Project overview

Liberty Industrial Park is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000049572. Liberty Industrial Park is located at 132/A 132/B 224/2. This is a New being developed by Gurunanak Developers.

Liberty Industrial Park has INDUSTRIAL Apartments with carpet areas ranging from 11790 to 11790 Sq.ft. Carpet. The Project has total 12 of which 12 are currently available for sale.

Liberty Industrial Park is being developed on a total land area of 177626 Sq.ft. out of which 7583 Sq.ft. i.e 4% is reserved for recreational purposes. Liberty Industrial Park has 12 Wings / Towers Plot No 02-Unit No 01,Plot No 03-Unit No 02,Plot No 04-Unit No 03,Plot No 05-Unit No-04,Plot No 06-Unit No 05,Plot No 07-Unit No 06,Plot No 08-Unit No 07,Plot No 09-Unit 08,Plot No 10-Unit No 09,Plot No 11-Unit No 10,Plot No 12- Unit No 11,Plot No 13-Unit No 12

ProjectDeveloperLocationPossession
Indraprasth ComplexSwastik DevelopersPlot No 18,19,20,21,2231-01-2019 00:00:00
Tulip ResidencyBrright Realtors11/1P/0331-03-2018 00:00:00
Sneh Kunj ApartmentS.K.DevelopersS.No. 114/6Bpt31-12-2017 00:00:00
Golden HeightsGolden Group And DevelopersPalghar, 40140431-12-2019 00:00:00
Cello Decent Homes Phase 2Decent Homes14,15/1/1 A Paiki 31-07-2019 00:00:00
C Vinayak Industrial EstateVinayak ConstructionCn No/Cts No-130Pt Survey No/Plot No 1 And 231-12-2018 00:00:00
ClassiqueShrushti DevelopersPlot No 3 And 430-12-2022 00:00:00
Riddhivinayak ApartmentJai Bajarang ConstructionGut No-27/2/A, Plot No-2430-11-2019 00:00:00
Malhar LifespacesMalhar Lifespaces224/828-11-2021 00:00:00
Kusum ParkSunshine BuildersPlot No 141 Survey No 82630-12-2021 00:00:00
Prithvi SrishtiPrithvi Anand RealtySurvey No 74/1Pt30-06-2018 00:00:00
Giriraj DarshanKishore S. DubeCts No 370,37125-03-2019 00:00:00
S S Dream CitySanjay Yadav401404, Palghar31-07-2022 00:00:00
Raj IconNeelshrushti Builders & DevelopersSurvey No-99/A/202-09-2019 00:00:00
Rudra SaiRudra Sai AppartmentGut No-222 Pt31-12-2018 00:00:00
Vasant VillaVasant Construction99/1 Pt.30-09-2020 00:00:00
Nirman HeightNirman Builder & DeveloperSurvey No-91/2/A, Plot No-2830-09-2022 00:00:00
Fia OrionNimish Laxmichand PasadSurvey No 79/2 156/2 Plot No 430-12-2021 00:00:00
Bhoomi NiwasBhoomi CorparationSurvey No 36,37/130-06-2019 00:00:00
Shri Balaji NiwasBhoomi EnterprisesSurvey No.37,Hissa No.6,Plot No.231-12-2019 00:00:00
Fia ParadiseNimish Laxmichand PasadSurvey No 125 Plot No 5, Old Plot No 1330-12-2022 00:00:00
Arihant Arshiya Phase IiiArihant Superstructures LimitedSurvey No. 20/1, 20/2 Plus 3, 21/1, 21/2A, 21/2B, 22/1, 22/2, 22/3, 22/430-09-2020 00:00:00
Kanchan ImperialNovel Buildcon84/1/3/A30-06-2023 00:00:00
Shree Gajanand Apartment Building No 5 Type B1Shree Gajanand RealtyPalghar28-02-2025 00:00:00
Shree Balaji HeavenShree Balaji HomesChiller Road31-03-2026 00:00:00
Navkar HeightsNavkar HeightsS.No.19/4A (Cts No.489 Part)31-12-2024 00:00:00
Siddharth Avenue C WingHum Developers Private Limited20030-03-2022 00:00:00
OmkaraAnh NirmanPlot No 12 13 And 14 Survey No 828 3P30-12-2020 00:00:00
Shiv DarshanM/S. Prathmesh Builders & DevelopersSurvey No. 23/1/A Plot No. 1001-04-2022 00:00:00
Poonam Park View Phase IiPoonam Homemaker LlpS No. 5, 5B30-06-2021 00:00:00
Cello Decent Homes Phase 3Decent Homes14,15/1/1A Paiki, 15 B Plot No 330-12-2022 00:00:00
Kotak RoyaleKotak Sons94/1 125/101-12-2020 00:00:00
Maple Terraces Building No. B-11Messrs. Axis Dwellings LlpSurvey No. 12/131-03-2018 00:00:00
Shanti VistaShah Realty And Infra52 And 54 Of Village Khaira31-07-2018 00:00:00
Rajyog ElanzaaRajyog InfraPlot 3 And 1631-12-2018 00:00:00
Dandekars GandhakoshJayant Vishnu Dandekar101 4 A 101 D30-09-2025 00:00:00
Shree Siddhivinayak ResidencyR S Enterprises60/130-06-2025 00:00:00
Lake ViewRishabh EnterprisesSurvey No. 17/2, 17/531-12-2025 00:00:00
Oakwood Phase-2Jeevdani Builders & Developers LlpPlot No 146, 147 Of Sector 7 Of Sri Prastha Layour31-05-2025 00:00:00
Oakwood Phase-1Jeevdani Builders & Developers LlpPlot No 146, 147 Of Sector-Vii Of Sri Prastha Layout31-05-2022 00:00:00
Fia Construction Company A/C Fia EnigmaNimish Laxmichand PasadPlot No 62,S.No.82631-12-2024 00:00:00
Shree Balaji AvenuePrabha Realty40150130-06-2024 00:00:00
Krish MansionKbafna Infraa Private Limited1032324-12-2024 00:00:00
Roman ResidencyShantee HousingS No 68 H No 131-12-2027 00:00:00
Fia Regency ANimish Laxmichand PasadSurvey No 923 Plot No 330-12-2022 00:00:00
DattagangaGanesh Land Developers And Construction Private LimitedS N83/4 P Plot No115-02-2021 00:00:00
Anant AakashPravinkumar Lalchand JainSurvey No 2/530-10-2020 00:00:00
Parvati HomesKrishna Builder &Amp; DevelopersPalghar, 40140431-12-2025 00:00:00
Empire Estate 1Javed Yasin Kojar24 1 1 And 24 1 231-12-2023 00:00:00
Guruji ResidencyNavkar DevelopersPlot No 17 Survey No 71/5/70/331-12-2023 00:00:00
Beginning HeightsAnand Mohan Dubey155231-12-2029 00:00:00
Amin ComplexGajarya AssociatesS No 169 Pt Gut No 39/2 Plot No 231-03-2022 00:00:00
Symphony HeightsKreate Space LlpSurvey No-155 Pt. Cts No-87831-03-2025 00:00:00
Parmar Jewel ResidencyParmarbuildtech20 H No 4,21 Hno 1/2A, 1/2B, 1/2C 1/2D31-07-2020 00:00:00
Riddhi Siddhi ParkRiddhi Siddhi BuildersGut No-212 Plot No. 3 To 1431-03-2019 00:00:00
Aadinath Complex Bldg No 1 And 2Chamunda DevelopersCts No 19031-12-2018 00:00:00
Paramount Enclave Phase -1Kavita Realty Housing Llp1023/9 And 1023/9/130-11-2024 00:00:00
Gopikisan Patil Complex Bldg No 1Sumatinath EnterprisesNaigaon Station Road, Palghar31-12-2027 00:00:00
Shree Ganesh HeritageHimanshu Sham Tendulkar831 A31-10-2024 00:00:00
Rameshwar ArcadeLevel Up Realtors70/1/131-12-2024 00:00:00
Arihant ResidencyAditya Deepak Karnawat63/6, 63/8, 63/2930-04-2024 00:00:00
Keshav SrushtiSrushti Realtors377/0130-12-2022 00:00:00
Dandekar ResidencyJayant Vishnu Dandekar101/4/A Or 101/4 Pt And 101/D30-03-2022 00:00:00
Ostwal WoodsShree Ostwal Builders LtdSurvey No 148/B/1/130-12-2024 00:00:00
Fia Construction Company Fia Orion - GrandeNimish Laxmichand PasadPlot No 1731-12-2025 00:00:00
Jb EnterprisesRaju Bherulal JainS No 38/1/331-12-2025 00:00:00
Sanyukta RealtorsKhatushyam RealtyS. No. 15A, H. No. 231-10-2028 00:00:00
Shree Kurlai ComplexShree Mangalmurti AssociatesNear Kurlai Temple30-06-2025 00:00:00
Samaira ResidencyAv Crystal SpaceSurvey No 7531-12-2026 00:00:00
Kt Aspire Industrial HubKt 3D ScapesS.No 95B H.No 1,31-03-2023 00:00:00
Vakratund HeightsShivanjali InfrastructureSr. No. 77/3/230-12-2022 00:00:00
Decent Life Space 1Adinath Associates70/A/1, 51/A/530-12-2023 00:00:00
Fia EkdantaMystique DevelopersPlot No 7, S No 143 3 Part 343 B1, 343 B230-12-2023 00:00:00
Riddhi Siddhi GreensRiddhi Siddhi RealtorsSurvey No 134, Plot No 131-12-2018 00:00:00
Ocean PearlOcean Developers162/1/1Pt31-12-2018 00:00:00
Spring FieldM/S. Shyam Sagar DevelopersGut No 70, Plot No 1 To 1130-12-2023 00:00:00
YashapartmentkwingBhavesh Shantilal Parekh82/601-12-2019 00:00:00
Sai Bhakti ComplexSai Bhakti DevelopersS No 1023 H No 1 And 2/1930-12-2023 00:00:00
RudranshPadmavati Developers401404, Palghar31-12-2017 00:00:00
Wonder Residency C Wing Building No 2New Galaxy EnterprisesSn 256 Hn3,830-03-2022 00:00:00
Crescentpoint-IiK K Construction106/1/1 , 106/7, 107/231-12-2022 00:00:00
Ostwal Empire M1 And M2Samta EnterprisesBoisar, Opp. Gurudwara30-12-2024 00:00:00
Yashwant CountyVimal Infra235/4 And 235/11/131-12-2025 00:00:00
Dream AuraClement Regency Developers48/15+1330-12-2025 00:00:00
Ostwal PalaceShree Ostwal Builders LtdSurvey No.67 Hissa No.7331-03-2027 00:00:00
Astavinayak ApartmentM/S Raj Riddhi AssociatesS N 27 H N 2 Plot No 531-05-2018 00:00:00
Om SaiMayfair Enterprises62/228-07-2019 00:00:00
Shri Sai DarshanOm Sai Builders And Develoeprs27/1/A30-12-2021 00:00:00
Nilemore Ganesh Co-Op Hsg Soc LtdShree Builders And Land DevelopersS No 125 &Amp; 128 Plot No 21 Behind Shani Mandir Laxmi Ben Chedha Marg, Palghar31-12-2027 00:00:00
Gulmohar AvenueHimanshu Sham TendulkarCts No 77430-04-2025 00:00:00
Sachin ApartmentSachin Civil Contractor79/2, 79/106-11-2019 00:00:00
Godai ApartmentBalwant Atmaram PatilPlot No. 12, S. No. 50/330-03-2023 00:00:00
Samruddhi ApartmentNitant Satish PatilS. No. 2312 Pt. Plot No. 6430-03-2023 00:00:00
Maple Terraces Building No. A-15Messrs. Axis Dwellings LlpSurvey No 12/131-03-2018 00:00:00
I.K. GroupI K Group7/E20-12-2018 00:00:00
Apex WildernestApex CreatorsSurvey No. 28, 29, 30.31-03-2018 00:00:00
Seven HeightsAditi Builders And Developers40150131-12-2025 00:00:00
Sukh Shanti ApartmentSaimirra RealtyS. No. 20931-12-2024 00:00:00
Hayaat ReliableM M Lifestyle15531-12-2028 00:00:00
Nemi SolitaireNemi Realtors826 Plot No.430-03-2023 00:00:00
Shraddha MansionSaroj Kirtikumar Bafna216/19/A30-06-2022 00:00:00
Nisarg Shrushti Phase-2Arvel RealtorsSurvey No - 97/215-11-2026 00:00:00
Project Details
  • Project:
    Liberty Industrial Park
  • Location:
  • 132/A 132/B 224/2
  • Const. Stage:
    New
  • Possession:
    30 Jun 2025
Developer Details

  • Developer:
    Gurunanak Developers
  • Phone:
  • Address:
  • Sheetal Shagun Industrial Estate
Project RERA Details
MAHA REARA No: P99000049572
Project Type Industrial
RERA Project Status New
Architect S S & Associates
Funding Bank INDIAN BANK
Proposed Possession 30 Jun 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 15 Feb 2023
Last Retrived 28 Jul 2025
Liberty Industrial Park QR Code
Liberty Industrial Park
MahaRERA - P99000049572
Apartment Details & Configuration
TypeArea
INDUSTRIAL1486.5 Sq.mts. ( 16001 Sq.ft. )
INDUSTRIAL1633.8 Sq.mts. ( 17586 Sq.ft. )
INDUSTRIAL1744.98 Sq.mts. ( 18783 Sq.ft. )
INDUSTRIAL2154 Sq.mts. ( 23186 Sq.ft. )
INDUSTRIAL2259.9 Sq.mts. ( 24326 Sq.ft. )
INDUSTRIAL4193.7 Sq.mts. ( 45141 Sq.ft. )
INDUSTRIAL4491.75 Sq.mts. ( 48349 Sq.ft. )
INDUSTRIAL1172.1 Sq.mts. ( 12616 Sq.ft. )
INDUSTRIAL1087.8 Sq.mts. ( 11709 Sq.ft. )
INDUSTRIAL1007.55 Sq.mts. ( 10845 Sq.ft. )
INDUSTRIAL928.95 Sq.mts. ( 9999 Sq.ft. )
INDUSTRIAL1095.3 Sq.mts. ( 11790 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Liberty Industrial Parklast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space 5% completed
5% Complete
704
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station35% completed
35% Complete
Main Electrical Supply Panel
Energy management
Na
Fire Protection And Fire Safety Requirements5% completed
5% Complete
Work In Progress
Landscaping & Tree Planting5% completed
5% Complete
Work In Progress
Open Parking5% completed
5% Complete
Work In Progress
Sewerage (Chamber, Lines, Septic Tank , STP)30% completed
30% Complete
Work In Progress
Solid Waste Management And Disposal5% completed
5% Complete
Work In Progress
Storm Water Drains
Na
Street Lighting5% completed
5% Complete
Work In Progress
Treatment And Disposal Of Sewage And Sullage Water5% completed
5% Complete
Work In Progress
Water Conservation, Rain water Harvesting
Na
Water Supply50% completed
50% Complete
Boring Botter Availble
Buildings / Wings in Liberty Industrial Park
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Liberty Industrial Park by Gurunanak Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

177626 Sq. ft.

Project Area

7583 Sq. ft.

Recreational Open Space

Total 12

Wings / Towers in Project

Apartments Statistics

12 apartments in total
Total
12
Booked
0
Available
12

Saleable Area Statistics (Sq. ft.)

250331 Total
Total
250331
Booked
0
Available
250331
Total 12 apartments in project. 0 apartments booked. 0% apartments booked.
Total 250331 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Plot No 02-Unit No 01

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Plot No 02-Unit No 01Sep 20242100020
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
INDUSTRIAL1486.5 Sq.mts. ( 16001 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Plot No 02-Unit No 01Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Plot No 03-Unit No 02

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Plot No 03-Unit No 02Dec 20242100020
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
INDUSTRIAL1633.8 Sq.mts. ( 17586 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Plot No 03-Unit No 02Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Plot No 04-Unit No 03

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Plot No 04-Unit No 03Jun 20252100020
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
INDUSTRIAL1744.98 Sq.mts. ( 18783 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Plot No 04-Unit No 03Completion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Plot No 05-Unit No-04

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Plot No 05-Unit No-04Feb 20252100020
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
INDUSTRIAL2154 Sq.mts. ( 23186 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Plot No 05-Unit No-04Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Plot No 06-Unit No 05

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Plot No 06-Unit No 05Jan 20252100030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
INDUSTRIAL2259.9 Sq.mts. ( 24326 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Plot No 06-Unit No 05Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Plot No 07-Unit No 06

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Plot No 07-Unit No 06May 20252100030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
INDUSTRIAL4193.7 Sq.mts. ( 45141 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Plot No 07-Unit No 06Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Plot No 08-Unit No 07

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Plot No 08-Unit No 07Mar 20252100030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
INDUSTRIAL4491.75 Sq.mts. ( 48349 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Plot No 08-Unit No 07Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Plot No 09-Unit 08

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Plot No 09-Unit 08Dec 20242100030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
INDUSTRIAL1172.1 Sq.mts. ( 12616 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Plot No 09-Unit 08Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Plot No 10-Unit No 09

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Plot No 10-Unit No 09Feb 20242100020
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
INDUSTRIAL1087.8 Sq.mts. ( 11709 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Plot No 10-Unit No 09Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress35% done
35% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Plot No 11-Unit No 10

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Plot No 11-Unit No 10Jun 20232100020
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
INDUSTRIAL1007.55 Sq.mts. ( 10845 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Plot No 11-Unit No 10Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Plot No 12- Unit No 11

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Plot No 12- Unit No 11Dec 20242100020
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
INDUSTRIAL928.95 Sq.mts. ( 9999 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Plot No 12- Unit No 11Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Plot No 13-Unit No 12

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Plot No 13-Unit No 12May 20252100020
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
INDUSTRIAL1095.3 Sq.mts. ( 11790 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Plot No 13-Unit No 12Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Gurunanak Developers
for Project
Liberty Industrial Park
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation