Project overview

La Charmaine Chsl is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800051287. La Charmaine Chsl is located at 202, 202/1 To 6, 206-D. This is a New being developed by Jdn Developers.

La Charmaine Chsl has 2 BHK & 3 BHK Apartments with carpet areas ranging from 630 to 918 Sq.ft. Carpet. The Project has total 19 of which 19 are currently available for sale.

La Charmaine Chsl is being developed on a total land area of 12655 Sq.ft. La Charmaine Chsl has 1 Wings / Towers La Charmaine Chsl

ProjectDeveloperLocationPossession
Project Details
  • Project:
    La Charmaine Chsl
  • Location:
  • 202, 202/1 To 6, 206-D
  • Const. Stage:
    New
  • Possession:
    31 Dec 2025
Developer Details

  • Developer:
    Jdn Developers
  • Phone:
  • Address:
  • Mhatre Plaza 2 Premises Chs
Project RERA Details
MAHA REARA No: P51800051287
Project Type Residential / Group Housing
RERA Project Status New
Architect Ray Consultants
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 08 Jun 2023
Last Retrived 26 Jul 2025
La Charmaine Chsl QR Code
La Charmaine Chsl
MahaRERA - P51800051287
Apartment Details & Configuration
TypeArea
2 BHK58.55 Sq.mts. ( 630 Sq.ft. )
2 BHK59.03 Sq.mts. ( 635 Sq.ft. )
3 BHK75.43 Sq.mts. ( 812 Sq.ft. )
3 BHK85.26 Sq.mts. ( 918 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of La Charmaine Chsllast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Will Be Done Before Possesion
Energy management
Wip
Fire Protection And Fire Safety Requirements
Will Be Done Before Possesion
Landscaping & Tree Planting
As Per Approved Plan
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Will Be Done Before Possesion
Solid Waste Management And Disposal
Na
Storm Water Drains
Will Be Done Before Possesion
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Will Be Done Before Possesion
Water Supply
Will Be Done Before Possesion
Buildings / Wings in La Charmaine Chsl
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of La Charmaine Chsl by Jdn Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

12655 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

19 apartments in total
Total
19
Booked
0
Available
19

Saleable Area Statistics (Sq. ft.)

13316 Total
Total
13316
Booked
0
Available
13316
Total 19 apartments in project. 0 apartments booked. 0% apartments booked.
Total 13316 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

La Charmaine Chsl

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
La Charmaine ChslDec 202571010036
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK58.55 Sq.mts. ( 630 Sq.ft. )12
None Booked0% Booked
0% Booked
2 BHK59.03 Sq.mts. ( 635 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK75.43 Sq.mts. ( 812 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK85.26 Sq.mts. ( 918 Sq.ft. )4
None Booked0% Booked
0% Booked
19 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building La Charmaine ChslCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress21% done
21% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Jdn Developers
for Project
La Charmaine Chsl
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation