Project overview

Lobpsons And Tania Industries is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000008005. Lobpsons And Tania Industries is located at Palghar, 401202. This is a On-Going Project being developed by Lobpsons &Amp; Tania Builders.

Lobpsons And Tania Industries has INDUSTIRAL SHOP & INDUSTRIAL SHOP Apartments with carpet areas ranging from 1178 to 1024 Sq.ft. Carpet. The Project has total 42 of which 18 are currently available for sale.

Lobpsons And Tania Industries is being developed on a total land area of 86543 Sq.ft. out of which 26910 Sq.ft. i.e 31% is reserved for recreational purposes. Lobpsons And Tania Industries has 1 Wings / Towers Lobpsons And Tania Industries

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Lobpsons And Tania Industries
  • Location:
  • Palghar, 401202
  • Const. Stage:
    On-Going Project
  • Possession:
    01 May 2018
Developer Details

  • Developer:
    Lobpsons &Amp; Tania Builders
  • Phone:
  • Address:
  • Survey No.61, Tania Horizon, Station Rd, Opp Dandavte Hospital, Nr Axis Bank, Nallasopara West, 401203
Project RERA Details
MAHA REARA No: P99000008005
Project Type Industrial
RERA Project Status On-Going Project
Funding Bank BASSEIN CATHOLIC CO-OPERATIVE BANK LTD
Proposed Possession 01 May 2018
Revised Possession 01 May 2018
Extended Possession 26 Jun 2025
Litigations No Litigations
Last Modified 26 Jul 2023
Last Retrived 28 Jul 2025
Lobpsons And Tania Industries QR Code
Lobpsons And Tania Industries
MahaRERA - P99000008005
Apartment Details & Configuration
TypeArea
INDUSTIRAL SHOP61.5 Sq.mts. ( 662 Sq.ft. )
INDUSTIRAL SHOP86.96 Sq.mts. ( 936 Sq.ft. )
INDUSTIRAL SHOP95.13 Sq.mts. ( 1024 Sq.ft. )
INDUSTIRAL SHOP116.13 Sq.mts. ( 1250 Sq.ft. )
INDUSTIRAL SHOP129.13 Sq.mts. ( 1390 Sq.ft. )
INDUSTIRAL SHOP176.05 Sq.mts. ( 1895 Sq.ft. )
INDUSTIRAL SHOP113.81 Sq.mts. ( 1225 Sq.ft. )
INDUSTIRAL SHOP170.38 Sq.mts. ( 1834 Sq.ft. )
INDUSTRIAL SHOP174.38 Sq.mts. ( 1877 Sq.ft. )
INDUSTRIAL SHOP114.27 Sq.mts. ( 1230 Sq.ft. )
INDUSTRIAL SHOP147.71 Sq.mts. ( 1590 Sq.ft. )
INDUSTRIAL SHOP164.44 Sq.mts. ( 1770 Sq.ft. )
INDUSTRIAL SHOP109.44 Sq.mts. ( 1178 Sq.ft. )
INDUSTRIAL SHOP61.87 Sq.mts. ( 666 Sq.ft. )
INDUSTRIAL SHOP78.41 Sq.mts. ( 844 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Lobpsons And Tania Industrieslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station30% completed
30% Complete
Na
Energy management20% completed
20% Complete
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking20% completed
20% Complete
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply100% completed
95% Complete
Na
Buildings / Wings in Lobpsons And Tania Industries
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Lobpsons And Tania Industries by Lobpsons &Amp; Tania Builderslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

86543 Sq. ft.

Project Area

26910 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

42 apartments in total
Total
42
Booked
24
Available
18

Saleable Area Statistics (Sq. ft.)

61079 Total
Total
61079
Booked
27634
Available
33445
Total 42 apartments in project. 24 apartments booked. 57% apartments booked.
Total 61079 Sq.ft. saleable area. 27634 saleable area booked.
45% area booked.

Lobpsons And Tania Industries

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Lobpsons And Tania IndustriesJul 202231000400
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
INDUSTIRAL SHOP61.5 Sq.mts. ( 662 Sq.ft. )3
3 Booked100% Booked
100% Booked
INDUSTIRAL SHOP86.96 Sq.mts. ( 936 Sq.ft. )1
1 Booked100% Booked
100% Booked
INDUSTIRAL SHOP95.13 Sq.mts. ( 1024 Sq.ft. )4
4 Booked100% Booked
100% Booked
INDUSTIRAL SHOP116.13 Sq.mts. ( 1250 Sq.ft. )2
2 Booked100% Booked
100% Booked
INDUSTIRAL SHOP129.13 Sq.mts. ( 1390 Sq.ft. )1
1 Booked100% Booked
100% Booked
INDUSTIRAL SHOP176.05 Sq.mts. ( 1895 Sq.ft. )17
None Booked0% Booked
0% Booked
INDUSTIRAL SHOP113.81 Sq.mts. ( 1225 Sq.ft. )1
1 Booked100% Booked
100% Booked
INDUSTIRAL SHOP170.38 Sq.mts. ( 1834 Sq.ft. )1
1 Booked100% Booked
100% Booked
INDUSTRIAL SHOP174.38 Sq.mts. ( 1877 Sq.ft. )1
1 Booked100% Booked
100% Booked
INDUSTRIAL SHOP114.27 Sq.mts. ( 1230 Sq.ft. )2
1 Booked50% Booked
50% Booked
INDUSTRIAL SHOP147.71 Sq.mts. ( 1590 Sq.ft. )3
3 Booked100% Booked
100% Booked
INDUSTRIAL SHOP164.44 Sq.mts. ( 1770 Sq.ft. )1
1 Booked100% Booked
100% Booked
INDUSTRIAL SHOP109.44 Sq.mts. ( 1178 Sq.ft. )1
1 Booked100% Booked
100% Booked
INDUSTRIAL SHOP61.87 Sq.mts. ( 666 Sq.ft. )3
3 Booked100% Booked
100% Booked
INDUSTRIAL SHOP78.41 Sq.mts. ( 844 Sq.ft. )1
1 Booked100% Booked
100% Booked
42 total apartments / 24 apartments booked. 57% apartments booked.
Work Description in Building Lobpsons And Tania IndustriesCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress40% done
40% Booked
Channel Partners
Channel Partners Registered by Developer
Lobpsons &Amp; Tania Builders
for Project
Lobpsons And Tania Industries
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation