Project overview

Kurla Kadam Scoiety Phase 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800006382. Kurla Kadam Scoiety Phase 1 is located at Mumbai Suburban, 400024. This is a On-Going Project being developed by Pramod Pisal.

Kurla Kadam Scoiety Phase 1 has REHAB Apartments with carpet areas ranging from 0 to 0 Sq.ft. Carpet. The Project has total 176 of which 10 are currently available for sale.

Kurla Kadam Scoiety Phase 1 is being developed on a total land area of 81254 Sq.ft. out of which 6500 Sq.ft. i.e 8% is reserved for recreational purposes. Kurla Kadam Scoiety Phase 1 has 4 Wings / Towers M M Residency,Rehab Building 2,Rehab Building 3,Rehab Building No 1

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Kurla Kadam Scoiety Phase 1
  • Location:
  • Mumbai Suburban, 400024
  • Const. Stage:
    On-Going Project
  • Possession:
    30 Jun 2021
Developer Details

  • Developer:
    Pramod Pisal
  • Phone:
  • Address:
  • 1St Floor, M Residency, S.G. Barve Marg, Opp. Kurla Railway Station, Kurla East, Kurla Kadam Chs. Ltd. Jagruti Nagar, 400024
Project RERA Details
MAHA REARA No: P51800006382
Project Type Others
RERA Project Status On-Going Project
Funding Bank ICICI Bank
Proposed Possession 30 Jun 2021
Revised Possession 30 Jun 2022
Extended Possession 31 Dec 2024
Litigations Yes
Last Modified 15 Feb 2024
Last Retrived 28 Jul 2025
Kurla Kadam Scoiety Phase 1 QR Code
Kurla Kadam Scoiety Phase 1
MahaRERA - P51800006382
Apartment Details & Configuration
TypeArea
1 BHK38.83 Sq.mts. ( 418 Sq.ft. )
1 BHK40.04 Sq.mts. ( 431 Sq.ft. )
1 BHK48.03 Sq.mts. ( 517 Sq.ft. )
1 BHK49.52 Sq.mts. ( 533 Sq.ft. )
2 BHK57.32 Sq.mts. ( 617 Sq.ft. )
2 BHK74.79 Sq.mts. ( 805 Sq.ft. )
3 BHK90.12 Sq.mts. ( 970 Sq.ft. )
SLUMREHAB0 Sq.mts. ( 0 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Kurla Kadam Scoiety Phase 1last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Community Buildings
Na
Landscaping & Tree Planting
Not Yet Started
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Done
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Supply80% completed
80% Complete
In Process
Water Conservation, Rain water Harvesting
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Done
Open Parking
Na
Fire Protection And Fire Safety Requirements
Pending
Energy management
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Done
Aggregate area of recreational Open Space
Pending
Buildings / Wings in Kurla Kadam Scoiety Phase 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Kurla Kadam Scoiety Phase 1 by Pramod Pisallast updated on 28 Jul 2025 as per information obtained from MARA RERA.

81254 Sq. ft.

Project Area

6500 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

176 apartments in total
Total
176
Booked
166
Available
10

Saleable Area Statistics (Sq. ft.)

87915 Total
Total
87915
Booked
81231
Available
6684
Total 176 apartments in project. 166 apartments booked. 94% apartments booked.
Total 87915 Sq.ft. saleable area. 81231 saleable area booked.
92% area booked.

M M Residency

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
M M ResidencyJun 2021151011052
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.83 Sq.mts. ( 418 Sq.ft. )56
56 Booked100% Booked
100% Booked
1 BHK40.04 Sq.mts. ( 431 Sq.ft. )54
54 Booked100% Booked
100% Booked
1 BHK48.03 Sq.mts. ( 517 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK49.52 Sq.mts. ( 533 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK57.32 Sq.mts. ( 617 Sq.ft. )56
56 Booked100% Booked
100% Booked
2 BHK74.79 Sq.mts. ( 805 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK90.12 Sq.mts. ( 970 Sq.ft. )2
None Booked0% Booked
0% Booked
176 total apartments / 166 apartments booked. 94% apartments booked.
Work Description in Building M M ResidencyCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress88% done
88% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress80% done
80% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Rehab Building 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rehab Building 2Jun 202313100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
SLUMREHAB0 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Rehab Building 2Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Rehab Building 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rehab Building 3Jun 202317110000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
SLUM REHAB0 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Rehab Building 3Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Rehab Building No 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rehab Building No 1Jun 20238100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
REHAB0 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Rehab Building No 1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Pramod Pisal
for Project
Kurla Kadam Scoiety Phase 1
last updated on 28 Jul 2025 as per information obtained from MARA RERA.