Project overview

Lakadawala Sapphire 19 To 22 Floor is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900011194. Lakadawala Sapphire 19 To 22 Floor is located at 3942. This is a Ongoing being developed by Sadique Anwar Koradia.

Lakadawala Sapphire 19 To 22 Floor has 1bhk & 2 bhk Apartments with carpet areas ranging from 394 to 507 Sq.ft. Carpet. The Project has total 8 of which 3 are currently available for sale.

Lakadawala Sapphire 19 To 22 Floor is being developed on a total land area of 3213 Sq.ft. out of which 1177 Sq.ft. i.e 37% is reserved for recreational purposes. Lakadawala Sapphire 19 To 22 Floor has 1 Wings / Towers Lakadawala Sapphire 19 Floor To 22 Floor

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Lakadawala Sapphire 19 To 22 Floor
  • Location:
  • 3942
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2018
Developer Details

  • Developer:
    Sadique Anwar Koradia
  • Phone:
  • Address:
  • Koradia House
Project RERA Details
MAHA REARA No: P51900011194
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Gajjar & Associates Consultants Pvt Ltd
Funding Bank BANK OF INDIA
Proposed Possession 31 Dec 2018
Revised Possession 31 Dec 2018
Extended Possession
Litigations No Litigations
Last Modified 31 Aug 2017
Last Retrived 26 Jul 2025
Lakadawala Sapphire 19 To 22 Floor QR Code
Lakadawala Sapphire 19 To 22 Floor
MahaRERA - P51900011194
Apartment Details & Configuration
TypeArea
1bhk36.6 Sq.mts. ( 394 Sq.ft. )
2 bhk47.11 Sq.mts. ( 507 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Lakadawala Sapphire 19 To 22 Floorlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Building /Layout Amenity
Energy management
Na
Fire Protection And Fire Safety Requirements
Building /Layout Amenity
Landscaping & Tree Planting
Building /Layout Amenity
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Building /Layout Amenity
Solid Waste Management And Disposal
Na
Storm Water Drains
Building /Layout Amenity
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Building /Layout Amenity
Water Supply
Building /Layout Amenity
Buildings / Wings in Lakadawala Sapphire 19 To 22 Floor
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Lakadawala Sapphire 19 To 22 Floor by Sadique Anwar Koradialast updated on 26 Jul 2025 as per information obtained from MARA RERA.

3213 Sq. ft.

Project Area

1177 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

8 apartments in total
Total
8
Booked
5
Available
3

Saleable Area Statistics (Sq. ft.)

3491 Total
Total
3491
Booked
2196
Available
1295
Total 8 apartments in project. 5 apartments booked. 62% apartments booked.
Total 3491 Sq.ft. saleable area. 2196 saleable area booked.
63% area booked.

Lakadawala Sapphire 19 Floor To 22 Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Lakadawala Sapphire 19 Floor To 22 FloorJan 19005100400
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1bhk36.6 Sq.mts. ( 394 Sq.ft. )5
3 Booked60% Booked
60% Booked
2 bhk47.11 Sq.mts. ( 507 Sq.ft. )3
2 Booked66% Booked
66% Booked
8 total apartments / 5 apartments booked. 62% apartments booked.
Work Description in Building Lakadawala Sapphire 19 Floor To 22 FloorCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
work-in-progress81% done
81% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress81% done
81% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress81% done
81% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress81% done
81% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress81% done
81% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress81% done
81% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress81% done
81% Booked
Sanitary Fittings within the flats / premises
work-in-progress81% done
81% Booked
Slabs of Super Structure
work-in-progress23% done
23% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress81% done
81% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress81% done
81% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress81% done
81% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress23% done
23% Booked
Channel Partners
Channel Partners Registered by Developer
Sadique Anwar Koradia
for Project
Lakadawala Sapphire 19 To 22 Floor
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation