Project overview

Legranz is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800000141. Legranz is located at Plot No. 5, Cts No. 114. This is a Ongoing being developed by Ekta Shubham Venture.

Legranz has TYPE 1, TYPE 2, TYPE 3 & TYPE 4 Apartments with carpet areas ranging from 290 to 974 Sq.ft. Carpet. The Project has total 24 of which 0 are currently available for sale.

Legranz is being developed on a total land area of 6619 Sq.ft. Legranz has 1 Wings / Towers Legranz

ProjectDeveloperLocationPossession
Godrej PrimeGodrej Redevelopers (Mumbai) Pvt. Ltd.Cts Nos.53/Pt And 52/Pt30-05-2023 00:00:00
Satra HarmonyRrb Realtors Pvt Ltd.831 -Pt31-12-2019 00:00:00
PanoramaEkta Shubham VentureCts No 1746/2131-12-2019 00:00:00
Lucky Chs LtdDsd Infrastructure Pvt. Ltd.1417, 1417/1 To 631-03-2019 00:00:00
Harvest MoonCalvin PropertiesCts No 1389 Plot No 460 Chembur31-12-2019 00:00:00
Sabari Palm ViewSabari Developers LlpCts No 1746 By 1331-03-2019 00:00:00
Krishvi ResidencyShagun Chembur (Aop)176031-12-2019 00:00:00
Little Malabar HillPardis Construction Llp267/1 And 267/2, Cts No 267 Part30-09-2020 00:00:00
Lakshmi VaniTridhaatu Realty & Infra Pvt LimitedPlotno53 And 54Cts No 936 936-1 936-2 936-3 936-4 936-5 936-6 936-7 936-8 936-9 936-10 936-11 936 1230-04-2018 00:00:00
Trishabh SignetDimension Housing Realty Llp129531-12-2019 00:00:00
Shree Saraswati Chsl Plot 8 ANav Durga Construction CompanyCts No 8 A31-12-2018 00:00:00
Amrita PriveSkree Krishna PropertiesCts No. 1450, Plot No 532 Of Ss Ii30-06-2019 00:00:00
Pure GoldSudhir Vasu Shetty119 And 119 131-03-2018 00:00:00
EdificeBuildproCts 302 Plot No 3431-12-2017 00:00:00
Vishwas ChsSiroya Yug Realtors400071, Mumbai Suburban15-08-2018 00:00:00
Kismat ResidencyKismat Devlopers87/3/10Pt,85/930-12-2021 00:00:00
Aura Apartments - Phase 2 11Th FloorBholenath Developers Ltd.1534/1 To 8, Cts 153431-10-2018 00:00:00
Vandana ArtemisThree Towers Lifespace Llp54 Part30-12-2021 00:00:00
StevelandCalvin PropertiesCts No 1580 1580/1 And 1580/2 Plot No 267 Chembur30-12-2021 00:00:00
Redevelopment Of Apsara Chs Ltd.Heritage Lifestyles & Developers Pvt.Ltd.973/1 To 9, Plot No.117, Cts Nos. 97331-12-2019 00:00:00
AbhilashSanjona Builders400071, Mumbai Suburban30-12-2017 00:00:00
Building On Plot Bearing Cts No 833 Pt At Mhada Layout As Rna Continental Subhash Nagar Mumbai 71G A Builders Pvt Ltd.833 Pt At Mhada Layout As Rna Continental Subhash Nagar Chembur East Mumbai 40007131-01-2021 00:00:00
Chembur Shri Sai Shraddha ChsUnity Land Consultancy116 Part31-12-2018 00:00:00
Pearl BellezaChembur Hotels Private LimitedCts 91031-12-2018 00:00:00
Tridhaatu Bhaveshwar VilasTridhaatu Bhaveshwar Developers Llp17Th Road31-10-2018 00:00:00
Zen ApartmentsBholenath Developers Ltd.Plot No. 421 C.T.S. No. 1287/1287 1 To 631-03-2018 00:00:00
Rite SkyluxeRite Developers Pvt. Ltd.Cts No 831-Pt 831-59 To 7031-12-2018 00:00:00
Ariso ApartmentKyraa Housing Projects828 Part/ 64 To 75, Cts No 828 Part30-12-2024 00:00:00
Sabari HillgrangeSabari Developers LlpCts No 1531A Chembur Village31-05-2019 00:00:00
Central ParkShree Ganesh Enterprises552/1 To 9 /14-A, 55231-12-2019 00:00:00
Poonam EnclavePrakash PatelMumbai Suburban, 40007131-12-2015 00:00:00
Sai SansarConcrete Builders1274/1, Cts 1274, Plot No 42730-12-2023 00:00:00
Simran HeightsVikas Narayan Raikar379, 378/1 To 3, 376, 377, 379/1, 375, , 376/1 To 3, 374, 380/1 To 3, 37824-09-2019 00:00:00
Anu-Smera CelesteAnusmera Realty & Infra Private Limited8411To8 And 842, Cts No 841, 8421To830-12-2021 00:00:00
Vishnu ApolloThree Towers Lifespace Llp54 Part30-12-2021 00:00:00
Safal Sai And Safal SainathMangalnath Developers Pvt Ltd5261 & 2, 416, 416 1 To 58, Cts No. 45330-12-2023 00:00:00
Devi Kakad SolitaireNiraj Kakad Constructions40007128-02-2018 00:00:00
Hubtown Seasons - I WingJoynest Premises Private LimitedCts No. 469-A30-12-2025 00:00:00
NakshatraMetro Developers Co.Cts No - 45730-03-2022 00:00:00
Hubtown Seasons - DaintreeJoynest Premises Private LimitedCts No.469-A30-12-2024 00:00:00
Sabari ShobhaSabari Developers LlpCts 1612, 1612-1 To 4 Chembur Village30-11-2020 00:00:00
Arham BrindavanMahavir EnterprisesCts No. 843, 843/1 To 731-12-2017 00:00:00
Suvidha SolitairePremier Infotech Pvt LtdMumbai Suburban, 40007131-12-2027 00:00:00
Kukreja EstateSonu Realtors Private Limited165430-04-2023 00:00:00
LourdesVictor Homes Pvt Ltd40007130-12-2023 00:00:00
Parvati SadanMeena Builder Unit Of V N Raikar HufCts 94430-06-2021 00:00:00
Meraki ArenaMeraki Habitats LlpCts No 667 619/21A And 21 B 619/14 619/15 Of Village Borla30-11-2020 00:00:00
Castle PeakInnerspace190/1, Plot No. 142 Cts No. 19031-03-2018 00:00:00
Hari Kunj IiiKukreja Construction CoCts No.128/B/12A30-09-2020 00:00:00
Natekar HeightsSabari Developers LlpCts No 1270 Chembur31-05-2019 00:00:00
Arham AumMahavir Enterprises322/1031-12-2017 00:00:00
The Golf Boulevard Building - 1Empress & Adishakti JvC S No.172030-06-2022 00:00:00
Shrikant Chembers IiShrikant Studios Pvt. Ltd.400071, Mumbai Suburban31-03-2022 00:00:00
Maa KamalVirat Builders5831-07-2019 00:00:00
Chembur Manshanti ChslMenorah Realties Private LimitedPlot No 10 Survey No 14 A Cts No 5630-12-2023 00:00:00
Hubtown Seasons - Ecuador CloudJoynest Premises Private LimitedCts No.469-A30-12-2024 00:00:00
AeraRe Infra Pvt LtdPlot No 560 Cts No 146831-12-2018 00:00:00
Sai LeelaVriti Infrastructure Pvt. Ltd.Plot No 118-C, Cts No 296 Part And 296/3 And 296/431-12-2017 00:00:00
Vighnaharta Sra Chs LtdParsn Construction And Developers Private LimitedCts 467 Part Village Chembur Tal Kurla30-12-2024 00:00:00
Trishabh Greens - Wing ARishabh Enterprises1675, 167730-12-2025 00:00:00
Amaltas ResidencyTattva & Mittal Corporation Pvt Ltd853 Part 853 - 15 To 853 - 2231-12-2019 00:00:00
Srinivas BuildingArjun Development & Construction ( India ) Private LimitedC T S 1279A31-12-2019 00:00:00
RudrakshSandu DevelopersCts 1630, 1630/1 To 531-10-2018 00:00:00
Chaurang ShraddhaM/S. Chaurang Developers166931-12-2017 00:00:00
Hubtown Seasons CzarnowoJoynest Premises Private LimitedCts No. 469 A31-07-2025 00:00:00
Sabari AshvilleSabari Jani AssociatesCts No 452 A B Of Village Borla31-12-2017 00:00:00
Hresa - Sainagar Apartment Pvt. Ltd.Bholenath Developers Ltd.1508/1, Plot No. 6, C.T.S. No. 150814-11-2022 00:00:00
Subhash Nagar Building No 22G A Builders Pvt Ltd.Mumbai Suburban, 40007130-04-2022 00:00:00
Tridhaatu Atharva Venkatesh SadanTridhaatu Venkatesh Sadan Developers LlpV N Purav Marg31-01-2019 00:00:00
RajeswariShree Krishna Homes Pvt Ltd925/1 To 731-12-2017 00:00:00
Le JardinJay Construction India619, 619/1, 619/318-05-2018 00:00:00
Krishna NiwasShree Krishna Homes Pvt LtdPlot No 55731-12-2017 00:00:00
Amardeep ChsAkshay Sthapatya H.S.A.981/1 To 8, 98131-12-2018 00:00:00
Balaji EmpireM/S Trimurti &Amp; K. Mukesh Builders And DevelopersMumbai Suburban, 40007131-12-2008 00:00:00
AtharvaMaya Developers5630-09-2020 00:00:00
Godrej RksGodrej Projects Development LimitedComprised Within Cts No 673, 783 Part, 673/1 To 673/2030-12-2024 00:00:00
Girivan La QuintaAbhishek Mahesh Garodia112 Plot No 1 And 230-04-2025 00:00:00
Trishabh Greens - Wing CRishabh Enterprises1677/1 To 4, 167530-06-2027 00:00:00
Trishabh Greens - Wing BRishabh Enterprises1677, 167530-12-2025 00:00:00
SamaraCharisma Builders Ltd369, V. N. Purav Marg, Mumbai - 400071, Village Chembur30-03-2024 00:00:00
NishirajUnique Builders & Developers73/1To 73/5 And 74, 7331-03-2019 00:00:00
Mani BhavanChhadva AssociatesPlot No.2A, 1639, 1639/1-231-12-2019 00:00:00
Shivpuri Building No.10 Chs Ltd - Shivam HeightsSidhivinayak ConstructionsPlot No 10 Cts No 454/18 Of Village Chembur31-12-2018 00:00:00
ApurvaSidhivinayak ConstructionsCts No 464, 464/1 To 1831-12-2018 00:00:00
Radha ContinentalSacvir Dimensions LlpCentral Avenue Road, Chembur, 40007131-10-2027 00:00:00
Tricity NatrajTricity Realty Llp165 Pt., 16531-12-2025 00:00:00
Hubtown Seasons - B WingJoynest Premises PrivatelimitedCts No 469-A31-07-2025 00:00:00
Dhoot Adi Residency-Shree Adi House ChslDhoot Developers Pvt. Ltd.938, 938/ 1 To 731-12-2018 00:00:00
Shubham Trident - Sundew, Sunrise And SunglowShubham Homes And Contractors Pvt. Ltd.1526 15261 To 2 1527 15271 To 4 1564 15641 To 430-12-2023 00:00:00
InnoventuresInnoventures Infrastructure Pvt Ltd1845-186630-12-2024 00:00:00
SriniketanMajestic Royale Developers100330-12-2022 00:00:00
ChidakashYashvi Corporation1005,1005/1 To 631-12-2026 00:00:00
Sahakar Nagar Grace Co-Op. Hsg. Soc. LtdApoorva Homes54 Part31-12-2019 00:00:00
Raj Ekjyot SukrutiSadguna Realty431, 431/4-1531-12-2018 00:00:00
The HarvestBindu Raheja And Sons Llp148630-06-2028 00:00:00
Redevelopment Of Sri Guruvayurappan Balmukund Co-Operative Housing Society Ltd.Smera Homes LlpPlot No. 472 And C.T.S. No. 1339, 1339/1 To 430-09-2024 00:00:00
Avighna Chs LtdMajestic Royale Developers139830-09-2024 00:00:00
Ekta CrestEkta Housing Private Limited15131-12-2025 00:00:00
Shankar Bhavan Premises Co-Operative Society LimitedMishal Construction Private Limited40007131-12-2019 00:00:00
Srushti EnclaveGadkari Builders & AssociatesCts No 1424, 1424/1 To 13, S No 67 To 7131-12-2019 00:00:00
Subhash Nagar Navrang Chs Adityaraj SupremeRoyale HousingSurvey No 67 To 71 Cts No 82631-12-2026 00:00:00
Thapar Le ParcSamarpeet Properties Pvt Ltd1269, 1269/ 1 To 2030-06-2026 00:00:00
Arihant SkyArihant Builders & DevelopersC.T.S. No. 830(Pt.)30-12-2026 00:00:00
Udaya BhuvanShree Krishna Homes Pvt LtdCts No 5631-03-2019 00:00:00
JaihindS.P. Erectors And Developers Private Limited553 Pt31-12-2023 00:00:00
One Meraki - Wing A & Wing BMeraki Habitats Llp667A/2C And 667A/2D Of Village Borla, 667A/2B, Cts No 667A/2A30-12-2023 00:00:00
Vishwa BhuvanMajestic Royale City Developers1622, 1622 / 1 To 431-03-2026 00:00:00
49, Simandhar RoyaleSimandhar Homes Llp828 (Pt), 828/52 To 828/6331-12-2026 00:00:00
Manshaya ApartmentsMass Construction1765 10A31-12-2026 00:00:00
Balaji Arcade Wing CShikhar DevelopersSurvey No 7 Hissa No.10 1321 Old Survey No31-12-2019 00:00:00
Amarjyoti Chs LtdMajestic Royale Developers1397/1 To 4, 139730-09-2024 00:00:00
Rgs AnantyaSingh Holding Pvt Ltd176510A130-06-2023 00:00:00
InsigniaTwo Taurus Realty Llp299/A Of Ss No Iii Of Chembur Cts No 160531-12-2026 00:00:00
Shankar Darshan Chs LtdMajestic Royale Developers1107 31-12-2026 00:00:00
Kranti HeightsSidhivinayak Constructions366/3430-09-2026 00:00:00
Girivan ShivkunjShri Sati Builders And Developers Private Limited990/1 To 5, Plot No 99031-03-2020 00:00:00
Ekjyot SanmaanDheeraj P Vohra23/ 492 492/1/230-12-2023 00:00:00
Tulsi ChambersSurana Construction (Chembur )Cts 38530-06-2021 00:00:00
Highway View Phase 1Unity Land Consultancy61 Part, 6030-12-2020 00:00:00
Moulick EnclaveSrushti Sangam Developers Pvt Ltd947, 947/101-09-2023 00:00:00
United ElicasIi Walls Infra LlpMumbai, 452/130-12-2024 00:00:00
LegranzEkta Shubham VenturePlot No. 5, Cts No. 11431-12-2018 00:00:00
OrionNivaan Infratech Private LimitedCts Nos. 471 47231-12-2017 00:00:00
GeetanjaliKukreja Construction CoPlot No. 184. Ss Iii, M West Ward, 15Th Road, Village Chembur31-12-2017 00:00:00
Poddar Spraha Diamond Phase-IPoddar Housing And Development LimitedCts No 828 Pt And 1504 A Pt30-12-2021 00:00:00
Casa CelesteAster Developers400071, Mumbai City31-12-2019 00:00:00
A.R VintageA.R Associates123530-05-2022 00:00:00
Queens GloryVaibhavlaxmi Builders And DevelopersCts No 831 Part31-12-2027 00:00:00
Serenity HeightsS And T Developers186/A/2, 506/A/1 And 506/A/431-12-2027 00:00:00
Sayba SamriddhiShanaya StarSurvey 67-71, C.T.S. No. 826(Pt)30-06-2027 00:00:00
Project Details
  • Project:
    Legranz
  • Location:
  • Plot No. 5, Cts No. 114
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2018
Developer Details

  • Developer:
    Ekta Shubham Venture
  • Phone:
  • Address:
  • Hallmark Business Plaza
Project RERA Details
MAHA REARA No: P51800000141
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Karani & Sanghoi Designers
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2018
Revised Possession 31 Dec 2018
Extended Possession 31 Dec 2019
Litigations No Litigations
Last Modified 10 Dec 2018
Last Retrived 26 Jul 2025
Legranz QR Code
Legranz
MahaRERA - P51800000141
Apartment Details & Configuration
TypeArea
TYPE 190.45 Sq.mts. ( 974 Sq.ft. )
TYPE 240.44 Sq.mts. ( 435 Sq.ft. )
TYPE 380.3 Sq.mts. ( 864 Sq.ft. )
TYPE 426.9 Sq.mts. ( 290 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Legranzlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
There Will Be No Receiving Station
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed
Landscaping & Tree Planting
Na
Open Parking
Started
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply100% completed
95% Complete
Completed
Buildings / Wings in Legranz
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Legranz by Ekta Shubham Venturelast updated on 26 Jul 2025 as per information obtained from MARA RERA.

6619 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

24 apartments in total
Total
24
Booked
24
Available
0

Saleable Area Statistics (Sq. ft.)

16652 Total
Total
16652
Booked
16652
Available
0
Total 24 apartments in project. 24 apartments booked. 100% apartments booked.
Total 16652 Sq.ft. saleable area. 16652 saleable area booked.
100% area booked.

Legranz

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
LegranzDec 2018141010621
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE 190.45 Sq.mts. ( 974 Sq.ft. )11
11 Booked100% Booked
100% Booked
TYPE 240.44 Sq.mts. ( 435 Sq.ft. )11
11 Booked100% Booked
100% Booked
TYPE 380.3 Sq.mts. ( 864 Sq.ft. )1
1 Booked100% Booked
100% Booked
TYPE 426.9 Sq.mts. ( 290 Sq.ft. )1
1 Booked100% Booked
100% Booked
24 total apartments / 24 apartments booked. 100% apartments booked.
Work Description in Building LegranzCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Ekta Shubham Venture
for Project
Legranz
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation