Project overview

L And T Seawoods Residences - North Towers is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700026653. L And T Seawoods Residences - North Towers is located at R-1. This is a New being developed by L&T Seawoods Limited.

L And T Seawoods Residences - North Towers has 3 BHK GRANDIO 4, 3 BHK GRANDIO 5, 3 BHK GRANDIO 7, 3 BHK GRANDIO 8, 3 BHK GRANDIO 9, 3 BHK SUPREME 10, 3 BHK SUPREME 11, 3 BHK SUPREME 12, 3 BHK SUPREME 13, 3 BHK SUPREME 14, 3 BHK SUPREME 9 & Shop Apartments with carpet areas ranging from 1911 to 956 Sq.ft. Carpet. The Project has total 242 of which 4 are currently available for sale.

L And T Seawoods Residences - North Towers is being developed on a total land area of 31379 Sq.ft. L And T Seawoods Residences - North Towers has 3 Wings / Towers Tower D01,Tower D02,Tower D03

ProjectDeveloperLocationPossession
L And T Seawoods-Jasper At West SquareL&T Realty Prpoperties LimitedR-1, Village Nerul31-07-2027 00:00:00
L And T Seawoods - Opal At West SquareL&T Realty Properties LimitedR-1 Village Nerul31-01-2027 00:00:00
L And T Seawoods - Amber At West SquareL&T Realty Properties LimitedR-1,Village Nerul31-07-2027 00:00:00
Project Details
  • Project:
    L And T Seawoods Residences - North Towers
  • Location:
  • R-1
  • Const. Stage:
    New
  • Possession:
    30 Dec 2024
Developer Details

  • Developer:
    L&T Seawoods Limited
  • Phone:
  • Address:
  • L&T House,
Project RERA Details
MAHA REARA No: P51700026653
Project Type Residential / Group Housing
RERA Project Status New
Architect Hiten Sethi & Associates
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 30 Dec 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 16 Feb 2021
Last Retrived 26 Jul 2025
L And T Seawoods Residences - North Towers QR Code
L And T Seawoods Residences - North Towers
MahaRERA - P51700026653
Apartment Details & Configuration
TypeArea
2 BHK ELEGANTE 454.1 Sq.mts. ( 582 Sq.ft. )
2 BHK ELEGANTE 555.2 Sq.mts. ( 594 Sq.ft. )
2 BHK ELEGANTE 655.3 Sq.mts. ( 595 Sq.ft. )
2 BHK ELITE 450.6 Sq.mts. ( 545 Sq.ft. )
2 BHK ELITE 550.7 Sq.mts. ( 546 Sq.ft. )
3 BHK GRANDIO 175.1 Sq.mts. ( 808 Sq.ft. )
3 BHK GRANDIO 275.5 Sq.mts. ( 813 Sq.ft. )
3 BHK GRANDIO 375.8 Sq.mts. ( 816 Sq.ft. )
3 BHK GRANDIO 776.6 Sq.mts. ( 825 Sq.ft. )
3 BHK SUPREME 182 Sq.mts. ( 883 Sq.ft. )
3 BHK SUPREME 282.1 Sq.mts. ( 884 Sq.ft. )
3 BHK SUPREME 482.3 Sq.mts. ( 886 Sq.ft. )
3 BHK SUPREME 582.4 Sq.mts. ( 887 Sq.ft. )
2 BHK ELEGANTE 153.2 Sq.mts. ( 573 Sq.ft. )
2 BHK ELEGANTE 253.3 Sq.mts. ( 574 Sq.ft. )
2 BHK ELEGANTE 353.8 Sq.mts. ( 579 Sq.ft. )
2 BHK ELEGANTE 756.4 Sq.mts. ( 607 Sq.ft. )
2 BHK ELEGANTE 856.5 Sq.mts. ( 608 Sq.ft. )
2 BHK ELEGANTE 957.4 Sq.mts. ( 618 Sq.ft. )
2 BHK ELITE 149.1 Sq.mts. ( 529 Sq.ft. )
2 BHK ELITE 249.2 Sq.mts. ( 530 Sq.ft. )
2 BHK ELITE 349.7 Sq.mts. ( 535 Sq.ft. )
3 BHK GRANDIO 676.4 Sq.mts. ( 822 Sq.ft. )
3 BHK GRANDIO 977.7 Sq.mts. ( 836 Sq.ft. )
3 BHK SUPREME 382.2 Sq.mts. ( 885 Sq.ft. )
3 BHK SUPREME 682.6 Sq.mts. ( 889 Sq.ft. )
3 BHK SUPREME 783.1 Sq.mts. ( 894 Sq.ft. )
3 BHK SUPREME 883.5 Sq.mts. ( 899 Sq.ft. )
3 BHK GRANDIO 476 Sq.mts. ( 818 Sq.ft. )
3 BHK GRANDIO 576.1 Sq.mts. ( 819 Sq.ft. )
3 BHK GRANDIO 877.1 Sq.mts. ( 830 Sq.ft. )
3 BHK SUPREME 1087.3 Sq.mts. ( 940 Sq.ft. )
3 BHK SUPREME 1187.5 Sq.mts. ( 942 Sq.ft. )
3 BHK SUPREME 1288 Sq.mts. ( 947 Sq.ft. )
3 BHK SUPREME 1388.4 Sq.mts. ( 952 Sq.ft. )
3 BHK SUPREME 1488.8 Sq.mts. ( 956 Sq.ft. )
3 BHK SUPREME 987.2 Sq.mts. ( 939 Sq.ft. )
Shop177.56 Sq.mts. ( 1911 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of L And T Seawoods Residences - North Towerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
For Larger Layout
Amphitheatre
For Larger Layout
Badminton Court
For Larger Layout
Barbeque area
For Larger Layout
Children's play equipment
For Larger Layout
Community Buildings90% completed
90% Complete
.
Community Hall
For Larger Layout
Electrical Meter Room, Sub-Station, Receiving Station
For Cluster Of Towers
Energy management
For Cluster Of Towers
Fire Protection And Fire Safety Requirements80% completed
80% Complete
For Cluster Of Towers
Games Room
For Larger Layout
Gymnasium & Yoga
For Larger Layout
Jacuzzi
For Larger Layout
Landscape Garden
For Larger Layout
Landscaping & Tree Planting
For Cluster Of Towers
Lounge Area
For Larger Layout
Mini Theatre
For Larger Layout
Multi Games Court
For Larger Layout
Open Parking
Na
Recreational Space
For Larger Layout
Sauna/ Steam
For Larger Layout
Sewerage (Chamber, Lines, Septic Tank , STP)80% completed
80% Complete
For Cluster Of Towers
Solid Waste Management And Disposal90% completed
90% Complete
For Cluster Of Towers
Storm Water Drains80% completed
80% Complete
For Cluster Of Towers
Street Lighting50% completed
50% Complete
For Cluster Of Towers
Swimming Pool and Kids Pool
For Larger Layout
Treatment And Disposal Of Sewage And Sullage Water80% completed
80% Complete
For Cluster Of Towers
Water Conservation, Rain water Harvesting80% completed
80% Complete
For Cluster Of Towers
Water Supply85% completed
85% Complete
For Cluster Of Towers
Buildings / Wings in L And T Seawoods Residences - North Towers
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of L And T Seawoods Residences - North Towers by L&T Seawoods Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

31379 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

242 apartments in total
Total
242
Booked
238
Available
4

Saleable Area Statistics (Sq. ft.)

190166 Total
Total
190166
Booked
185706
Available
4460
Total 242 apartments in project. 238 apartments booked. 98% apartments booked.
Total 190166 Sq.ft. saleable area. 185706 saleable area booked.
98% area booked.

Tower D01

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower D01Jun 20242112000141
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK ELEGANTE 454.1 Sq.mts. ( 582 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK ELEGANTE 555.2 Sq.mts. ( 594 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK ELEGANTE 655.3 Sq.mts. ( 595 Sq.ft. )6
6 Booked100% Booked
100% Booked
2 BHK ELITE 450.6 Sq.mts. ( 545 Sq.ft. )6
6 Booked100% Booked
100% Booked
2 BHK ELITE 550.7 Sq.mts. ( 546 Sq.ft. )8
8 Booked100% Booked
100% Booked
3 BHK GRANDIO 175.1 Sq.mts. ( 808 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK GRANDIO 275.5 Sq.mts. ( 813 Sq.ft. )12
12 Booked100% Booked
100% Booked
3 BHK GRANDIO 375.8 Sq.mts. ( 816 Sq.ft. )10
10 Booked100% Booked
100% Booked
3 BHK GRANDIO 776.6 Sq.mts. ( 825 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK SUPREME 182 Sq.mts. ( 883 Sq.ft. )6
6 Booked100% Booked
100% Booked
3 BHK SUPREME 282.1 Sq.mts. ( 884 Sq.ft. )7
7 Booked100% Booked
100% Booked
3 BHK SUPREME 482.3 Sq.mts. ( 886 Sq.ft. )6
6 Booked100% Booked
100% Booked
3 BHK SUPREME 582.4 Sq.mts. ( 887 Sq.ft. )7
7 Booked100% Booked
100% Booked
78 total apartments / 78 apartments booked. 100% apartments booked.
Work Description in Building Tower D01Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress80% done
80% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress80% done
80% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress69% done
69% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress70% done
70% Booked
Sanitary Fittings within the flats / premises
work-in-progress70% done
70% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress70% done
70% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress70% done
70% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress80% done
80% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower D02

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower D02Jun 20242112000134
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK ELEGANTE 153.2 Sq.mts. ( 573 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK ELEGANTE 253.3 Sq.mts. ( 574 Sq.ft. )6
6 Booked100% Booked
100% Booked
2 BHK ELEGANTE 353.8 Sq.mts. ( 579 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK ELEGANTE 756.4 Sq.mts. ( 607 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK ELEGANTE 856.5 Sq.mts. ( 608 Sq.ft. )6
6 Booked100% Booked
100% Booked
2 BHK ELEGANTE 957.4 Sq.mts. ( 618 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK ELITE 149.1 Sq.mts. ( 529 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK ELITE 249.2 Sq.mts. ( 530 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK ELITE 349.7 Sq.mts. ( 535 Sq.ft. )3
3 Booked100% Booked
100% Booked
3 BHK GRANDIO 676.4 Sq.mts. ( 822 Sq.ft. )13
13 Booked100% Booked
100% Booked
3 BHK GRANDIO 977.7 Sq.mts. ( 836 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK SUPREME 182 Sq.mts. ( 883 Sq.ft. )14
13 Booked92% Booked
92% Booked
3 BHK SUPREME 282.1 Sq.mts. ( 884 Sq.ft. )4
4 Booked100% Booked
100% Booked
3 BHK SUPREME 382.2 Sq.mts. ( 885 Sq.ft. )4
4 Booked100% Booked
100% Booked
3 BHK SUPREME 682.6 Sq.mts. ( 889 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK SUPREME 783.1 Sq.mts. ( 894 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK SUPREME 883.5 Sq.mts. ( 899 Sq.ft. )1
1 Booked100% Booked
100% Booked
82 total apartments / 80 apartments booked. 97% apartments booked.
Work Description in Building Tower D02Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress80% done
80% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress80% done
80% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress69% done
69% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress70% done
70% Booked
Sanitary Fittings within the flats / premises
work-in-progress70% done
70% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress70% done
70% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress70% done
70% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress80% done
80% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower D03

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower D03Jun 20242112000178
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK GRANDIO 476 Sq.mts. ( 818 Sq.ft. )20
20 Booked100% Booked
100% Booked
3 BHK GRANDIO 576.1 Sq.mts. ( 819 Sq.ft. )7
7 Booked100% Booked
100% Booked
3 BHK GRANDIO 776.6 Sq.mts. ( 825 Sq.ft. )13
13 Booked100% Booked
100% Booked
3 BHK GRANDIO 877.1 Sq.mts. ( 830 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK GRANDIO 977.7 Sq.mts. ( 836 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK SUPREME 1087.3 Sq.mts. ( 940 Sq.ft. )13
13 Booked100% Booked
100% Booked
3 BHK SUPREME 1187.5 Sq.mts. ( 942 Sq.ft. )4
4 Booked100% Booked
100% Booked
3 BHK SUPREME 1288 Sq.mts. ( 947 Sq.ft. )13
13 Booked100% Booked
100% Booked
3 BHK SUPREME 1388.4 Sq.mts. ( 952 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK SUPREME 1488.8 Sq.mts. ( 956 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK SUPREME 987.2 Sq.mts. ( 939 Sq.ft. )7
7 Booked100% Booked
100% Booked
Shop177.56 Sq.mts. ( 1911 Sq.ft. )1
None Booked0% Booked
0% Booked
82 total apartments / 80 apartments booked. 97% apartments booked.
Work Description in Building Tower D03Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress80% done
80% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress80% done
80% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress69% done
69% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress70% done
70% Booked
Sanitary Fittings within the flats / premises
work-in-progress70% done
70% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress70% done
70% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress70% done
70% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress80% done
80% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
L&T Seawoods Limited
for Project
L And T Seawoods Residences - North Towers
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation