Project overview

Lifescapes Shubham is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900002696. Lifescapes Shubham is located at 585, 588, 589. This is a Ongoing being developed by Rohan Developers Private Limited.

Lifescapes Shubham has 2 BHK & 3 BHK Apartments with carpet areas ranging from 1141 to 934 Sq.ft. Carpet. The Project has total 154 of which 18 are currently available for sale.

Lifescapes Shubham is being developed on a total land area of 56754 Sq.ft. out of which 4516 Sq.ft. i.e 8% is reserved for recreational purposes. Lifescapes Shubham has 3 Wings / Towers Lifescapes Amrut,Lifescapes Amrut Annex,Lifescapes Shubham

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Lifescapes Shubham
  • Location:
  • 585, 588, 589
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2023
Developer Details

  • Developer:
    Rohan Developers Private Limited
  • Phone:
  • Address:
  • The Ruby
Project RERA Details
MAHA REARA No: P51900002696
Project Type Residential / Group Housing
RERA Project Status Ongoing
Funding Bank HDFC BANK
Proposed Possession 30 Jun 2023
Revised Possession 30 Jun 2023
Extended Possession 31 Dec 2024
Litigations No Litigations
Last Modified 03 Feb 2025
Last Retrived 26 Jul 2025
Lifescapes Shubham QR Code
Lifescapes Shubham
MahaRERA - P51900002696
Apartment Details & Configuration
TypeArea
Nil0 Sq.mts. ( 0 Sq.ft. )
2 BHK78.32 Sq.mts. ( 843 Sq.ft. )
2 BHK80.33 Sq.mts. ( 865 Sq.ft. )
2 BHK80.54 Sq.mts. ( 867 Sq.ft. )
2 BHK81.15 Sq.mts. ( 873 Sq.ft. )
2 BHK86.62 Sq.mts. ( 932 Sq.ft. )
2 BHK86.75 Sq.mts. ( 934 Sq.ft. )
3 BHK105.96 Sq.mts. ( 1141 Sq.ft. )
3 BHK106.26 Sq.mts. ( 1144 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Lifescapes Shubhamlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting50% completed
50% Complete
80 % Bldg No. 1
Water Supply
Na
Buildings / Wings in Lifescapes Shubham
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Lifescapes Shubham by Rohan Developers Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

56754 Sq. ft.

Project Area

4516 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

154 apartments in total
Total
154
Booked
136
Available
18

Saleable Area Statistics (Sq. ft.)

148449 Total
Total
148449
Booked
131926
Available
16522
Total 154 apartments in project. 136 apartments booked. 88% apartments booked.
Total 148449 Sq.ft. saleable area. 131926 saleable area booked.
89% area booked.

Lifescapes Amrut

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Lifescapes AmrutNov 2022231110025
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Nil0 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Lifescapes AmrutCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Lifescapes Amrut Annex

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Lifescapes Amrut AnnexJan 19001100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Nil0 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Lifescapes Amrut AnnexCompletion
Basement (if any)
work-in-progress80% done
80% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress80% done
80% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
work-in-progress80% done
80% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress30% done
30% Booked
X number of Podiums
X number of Slabs of Super Structure

Lifescapes Shubham

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Lifescapes ShubhamJun 20222911150302
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK78.32 Sq.mts. ( 843 Sq.ft. )23
20 Booked86% Booked
86% Booked
2 BHK80.33 Sq.mts. ( 865 Sq.ft. )23
21 Booked91% Booked
91% Booked
2 BHK80.54 Sq.mts. ( 867 Sq.ft. )23
20 Booked86% Booked
86% Booked
2 BHK81.15 Sq.mts. ( 873 Sq.ft. )23
18 Booked78% Booked
78% Booked
2 BHK86.62 Sq.mts. ( 932 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK86.75 Sq.mts. ( 934 Sq.ft. )4
2 Booked50% Booked
50% Booked
3 BHK105.96 Sq.mts. ( 1141 Sq.ft. )27
26 Booked96% Booked
96% Booked
3 BHK106.26 Sq.mts. ( 1144 Sq.ft. )27
25 Booked92% Booked
92% Booked
154 total apartments / 136 apartments booked. 88% apartments booked.
Work Description in Building Lifescapes ShubhamCompletion
Basement (if any)
work-in-progress84% done
84% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress60% done
60% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress70% done
70% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress30% done
30% Booked
Plinth
work-in-progress84% done
84% Booked
Podiums (if any)
work-in-progress84% done
84% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress20% done
20% Booked
Slabs of Super Structure
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress85% done
85% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress85% done
85% Booked
Stilt Floor
work-in-progress85% done
85% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress84% done
84% Booked
X number of Podiums
work-in-progress84% done
84% Booked
X number of Slabs of Super Structure
work-in-progress85% done
85% Booked
Channel Partners
Channel Partners Registered by Developer
Rohan Developers Private Limited
for Project
Lifescapes Shubham
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation