Project overview

Leela Tara is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900008194. Leela Tara is located at 2240. This is a Ongoing being developed by Sakaar Developers.

Leela Tara has 01 BHK TYPE ONE, 01 BHK TYPE THREE, 01 BHK TYPE TWO, 02 BHK TYPE FOUR, 02 BHK TYPE ONE, 02 BHK TYPE THREE & 02 BHK TYPE TWO Apartments with carpet areas ranging from 320 to 779 Sq.ft. Carpet. The Project has total 17 of which 6 are currently available for sale.

Leela Tara is being developed on a total land area of 4536 Sq.ft. Leela Tara has 1 Wings / Towers Leela Tara

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Leela Tara
  • Location:
  • 2240
  • Const. Stage:
    Ongoing
  • Possession:
    31 Mar 2019
Developer Details

  • Developer:
    Sakaar Developers
  • Phone:
  • Address:
  • Shree Goverdhan Bhuvan, Gr. Flr
Project RERA Details
MAHA REARA No: P51900008194
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Pagnis & Pagnis
Funding Bank BANK OF BARODA
Proposed Possession 31 Mar 2019
Revised Possession 31 Mar 2019
Extended Possession
Litigations No Litigations
Last Modified 18 Aug 2017
Last Retrived 26 Jul 2025
Leela Tara QR Code
Leela Tara
MahaRERA - P51900008194
Apartment Details & Configuration
TypeArea
01 BHK TYPE ONE29.79 Sq.mts. ( 321 Sq.ft. )
01 BHK TYPE THREE29.71 Sq.mts. ( 320 Sq.ft. )
01 BHK TYPE TWO31.37 Sq.mts. ( 338 Sq.ft. )
02 BHK TYPE FOUR69.2 Sq.mts. ( 745 Sq.ft. )
02 BHK TYPE ONE62.58 Sq.mts. ( 674 Sq.ft. )
02 BHK TYPE THREE72.35 Sq.mts. ( 779 Sq.ft. )
02 BHK TYPE TWO68.06 Sq.mts. ( 733 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Leela Taralast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply100% completed
95% Complete
Completed
Buildings / Wings in Leela Tara
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Leela Tara by Sakaar Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

4536 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

17 apartments in total
Total
17
Booked
11
Available
6

Saleable Area Statistics (Sq. ft.)

9443 Total
Total
9443
Booked
5284
Available
4160
Total 17 apartments in project. 11 apartments booked. 64% apartments booked.
Total 9443 Sq.ft. saleable area. 5284 saleable area booked.
56% area booked.

Leela Tara

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Leela TaraJan 190023100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
01 BHK TYPE ONE29.79 Sq.mts. ( 321 Sq.ft. )3
3 Booked100% Booked
100% Booked
01 BHK TYPE THREE29.71 Sq.mts. ( 320 Sq.ft. )1
1 Booked100% Booked
100% Booked
01 BHK TYPE TWO31.37 Sq.mts. ( 338 Sq.ft. )3
3 Booked100% Booked
100% Booked
02 BHK TYPE FOUR69.2 Sq.mts. ( 745 Sq.ft. )1
1 Booked100% Booked
100% Booked
02 BHK TYPE ONE62.58 Sq.mts. ( 674 Sq.ft. )4
None Booked0% Booked
0% Booked
02 BHK TYPE THREE72.35 Sq.mts. ( 779 Sq.ft. )1
1 Booked100% Booked
100% Booked
02 BHK TYPE TWO68.06 Sq.mts. ( 733 Sq.ft. )4
2 Booked50% Booked
50% Booked
17 total apartments / 11 apartments booked. 64% apartments booked.
Work Description in Building Leela TaraCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Sakaar Developers
for Project
Leela Tara
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation