Project overview

Linkbay Residences Phase I is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800047539. Linkbay Residences Phase I is located at 825/1 (P), 825/2 (P). This is a New being developed by Portsmouth Buildcon Private Limited.

Linkbay Residences Phase I has 2 BHK, 3 BHK, 4 BHK, Restaurant & Shop Apartments with carpet areas ranging from 1079 to 1060 Sq.ft. Carpet. The Project has total 591 of which 219 are currently available for sale.

Linkbay Residences Phase I is being developed on a total land area of 108340 Sq.ft. Linkbay Residences Phase I has 6 Wings / Towers Wing C,Wing D,Wing E,Wing F,Wing G,Wing H

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Linkbay Residences Phase I
  • Location:
  • 825/1 (P), 825/2 (P)
  • Const. Stage:
    New
  • Possession:
    31 Oct 2028
Developer Details

  • Developer:
    Portsmouth Buildcon Private Limited
  • Phone:
  • Address:
  • Hallmark Business Plaza
Project RERA Details
MAHA REARA No: P51800047539
Project Type Residential / Group Housing
RERA Project Status New
Funding Bank ICICI BANK LIMITED
Proposed Possession 31 Oct 2028
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 15 Oct 2024
Last Retrived 26 Jul 2025
Linkbay Residences Phase I QR Code
Linkbay Residences Phase I
MahaRERA - P51800047539
Apartment Details & Configuration
TypeArea
2 BHK72.63 Sq.mts. ( 782 Sq.ft. )
2 BHK98.49 Sq.mts. ( 1060 Sq.ft. )
3 BHK95.23 Sq.mts. ( 1025 Sq.ft. )
3 BHK129.54 Sq.mts. ( 1394 Sq.ft. )
4 BHK159.31 Sq.mts. ( 1715 Sq.ft. )
4 BHK119.99 Sq.mts. ( 1292 Sq.ft. )
Business Centre460.63 Sq.mts. ( 4958 Sq.ft. )
2 BHK159.35 Sq.mts. ( 1715 Sq.ft. )
2 BHK100.28 Sq.mts. ( 1079 Sq.ft. )
1 BHK53.08 Sq.mts. ( 571 Sq.ft. )
2 BHK74.62 Sq.mts. ( 803 Sq.ft. )
2 BHK80.75 Sq.mts. ( 869 Sq.ft. )
3 BHK96.93 Sq.mts. ( 1043 Sq.ft. )
Restaurant74.71 Sq.mts. ( 804 Sq.ft. )
Restaurant122.52 Sq.mts. ( 1319 Sq.ft. )
Shop195.01 Sq.mts. ( 2099 Sq.ft. )
Shop307.74 Sq.mts. ( 3313 Sq.ft. )
Shop73.25 Sq.mts. ( 788 Sq.ft. )
Shop73.26 Sq.mts. ( 789 Sq.ft. )
Shop34.41 Sq.mts. ( 370 Sq.ft. )
Shop65.02 Sq.mts. ( 700 Sq.ft. )
Shop65.12 Sq.mts. ( 701 Sq.ft. )
Shop65.46 Sq.mts. ( 705 Sq.ft. )
2 BHK73.58 Sq.mts. ( 792 Sq.ft. )
2 BHK75.41 Sq.mts. ( 812 Sq.ft. )
2 BHK97.76 Sq.mts. ( 1052 Sq.ft. )
4 BHK149.13 Sq.mts. ( 1605 Sq.ft. )
4 BHK159.28 Sq.mts. ( 1714 Sq.ft. )
Restaurant130.66 Sq.mts. ( 1406 Sq.ft. )
Restaurant65.86 Sq.mts. ( 709 Sq.ft. )
Shop65.78 Sq.mts. ( 708 Sq.ft. )
Shop304.47 Sq.mts. ( 3277 Sq.ft. )
Shop407.74 Sq.mts. ( 4389 Sq.ft. )
Shop111.82 Sq.mts. ( 1204 Sq.ft. )
Restaurant119.76 Sq.mts. ( 1289 Sq.ft. )
Shop73.48 Sq.mts. ( 791 Sq.ft. )
Shop73.49 Sq.mts. ( 791 Sq.ft. )
Shop34.63 Sq.mts. ( 373 Sq.ft. )
Shop65.79 Sq.mts. ( 708 Sq.ft. )
Shop130.49 Sq.mts. ( 1405 Sq.ft. )
Shop288.17 Sq.mts. ( 3102 Sq.ft. )
Shop328.82 Sq.mts. ( 3539 Sq.ft. )
Shop408.72 Sq.mts. ( 4399 Sq.ft. )
Shop442.83 Sq.mts. ( 4767 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Linkbay Residences Phase Ilast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
0
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
0
Energy management
0
Fire Protection And Fire Safety Requirements
0
Landscaping & Tree Planting
0
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
0
Solid Waste Management And Disposal
0
Storm Water Drains
0
Street Lighting
0
Treatment And Disposal Of Sewage And Sullage Water
0
Water Conservation, Rain water Harvesting
0
Water Supply
0
Buildings / Wings in Linkbay Residences Phase I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Linkbay Residences Phase I by Portsmouth Buildcon Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

108340 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 6

Wings / Towers in Project

Apartments Statistics

591 apartments in total
Total
591
Booked
372
Available
219

Saleable Area Statistics (Sq. ft.)

696334 Total
Total
696334
Booked
404114
Available
292220
Total 591 apartments in project. 372 apartments booked. 62% apartments booked.
Total 696334 Sq.ft. saleable area. 404114 saleable area booked.
58% area booked.

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing COct 20282514150176
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK72.63 Sq.mts. ( 782 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK98.49 Sq.mts. ( 1060 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK95.23 Sq.mts. ( 1025 Sq.ft. )39
26 Booked66% Booked
66% Booked
3 BHK129.54 Sq.mts. ( 1394 Sq.ft. )39
22 Booked56% Booked
56% Booked
4 BHK159.31 Sq.mts. ( 1715 Sq.ft. )2
2 Booked100% Booked
100% Booked
4 BHK119.99 Sq.mts. ( 1292 Sq.ft. )4
1 Booked25% Booked
25% Booked
Business Centre460.63 Sq.mts. ( 4958 Sq.ft. )1
None Booked0% Booked
0% Booked
87 total apartments / 51 apartments booked. 58% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
work-in-progress83% done
83% Booked
Excavation
work-in-progress98% done
98% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
work-in-progress83% done
83% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing DOct 20282514150177
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK72.63 Sq.mts. ( 782 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK95.23 Sq.mts. ( 1025 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK159.35 Sq.mts. ( 1715 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK98.49 Sq.mts. ( 1060 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK100.28 Sq.mts. ( 1079 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK129.54 Sq.mts. ( 1394 Sq.ft. )40
25 Booked62% Booked
62% Booked
3 BHK95.23 Sq.mts. ( 1025 Sq.ft. )40
38 Booked95% Booked
95% Booked
4 BHK159.35 Sq.mts. ( 1715 Sq.ft. )2
2 Booked100% Booked
100% Booked
4 BHK119.99 Sq.mts. ( 1292 Sq.ft. )2
2 Booked100% Booked
100% Booked
90 total apartments / 68 apartments booked. 75% apartments booked.
Work Description in Building Wing DCompletion
Basement (if any)
work-in-progress83% done
83% Booked
Excavation
work-in-progress98% done
98% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
work-in-progress83% done
83% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing EOct 20282514150178
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK53.08 Sq.mts. ( 571 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK74.62 Sq.mts. ( 803 Sq.ft. )40
27 Booked67% Booked
67% Booked
2 BHK80.75 Sq.mts. ( 869 Sq.ft. )44
44 Booked100% Booked
100% Booked
3 BHK96.93 Sq.mts. ( 1043 Sq.ft. )46
41 Booked89% Booked
89% Booked
Restaurant74.71 Sq.mts. ( 804 Sq.ft. )1
None Booked0% Booked
0% Booked
132 total apartments / 113 apartments booked. 85% apartments booked.
Work Description in Building Wing ECompletion
Basement (if any)
work-in-progress83% done
83% Booked
Excavation
work-in-progress98% done
98% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
work-in-progress83% done
83% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing FOct 20282514150173
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK72.63 Sq.mts. ( 782 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK98.49 Sq.mts. ( 1060 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK100.28 Sq.mts. ( 1079 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK95.23 Sq.mts. ( 1025 Sq.ft. )38
33 Booked86% Booked
86% Booked
3 BHK129.54 Sq.mts. ( 1394 Sq.ft. )37
19 Booked51% Booked
51% Booked
4 BHK159.35 Sq.mts. ( 1715 Sq.ft. )4
3 Booked75% Booked
75% Booked
4 BHK119.99 Sq.mts. ( 1292 Sq.ft. )2
2 Booked100% Booked
100% Booked
Restaurant122.52 Sq.mts. ( 1319 Sq.ft. )1
None Booked0% Booked
0% Booked
Restaurant74.71 Sq.mts. ( 804 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop195.01 Sq.mts. ( 2099 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop307.74 Sq.mts. ( 3313 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop73.25 Sq.mts. ( 788 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop73.26 Sq.mts. ( 789 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop34.41 Sq.mts. ( 370 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop65.02 Sq.mts. ( 700 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop65.12 Sq.mts. ( 701 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop65.46 Sq.mts. ( 705 Sq.ft. )1
None Booked0% Booked
0% Booked
96 total apartments / 59 apartments booked. 61% apartments booked.
Work Description in Building Wing FCompletion
Basement (if any)
work-in-progress83% done
83% Booked
Excavation
work-in-progress98% done
98% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
work-in-progress83% done
83% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing G

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing GOct 20282514150173
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK73.58 Sq.mts. ( 792 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK75.41 Sq.mts. ( 812 Sq.ft. )36
36 Booked100% Booked
100% Booked
2 BHK97.76 Sq.mts. ( 1052 Sq.ft. )2
1 Booked50% Booked
50% Booked
4 BHK149.13 Sq.mts. ( 1605 Sq.ft. )36
15 Booked41% Booked
41% Booked
4 BHK159.28 Sq.mts. ( 1714 Sq.ft. )4
3 Booked75% Booked
75% Booked
4 BHK119.99 Sq.mts. ( 1292 Sq.ft. )4
4 Booked100% Booked
100% Booked
Restaurant130.66 Sq.mts. ( 1406 Sq.ft. )1
None Booked0% Booked
0% Booked
Restaurant65.86 Sq.mts. ( 709 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop65.78 Sq.mts. ( 708 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop304.47 Sq.mts. ( 3277 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop407.74 Sq.mts. ( 4389 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop111.82 Sq.mts. ( 1204 Sq.ft. )1
None Booked0% Booked
0% Booked
90 total apartments / 61 apartments booked. 67% apartments booked.
Work Description in Building Wing GCompletion
Basement (if any)
work-in-progress83% done
83% Booked
Excavation
work-in-progress98% done
98% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
work-in-progress83% done
83% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing H

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing HOct 20282514150173
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK72.63 Sq.mts. ( 782 Sq.ft. )2
1 Booked50% Booked
50% Booked
2 BHK98.49 Sq.mts. ( 1060 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK100.28 Sq.mts. ( 1079 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK95.23 Sq.mts. ( 1025 Sq.ft. )38
14 Booked36% Booked
36% Booked
3 BHK129.54 Sq.mts. ( 1394 Sq.ft. )37
4 BHK119.99 Sq.mts. ( 1292 Sq.ft. )2
None Booked0% Booked
0% Booked
4 BHK159.35 Sq.mts. ( 1715 Sq.ft. )4
1 Booked25% Booked
25% Booked
Restaurant119.76 Sq.mts. ( 1289 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop73.48 Sq.mts. ( 791 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop73.49 Sq.mts. ( 791 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop34.63 Sq.mts. ( 373 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop65.79 Sq.mts. ( 708 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop130.49 Sq.mts. ( 1405 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop288.17 Sq.mts. ( 3102 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop328.82 Sq.mts. ( 3539 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop408.72 Sq.mts. ( 4399 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop442.83 Sq.mts. ( 4767 Sq.ft. )1
None Booked0% Booked
0% Booked
96 total apartments / 20 apartments booked. 20% apartments booked.
Work Description in Building Wing HCompletion
Basement (if any)
work-in-progress83% done
83% Booked
Excavation
work-in-progress98% done
98% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
work-in-progress83% done
83% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Portsmouth Buildcon Private Limited
for Project
Linkbay Residences Phase I
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation