Project overview

Lodha Amara - Tower 26, 27, 28, 30, 34, 35 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700001031. Lodha Amara - Tower 26, 27, 28, 30, 34, 35 is located at 64/3,64/7,65/2,65/3,65/4,65/5, 68/3,68/4,68/5,69/2,69/6,70/1,70/2,70/3,70/4. This is a Ongoing being developed by Macrotech Developers Limited.

Lodha Amara - Tower 26, 27, 28, 30, 34, 35 has 1 BHK, 1 BHK C, 2 BHK Ultima, 2BHk Ultima & 3 BHK Jodi Apartments with carpet areas ranging from 366 to 882 Sq.ft. Carpet. The Project has total 959 of which 17 are currently available for sale.

Lodha Amara - Tower 26, 27, 28, 30, 34, 35 is being developed on a total land area of 94704 Sq.ft. out of which 66147 Sq.ft. i.e 70% is reserved for recreational purposes. Lodha Amara - Tower 26, 27, 28, 30, 34, 35 has 6 Wings / Towers Tower -26,Tower -27,Tower -28,Tower -30,Tower -34,Tower- 35

ProjectDeveloperLocationPossession
The EmpressUnique Shanti Developers LlpOld S.No.479/230-03-2023 00:00:00
Lotus ParkReal Enterprise842-A, Plot No. 02,0330-12-2022 00:00:00
Raviraj ApartmentRajendra GhorpadeS.No 85,H. No 11, Plot No 930-12-2022 00:00:00
Krupa SindhuAshish Waman GoleS No 48 H No 8/428-11-2021 00:00:00
Arvind GalaxySanchit EnterprisesTika No 16 Cts No 7830-12-2023 00:00:00
Shree Sai Pooja ApartmentOm Sai RealtyS No 29/A H No 19 Plot No 8730-09-2019 00:00:00
Mauli MadhusudhanRameshwar Patil42160530-03-2023 00:00:00
Salangpur NirmanSalangpur Nirman252 6,7 Part30-12-2022 00:00:00
M K Thakur Complex Phase 1Vraj Ratan Buildcon Pvt LtdSurvey No 77 1A 2 4 501-12-2021 00:00:00
Silver ArcadeSiddhivinayak Enterprises5831-12-2018 00:00:00
Orion Business ParkNeminath EnterprisesGut No 33 Pt31-03-2019 00:00:00
Payal PrideMit Enterprises10430-03-2022 00:00:00
Panvelkar Estate - GreenfordPanvelkar Infrastructures Private LimitedSurvey No. 42 Hissa No 2 And 330-12-2022 00:00:00
Plot 1 Sector 10 GhansoliCidco Of Maharashtra Ltd.Plot No 130-06-2021 00:00:00
Golden Hills B- 3Vihang Enterprises921,923,9241,9243,928130-12-2024 00:00:00
Classic ResidencyClassic ConstructionThane30-06-2021 00:00:00
Sarvodaya ClassicEkta BuildersSurvey No. 28 H.No 530-03-2026 00:00:00
Cosmos Horizon Phase IiConcorde Developers192/2A30-03-2024 00:00:00
Simone ResidencyM R M DevelopersDaighar Village30-12-2022 00:00:00
Delta WoodsDelta Venture1883Pt30-09-2023 00:00:00
Paramount BKalpataru Homes Private LimitedS.No. 114/8-Part,114/4-Part30-06-2025 00:00:00
Rental Building A-1 R2Sonam Spark Infra Private Limited30/11,14,15,21,22,24,29/1,23/2,22/1,2,330-09-2020 00:00:00
Shreeji LandmarkVinayak DevelopersSurvey No 46 Hissa No 5-130-12-2029 00:00:00
Hyde Park Residency F4 Building PhaseNexus Builders And Developers Pvt Ltd47/1/2, 47/1/3, 47/1/4, 47/1/5, 47/1/7, 47/1/9, 47/1/1030-12-2021 00:00:00
Bharat Ecovistas Phase IiBharat Realty Venture Private Limited67/2/P, 67/3A, Sub Plot B30-12-2023 00:00:00
Panvelkar Estate - Stanford - Phase 1Panvelkar Infrastructures Private LimitedGut No 42/131-12-2018 00:00:00
Jai MatadeeAaradhana Developers37531-03-2018 00:00:00
One Indiabulls Thane - 1Tapir Constructions Limited71/1/A/1/1, 71/229-08-2024 00:00:00
Lodha Amara - Tower 26, 27, 28, 30, 34, 35Macrotech Developers Limited64/3,64/7,65/2,65/3,65/4,65/5, 68/3,68/4,68/5,69/2,69/6,70/1,70/2,70/3,70/430-12-2021 00:00:00
Shivsai ParadiseBharat Agri Fert & Realty Realty Ltd112/2A,3,4,5/1,5/2,5/330-12-2028 00:00:00
RubaShreyas Enterprises112/5/430-09-2020 00:00:00
OrchidMehta RealtorsS No 378/131-03-2019 00:00:00
Project Details
  • Project:
    Lodha Amara - Tower 26, 27, 28, 30, 34, 35
  • Location:
  • 64/3,64/7,65/2,65/3,65/4,65/5, 68/3,68/4,68/5,69/2,69/6,70/1,70/2,70/3,70/4
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2021
Developer Details

  • Developer:
    Macrotech Developers Limited
  • Phone:
  • Address:
  • Vardhaman Chamber
Project RERA Details
MAHA REARA No: P51700001031
Project Type Residential / Group Housing
RERA Project Status Ongoing
Funding Bank UNION BANK OF INDIA
Proposed Possession 30 Dec 2021
Revised Possession 30 Dec 2021
Extended Possession
Litigations No Litigations
Last Modified 02 Jan 2019
Last Retrived 26 Jul 2025
Lodha Amara - Tower 26, 27, 28, 30, 34, 35 QR Code
Lodha Amara - Tower 26, 27, 28, 30, 34, 35
MahaRERA - P51700001031
Apartment Details & Configuration
TypeArea
2 BHK48.8 Sq.mts. ( 525 Sq.ft. )
2 BHK50.7 Sq.mts. ( 546 Sq.ft. )
2 BHK ultima57.8 Sq.mts. ( 622 Sq.ft. )
2 BHK Ultima62.4 Sq.mts. ( 672 Sq.ft. )
2 BHKSMALL41 Sq.mts. ( 441 Sq.ft. )
2 BHKUltima57.6 Sq.mts. ( 620 Sq.ft. )
3 BHK Ultima Jodi100.9 Sq.mts. ( 1086 Sq.ft. )
5 BHKJODI117.1 Sq.mts. ( 1260 Sq.ft. )
1 BHK D46.5 Sq.mts. ( 501 Sq.ft. )
2 BHKSMALL42.8 Sq.mts. ( 461 Sq.ft. )
5 BHKJODI116.7 Sq.mts. ( 1256 Sq.ft. )
2 BHK Optima48.83 Sq.mts. ( 526 Sq.ft. )
2 BHK Optima50.72 Sq.mts. ( 546 Sq.ft. )
2 BHK UItima57.83 Sq.mts. ( 622 Sq.ft. )
2 BHK Ultima62.45 Sq.mts. ( 672 Sq.ft. )
2 BHK Ultima57.65 Sq.mts. ( 621 Sq.ft. )
2 BHKSMALL45 Sq.mts. ( 484 Sq.ft. )
3 BHK Ultima Jodi100.86 Sq.mts. ( 1086 Sq.ft. )
5 BHK JODI116.72 Sq.mts. ( 1256 Sq.ft. )
5 BHKJODI117.09 Sq.mts. ( 1260 Sq.ft. )
2 BHKSMALL40.95 Sq.mts. ( 441 Sq.ft. )
1 BHK34.02 Sq.mts. ( 366 Sq.ft. )
1 BHK38.47 Sq.mts. ( 414 Sq.ft. )
1 BHK40.5 Sq.mts. ( 436 Sq.ft. )
1 BHK42.47 Sq.mts. ( 457 Sq.ft. )
1 BHK43.86 Sq.mts. ( 472 Sq.ft. )
2 BHK56.59 Sq.mts. ( 609 Sq.ft. )
2 BHK56.63 Sq.mts. ( 610 Sq.ft. )
3 BHK81.93 Sq.mts. ( 882 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Lodha Amara - Tower 26, 27, 28, 30, 34, 35last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space70% completed
70% Complete
Na
Closed Parkings40% completed
40% Complete
Na
Community Buildings95% completed
95% Complete
Shared Across Phases Of Real Estate Project
Electrical Meter Room, Sub-Station, Receiving Station90% completed
90% Complete
Na
Energy management90% completed
90% Complete
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Na
Landscaping & Tree Planting60% completed
60% Complete
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Na
Solid Waste Management And Disposal100% completed
95% Complete
Na
Storm Water Drains100% completed
95% Complete
Na
Street Lighting40% completed
40% Complete
Na
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Na
Water Conservation, Rain water Harvesting90% completed
90% Complete
Na
Water Supply95% completed
95% Complete
Na
Buildings / Wings in Lodha Amara - Tower 26, 27, 28, 30, 34, 35
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Lodha Amara - Tower 26, 27, 28, 30, 34, 35 by Macrotech Developers Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

94704 Sq. ft.

Project Area

66147 Sq. ft.

Recreational Open Space

Total 6

Wings / Towers in Project

Apartments Statistics

959 apartments in total
Total
959
Booked
942
Available
17

Saleable Area Statistics (Sq. ft.)

579182 Total
Total
579182
Booked
569912
Available
9270
Total 959 apartments in project. 942 apartments booked. 98% apartments booked.
Total 579182 Sq.ft. saleable area. 569912 saleable area booked.
98% area booked.

Tower -26

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower -26Dec 20203010000173
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK48.8 Sq.mts. ( 525 Sq.ft. )16
16 Booked100% Booked
100% Booked
2 BHK50.7 Sq.mts. ( 546 Sq.ft. )16
16 Booked100% Booked
100% Booked
2 BHK ultima57.8 Sq.mts. ( 622 Sq.ft. )56
56 Booked100% Booked
100% Booked
2 BHK Ultima62.4 Sq.mts. ( 672 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHKSMALL41 Sq.mts. ( 441 Sq.ft. )5
4 Booked80% Booked
80% Booked
2 BHKUltima57.6 Sq.mts. ( 620 Sq.ft. )58
58 Booked100% Booked
100% Booked
3 BHK Ultima Jodi100.9 Sq.mts. ( 1086 Sq.ft. )8
8 Booked100% Booked
100% Booked
5 BHKJODI117.1 Sq.mts. ( 1260 Sq.ft. )1
1 Booked100% Booked
100% Booked
164 total apartments / 163 apartments booked. 99% apartments booked.
Work Description in Building Tower -26Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower -27

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower -27Dec 20203010000170
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK D46.5 Sq.mts. ( 501 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK Optima48.8 Sq.mts. ( 525 Sq.ft. )16
16 Booked100% Booked
100% Booked
2 BHK Optima50.7 Sq.mts. ( 546 Sq.ft. )16
16 Booked100% Booked
100% Booked
2 BHK Ultima57.6 Sq.mts. ( 620 Sq.ft. )56
54 Booked96% Booked
96% Booked
2 BHK Ultima57.8 Sq.mts. ( 622 Sq.ft. )58
57 Booked98% Booked
98% Booked
2 BHK Ultima62.4 Sq.mts. ( 672 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHKSMALL42.8 Sq.mts. ( 461 Sq.ft. )5
4 Booked80% Booked
80% Booked
3 BHKULTIMAJODI100.9 Sq.mts. ( 1086 Sq.ft. )3
3 Booked100% Booked
100% Booked
4 BHK Jodi100.9 Sq.mts. ( 1086 Sq.ft. )5
5 Booked100% Booked
100% Booked
5 BHKJODI116.7 Sq.mts. ( 1256 Sq.ft. )1
1 Booked100% Booked
100% Booked
162 total apartments / 157 apartments booked. 96% apartments booked.
Work Description in Building Tower -27Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower -28

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower -28Dec 20203010000172
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK Optima48.83 Sq.mts. ( 526 Sq.ft. )17
17 Booked100% Booked
100% Booked
2 BHK Optima50.72 Sq.mts. ( 546 Sq.ft. )17
17 Booked100% Booked
100% Booked
2 BHK UItima57.83 Sq.mts. ( 622 Sq.ft. )54
54 Booked100% Booked
100% Booked
2 BHK Ultima62.45 Sq.mts. ( 672 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK Ultima57.65 Sq.mts. ( 621 Sq.ft. )54
54 Booked100% Booked
100% Booked
2 BHKSMALL45 Sq.mts. ( 484 Sq.ft. )5
2 Booked40% Booked
40% Booked
3 BHK Ultima Jodi100.86 Sq.mts. ( 1086 Sq.ft. )7
7 Booked100% Booked
100% Booked
5 BHK JODI116.72 Sq.mts. ( 1256 Sq.ft. )2
2 Booked100% Booked
100% Booked
5 BHKJODI117.09 Sq.mts. ( 1260 Sq.ft. )2
2 Booked100% Booked
100% Booked
161 total apartments / 158 apartments booked. 98% apartments booked.
Work Description in Building Tower -28Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower -30

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower -30Dec 20203010000171
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK Optima48.83 Sq.mts. ( 526 Sq.ft. )15
15 Booked100% Booked
100% Booked
2 BHK Optima50.72 Sq.mts. ( 546 Sq.ft. )15
15 Booked100% Booked
100% Booked
2 BHK Ultima57.65 Sq.mts. ( 621 Sq.ft. )58
58 Booked100% Booked
100% Booked
2 BHK Ultima57.83 Sq.mts. ( 622 Sq.ft. )58
58 Booked100% Booked
100% Booked
2 BHK Ultima62.45 Sq.mts. ( 672 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHKSMALL40.95 Sq.mts. ( 441 Sq.ft. )5
5 Booked100% Booked
100% Booked
3 BHK Ultima Jodi100.86 Sq.mts. ( 1086 Sq.ft. )9
9 Booked100% Booked
100% Booked
162 total apartments / 162 apartments booked. 100% apartments booked.
Work Description in Building Tower -30Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower -34

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower -34Dec 20203010000173
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.02 Sq.mts. ( 366 Sq.ft. )5
5 Booked100% Booked
100% Booked
1 BHK38.47 Sq.mts. ( 414 Sq.ft. )34
34 Booked100% Booked
100% Booked
1 BHK40.5 Sq.mts. ( 436 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK42.47 Sq.mts. ( 457 Sq.ft. )34
34 Booked100% Booked
100% Booked
1 BHK43.86 Sq.mts. ( 472 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK56.59 Sq.mts. ( 609 Sq.ft. )29
28 Booked96% Booked
96% Booked
2 BHK56.63 Sq.mts. ( 610 Sq.ft. )29
29 Booked100% Booked
100% Booked
2 BHK62.45 Sq.mts. ( 672 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK81.93 Sq.mts. ( 882 Sq.ft. )19
19 Booked100% Booked
100% Booked
154 total apartments / 152 apartments booked. 98% apartments booked.
Work Description in Building Tower -34Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower- 35

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower- 35Dec 20203010000172
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.47 Sq.mts. ( 414 Sq.ft. )37
36 Booked97% Booked
97% Booked
1 BHK42.47 Sq.mts. ( 457 Sq.ft. )37
36 Booked97% Booked
97% Booked
1 BHK43.86 Sq.mts. ( 472 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK C34.02 Sq.mts. ( 366 Sq.ft. )5
5 Booked100% Booked
100% Booked
2 BHK Ultima56.63 Sq.mts. ( 610 Sq.ft. )29
28 Booked96% Booked
96% Booked
2 BHK Ultima62.45 Sq.mts. ( 672 Sq.ft. )2
1 Booked50% Booked
50% Booked
2BHk Ultima56.59 Sq.mts. ( 609 Sq.ft. )29
29 Booked100% Booked
100% Booked
3 BHK Jodi81.93 Sq.mts. ( 882 Sq.ft. )16
15 Booked93% Booked
93% Booked
156 total apartments / 150 apartments booked. 96% apartments booked.
Work Description in Building Tower- 35Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Macrotech Developers Limited
for Project
Lodha Amara - Tower 26, 27, 28, 30, 34, 35
last updated on 26 Jul 2025 as per information obtained from MARA RERA.