 1 & 6 Plot No 4, 3 & 631-03-2026 00:00:00
BUILDING No 1 PADMAVATIM/s. SAI BALAJI EMRALD REALTYOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2022 00:00:00
SWANAND TARANGM/S OMKAR REALTORSSurvey No 43 Hissa No 230-12-2021 00:00:00
Sd GalaxySomeshwarnath Developers & BuildersIic6914waa4wmvtozf/Jrnylamzqmv9ialrgjnwf9oteknhfwlgzjz8nsdxcedvd31-12-2027 00:00:00
Heramb ArcadeShivbaba DevelopersPlot No 4, Gut No 26/2931-10-2025 00:00:00
DIYA HOMESKIRTIKUMAR VANECHAND DOSHIPlot No-2631-12-2023 00:00:00
BUILDING NO 2 MAHALAKSHMI A WINGM/s. SAI BALAJI EMRALD REALTYOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
JHALAK LUXURIA PHASE IJHALAK CONSTRUCTIONSGut No 48 P Plot C, Cts No. 9353 P30-12-2021 00:00:00
Anantam - Phase IOyster Living LLP13/230-06-2022 00:00:00
BUILDING No 2 MAHALAKSHMI B WINGM/s. SAI BALAJI EMRALD REALTYOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
PLATINUM SQUARE B 1RADMIN DEVELOPERS & CONSULTANTS PRIVATE LIMITED21/2,21/3/1,22/1/2,1/3,1/5,1/6,1/830-05-2025 00:00:00
Aditya NishantPREMNARAYAN SHUKLA14229-01-2023 00:00:00
TEN X HABITAT Raymond Realty Tower JRaymond Limited126B 1/1 Part, 129/1 Part30-06-2025 00:00:00
RUSTOMJEE VERDANT VISTAS WING BKapstone Constructions Private LimitedResidential Sub Plot No 3, Survey Nos 35/3/2 (Pt), 35/7 (Pt), 35/8 (Pt)20-02-2030 00:00:00
RUSTOMJEE VERDANT VISTAS WING AKapstone Constructions Private LimitedResidential Sub Plot No 318-01-2030 00:00:00
SIYARA HEIGHTSSHAKTI REALTYSurvey No. 55, H.No. 3, Survey No. 4131-03-2029 00:00:00
PearlLodha Developers Limited29/1A/131-05-2027 00:00:00
DURVE ARINAEVERGREEN DEVELOPERSCts No 6096 To 6099 Village Dombivli City East31-12-2026 00:00:00
S.I. ARCADESALMAN IQBAL AHMED MOMINS.No. 45, Cts No. 437830-06-2028 00:00:00
ARUNODAY ANNEXMANGALYA SHELTER'S102131-03-2025 00:00:00
ARIHANT AAYAN PHASE IARIHANT SUPERSTRUCTURES LIMITEDSurvey No 116 4,120 9,147 2/C28-12-2030 00:00:00
YASHLATA PALACEPRADEEP SHYAM KHARBADESurvey No 81,82 , Plot No 1431-12-2024 00:00:00
AMRUTA CHSUTKARSHA CONSTRUCTION7462/70/2403-06-2022 00:00:00
SAI SHRUSHTI SAPPHIRESAI SHRUSHTI ENTERPRISES136/1 P Sub Plot D30-12-2021 00:00:00
Umiya OasisUmiya Developers29 Hissa No 1 Survey No 30 Hissa 1,2,3A30-12-2029 00:00:00
NANA PATIL ROYALM/S. J. R. Y. ENTERPRISESPardi No 3/1, 3/230-09-2022 00:00:00
Elite 2 ShopsLodha Developers Limited97 Pt 150/4 Pt31-07-2020 00:00:00
Elite 1 ShopLodha Developers Limited96/2 Pt, 97 Pt31-07-2020 00:00:00
FENKIN EMPIREFEN-KIN REALTORS & PROJECT PVT LTDCts No 313 And 314B31-07-2023 00:00:00
Sai PearlM/S MITRA REALITYS No 67 H No 331-12-2025 00:00:00
BARADIA EKDANTBARADIA REALTYCts No 259,26022-07-2026 00:00:00
SHREEJI INFINITYINFINITY INFRAPlot No 87 Sector 1131-12-2028 00:00:00
Sector 2A - Wing EEversmile Properties Private LimitedNew Sno 66,68,69 Of Village Penkarpada30-06-2028 00:00:00
DGT - Sector 3A - Cluster 2 - Phase 4ADRIKA DEVELOPERS PRIVATE LIMITED162(Pt)31-08-2028 00:00:00
LA RESIDENCYTRINITY CREATIVE HOMES LLPS.No.37/H.No,-11/B,S.No,-29 H.No,-1A30-06-2028 00:00:00
LA VITAKolte-Patil Nivasti Developers & Builders LLPPlot No 09 To 18 Sector 230-11-2028 00:00:00
REYAANSH ARCADEYASH DEVELOPERSSurvey No 49, Hissa No. 22/331-12-2029 00:00:00
RAM LAXMAN CO-OPERATIVE HOUSING SOCIETY LTD.BUILTTECH CONSTRUCTIONSS. No.20831-12-2028 00:00:00
Vedant Empire Phase II Wing B-HamptonMOHAN HARDASMAL THARWANISurvey Nos.32/2/1/A,32/2/1/B31-12-2027 00:00:00
EMERALDAPR REALTY88/14A & 88/1531-12-2026 00:00:00
HARI SHRUSHTISHRUSHTI CREATORSSurvey No 105A, Hissa No 4/131-12-2027 00:00:00
GULRAJ TRINITYM/S RELIABLE BUILDERS AND DEVELOPERSPlot No B/3 And B/4 Survey No 161 Cts No 1 A Pt30-06-2021 00:00:00
Sunteck Crest, Plot No.3, Mukund Nagar, Andheri Kurla Road, Andheri EastPoonam Co-operative Housing Society LimitedCts No. 189 B31-01-2022 00:00:00
MANORANJAN CHSADITYARAJ BUILDERS34730-12-2023 00:00:00
Regalia ShopsLodha Developers Limited96/2 Pt, 100/2 Pt31-07-2020 00:00:00
Urbano 2 ShopsLodha Developers Limited52 Pt ,And 144/9 Pt31-07-2020 00:00:00
NEW SHIV-SHAKTI CHSSHREE LAXMI DEVELOPERSPlot 83 S No 7030-03-2023 00:00:00
Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 2ADRIKA DEVELOPERS PRIVATE LIMITEDSurvey No.23/1B(Pt), 23/1C(Pt) Of Village Rahanal And Survey No.158(Pt)31-10-2028 00:00:00
Iflex SpacesRNV Developers Private LimitedNew S No 29/3 Old S No 24/331-12-2027 00:00:00
RAMDEV BASERARAMDEV BASERAOld Sno 225 New Sno 188 Hno 7, 9Pt, 10Pt31-12-2025 00:00:00
NAVKAR AVENUENAVKAR ENTERPRISESCts No 18 & 19/ T No 1031-12-2025 00:00:00
KRISHNA HIGHLANDS PHASE 1M/S ROHAN CONSTRUCTIONSurvey No 6 Hissa No 3B31-12-2025 00:00:00
OM TANISHQ RESIDENCYM/S LAXMI REALTYSurvey No 4, Hissa No 1A/230-03-2022 00:00:00
AMAKIN MOHAMMEDIYAH PHASE 3AMAKIN MOHAMMEDIYAH PRIVATE LIMITED31/6 And 730-12-2024 00:00:00
Anantam - Phase IIOyster Living LLP18/1230-06-2022 00:00:00
ROMELL VASANTHIROMELL REAL ESTATE PRIVATE LIMITED714/5 And 714/13/2 Part30-12-2024 00:00:00
GURUKRIPA CHSADITYARAJ ENTERPRISES348 Part30-12-2024 00:00:00
Sunteck BKC51SAHRISH CONSTRUCTIONS PRIVATE LIMITED115, 1151 To 1152030-06-2023 00:00:00
SHREESHA HEIGHTSVASTUNIRMAN DEVELOPERS111/A & 112/115-08-2028 00:00:00
RUSTOMJEE LA VIE WING CKapstone Constructions Private LimitedSub Plot 8A Survey No 328/3/B(Pt), 328/3/F(Pt), 329/2(Pt) Of Village Majiwade28-02-2029 00:00:00
ROCK MOUNT RESIDENCYBUILT CHARMS46/6/A 46/1/A/5 46/1/A/3/4/6 47/2/A30-06-2026 00:00:00
CHANDRABHAGA HEIGHTSJAI SANTOSHI MATA CONSTRUCTION BUILDERS AND DEVELOPERSS. No. 15731-07-2024 00:00:00
EKATVA SIGNETBhoomi DevelopersTikka No.15 Cts No.39/A/1/B Pt31-12-2023 00:00:00
RUSTOMJEE LA VIE WING BKapstone Constructions Private LimitedSub Plot No 8A Survey No 329/2(Pt) 329/3(Pt) Of Village Majiwade28-02-2029 00:00:00
SwapnpoortiSwapnpoorti Co-Operative Housing SocietyPlot No- 39+40, Sector-40, Nerul31-12-2025 00:00:00
Riverview Classic Building No 4, Phase IVRUTU BUILDERSS No 27, H No 5, 3/3 S No 28/ H. No 1,2,3,4/1,4/2,4/330-12-2022 00:00:00
OLIVIA PRIMESKYLINE BUILDPRO43/2B/3/230-06-2022 00:00:00
Jerry ApartmentRiel Infrastructure Pvt LtdJviutinzhjablecwtewrlg==20-12-2021 00:00:00
Clara ShopsLodha Developers Limited144 4 Pt 144 9 Pt31-07-2020 00:00:00
EMERALDAPR REALTY3/7A30-11-2024 00:00:00
HUBS INFRASTRUCTUREHUB'S INFRASTRUCTURE110/1/A/1/B/730-06-2024 00:00:00
Rai s AARAGYARAI RESIDENCY Private LimitedSurvey No 46 Hissa No 5 And 730-12-2026 00:00:00
RAI s VRUNDAVANRAI RESIDENCY Private LimitedSurvey No 64 Hissa No 230-12-2023 00:00:00
TAKSHILA RESIDENCYDELUX ASSOCIATESS No 157/13Pt S No 158/1Pt Plot No 1 And 230-12-2023 00:00:00
ARIHANT AARADHYA PHASE IIARIHANT SUPERSTRUCTURES LIMITED14/131-12-2030 00:00:00
GLOBAL PARADISEK2S BUILDCON485607-12-2024 00:00:00
CHIRAGDEEP ANNEXURBAN SQUARECts No 422915-01-2026 00:00:00
SHIVDAS ARCADEADI ENTERPRISESOld Survey No. 245 Hissa No. 1 And New Survey No. 9 Hissa No. 131-01-2023 00:00:00
WATSON APARTMENTSAI PRAKASH BUILDERS AND DEVELOPERSPlot No 292, Cts No 440731-10-2024 00:00:00
ARIHANT AARADHYA PHASE IARIHANT SUPERSTRUCTURES LIMITED1431-03-2029 00:00:00
EKADANTAAnaaya Buildcon Constructions LLPCts No 70 Plot No 53-5430-12-2022 00:00:00
RUNWAL R-SQUARERunwal Developers Pvt LtdNew Cts No 884A 884B 88C30-03-2023 00:00:00
Rose GardenVinayaka Realtors and Developers1102/1 To 1102/9, Cts No-110230-12-2023 00:00:00
ARENA SQUAREEMPIRE ARENA134/1, 134/2/A And 13630-06-2030 00:00:00
PARK ENCLAVENAYANTARA NXTCts No 6230 6231 And 6232 Mauje Ayre Dombivli East 42120130-06-2025 00:00:00
BELPATRAMAHADEV DEVELOPERSSurvey No 95 Hissa No 2 (Pt),Mauje Bapgaon,Bhiwandi31-05-2026 00:00:00
MANOVI PRITHVIMANOVI PRITHVIS. No. 217 H. No.3/H Plot No. 731-05-2024 00:00:00
SARVODAY SYMPHONYSWASTIK REALTORSSurvey No 91 Old 25New Hissa No 1 Survey 92 Old 3 New Hissa No 330-06-2026 00:00:00
PitrukrupaMellennium RealtyOld Survey No 326/A New Survey No 229/Part Plot No 33 Cts No 680 And68131-03-2023 00:00:00
Lakeside 1 ShopsLodha Developers Limited150/6 Pt 150/9 Pt 73/1 Pt 73/2 Pt31-07-2020 00:00:00
Lakeside 2 ShopsLodha Developers Limited69/1 Pt, 69/2 Pt,150/8 Pt31-07-2020 00:00:00
PRITAM SOLITAIREJAYESH PRAMODBHAI THAKKARSurvey No 44A Hissa No 1/1B Part30-12-2025 00:00:00
OM RAMCHANDRALAXMI DEVELOPERSGaothan Chalata No 109 House No 38030-11-2020 00:00:00
SAJAN SHANTARAM HEIGHTTIRUPATI DEVELOPERSNew Survey No.1 Hissa No 1130-06-2021 00:00:00
Ram JanakiShree Ganesh Enterprises4947 To 495230-12-2026 00:00:00
Quality VictoriaQuality Construction Developers5859D/141D30-12-2023 00:00:00
WishvasAAKAAR NIRMAAN PROPERTIES237 Part30-12-2025 00:00:00
KUBER PALACEKUBER NIRMAN LLP774/1 To 18, Cts No 77430-12-2024 00:00:00
Chandraprabha HeightsAdwait constructionsCts No . 11963 To 1196730-06-2022 00:00:00
SAI DARSHAN - FSHREE SAI ASSOCIATESGut No.112/A30-06-2022 00:00:00
Lodha iThink BLodha Developers Limited166 1Bpt28-02-2022 00:00:00
Upper Thane - Eden DLODHA DEVELOPERS LIMITED28/13 Part, 28/14 Part31-03-2028 00:00:00
Om Sai Imperial Tower IIS.K.Khambalkar Builders & Developers137/1 , 137/2, 137/331-03-2028 00:00:00
THE PYRAMID ONEPYRAMID DEVELOPERSSurvey No 95/2/A, 95/2/A/130-09-2026 00:00:00
Tulsi AagmanRAJ GROUPS No 36 H No-1,2,3 S No-37 H No-1 S No-40 H No-530-04-2025 00:00:00
Raheja Solaris-1Raheja Universal (Pvt.) Ltd.Gen-2/1/B30-12-2026 00:00:00
SHREE VIGHNESHWAR HEIGHTSMAHESH SHYAMSUNDAR GOYAL114/5/3/3,115/1,115/231-03-2027 00:00:00
KRISHNA HERITAGESHREE BALAJI CONSTRUCTIONSurvey No.30 Hissa No. 7-A31-12-2024 00:00:00
THE VAIDIKI SIGNATURE - B WINGSHREE JARI MARI DEVELOPERS LLPSurvey No 45 Hissa No 9 331-12-2026 00:00:00
SHIVDOOTI RESIDENCYARUN BALU PATILS No 64 H .No 5/A31-12-2025 00:00:00
APPLE PARADISEAPPLE PARADISEU No 99,100, Plot No 262 Part01-01-2019 00:00:00
Mavis Tower A wing From 5th floor to 7th FloorM/s. Unit Arsen Developers (Joint Venture)431C Part31-12-2019 00:00:00
INFINITE RESIDENCYMISTRY CONSTRUCTION CO. PVT. LTD.Pocket D And E30-06-2029 00:00:00
VISHAL SHILPSHRADDHA SKYLINE LLPCts 5662 Pt Fp No 311 Pt11-06-2021 00:00:00
OlympusVaibhavLaxmi Builders and Developers356 Pt30-12-2024 00:00:00
SARVESH ONESARVESH ENTERPRISES2/235, C.S.No.235, 1/23530-12-2024 00:00:00
Sheetal TapovanDgs Township Pvt Ltd818 823A 823B 823C 823 1 81801-06-2023 00:00:00
Veena Smart HomesV.D. Infratech Private Limited3/A/1 Part31-12-2024 00:00:00
VASANT OASIS COMMERCIAL RETAIL DAISY ANNEXENEEPA REAL ESTATES PRIVATE LIMITED345A/1 Part30-12-2023 00:00:00
KANAKIA ZENWORLD PHASE IIKANAKIA SPACES REALTY PRIVATE LIMITED1015, 1015/1 To 330-06-2026 00:00:00
S.K.Milan ResidencyS.K.Construction944, 944/1 To 530-03-2023 00:00:00
NALINI BHUVAN CHS LTDRADHEYA CONSTRUCTION COMPANYCts No.2250/A30-12-2024 00:00:00
MANSIPOOJA HEIGHTS K INFRASTRUCTURESurvey No 3 Hissa No 630-03-2023 00:00:00
SEASONS PARKSHREE BALAJI HOMESS No 49 H No 4/A, 4/B,6/D30-12-2022 00:00:00
Project Details
  • Project:
    Lodha Kandivali Project - Tower 2
  • Location:
  • 174C1
  • Const. Stage:
    New
  • Possession:
    31 Dec 2025
Developer Details

  • Developer:
    Lodha Developers Limited
  • Phone:
  • Address:
  • Vardhaman Chamber
Project RERA Details
MAHA REARA No: P51800031351
Project Type Residential / Group Housing
RERA Project Status New
Architect Vilas Desai & Associate
Funding Bank YES BANK
Proposed Possession 31 Dec 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 08 Nov 2024
Last Retrived 13 Feb 2026
Lodha Kandivali Project - Tower 2 QR Code
Lodha Kandivali Project - Tower 2
MahaRERA - P51800031351
Apartment Details & Configuration
TypeArea
3 BHK86.58 Sq.mts. ( 932 Sq.ft. )
3 BHK86.59 Sq.mts. ( 932 Sq.ft. )
3 BHK Large97.64 Sq.mts. ( 1051 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Lodha Kandivali Project - Tower 2last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space15% completed
15% Complete
Na
Closing Parking45% completed
45% Complete
Na
Community Buildings
Shared Across All Phases Of Real Estate Project
Electrical Meter Room, Sub-Station, Receiving Station80% completed
80% Complete
Na
Energy management
Na
Fire Protection And Fire Safety Requirements80% completed
80% Complete
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)40% completed
40% Complete
Na
Solid Waste Management And Disposal
Na
Storm Water Drains50% completed
50% Complete
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply70% completed
70% Complete
Na
Buildings / Wings in Lodha Kandivali Project - Tower 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Lodha Kandivali Project - Tower 2 by Lodha Developers Limitedlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

15808 Sq. ft.

Project Area

3458 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

149 apartments in total
Total
149
Booked
143
Available
6

Saleable Area Statistics (Sq. ft.)

147321 Total
Total
147321
Booked
141491
Available
5830
Total 149 apartments in project. 143 apartments booked. 95% apartments booked.
Total 147321 Sq.ft. saleable area. 141491 saleable area booked.
96% area booked.

Tower 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 2Dec 20253910000268
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK86.58 Sq.mts. ( 932 Sq.ft. )4
None Booked0% Booked
0% Booked
3 BHK86.59 Sq.mts. ( 932 Sq.ft. )74
74 Booked100% Booked
100% Booked
3 BHK Large97.64 Sq.mts. ( 1051 Sq.ft. )71
69 Booked97% Booked
97% Booked
149 total apartments / 143 apartments booked. 95% apartments booked.
Work Description in Building Tower 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress98% done
98% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress40% done
40% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
Lodha Developers Limited
for Project
Lodha Kandivali Project - Tower 2
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation