Project overview

Krypton Terraces is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900009619. Krypton Terraces is located at C S No. 1576, F.P No 1029 Of Tps Iv. This is a Ongoing being developed by Krypton Construction & Developers.

Krypton Terraces has 3 BHK, 4 BHK & 4 BHK DUPLEX Apartments with carpet areas ranging from 1085 to 863 Sq.ft. Carpet. The Project has total 24 of which 0 are currently available for sale.

Krypton Terraces is being developed on a total land area of 21438 Sq.ft. Krypton Terraces has 2 Wings / Towers Wing B,Wing C

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Krypton Terraces
  • Location:
  • C S No. 1576, F.P No 1029 Of Tps Iv
  • Const. Stage:
    Ongoing
  • Possession:
    31 Jan 2020
Developer Details

  • Developer:
    Krypton Construction & Developers
  • Phone:
  • Address:
  • Commerce House
Project RERA Details
MAHA REARA No: P51900009619
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect B R Gandhi & Associates
Funding Bank
Proposed Possession 31 Jan 2020
Revised Possession 31 Jan 2020
Extended Possession 30 Jan 2023
Litigations No Litigations
Last Modified 09 Sep 2021
Last Retrived 26 Jul 2025
Krypton Terraces QR Code
Krypton Terraces
MahaRERA - P51900009619
Apartment Details & Configuration
TypeArea
2.5 BHK57.38 Sq.mts. ( 618 Sq.ft. )
2.5 BHK59.07 Sq.mts. ( 636 Sq.ft. )
2.5 BHK59.52 Sq.mts. ( 641 Sq.ft. )
3 BHK80.19 Sq.mts. ( 863 Sq.ft. )
4 BHK100.83 Sq.mts. ( 1085 Sq.ft. )
4 BHK DUPLEX126.73 Sq.mts. ( 1364 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Krypton Terraceslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed
Landscaping & Tree Planting100% completed
95% Complete
Completed
Open Parking100% completed
95% Complete
Completed
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal100% completed
95% Complete
Completed
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Completed
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply
Work Not Started
Buildings / Wings in Krypton Terraces
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Krypton Terraces by Krypton Construction & Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

21438 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

24 apartments in total
Total
24
Booked
24
Available
0

Saleable Area Statistics (Sq. ft.)

23025 Total
Total
23025
Booked
23025
Available
0
Total 24 apartments in project. 24 apartments booked. 100% apartments booked.
Total 23025 Sq.ft. saleable area. 23025 saleable area booked.
100% area booked.

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BJan 2020111010012
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2.5 BHK57.38 Sq.mts. ( 618 Sq.ft. )1
1 Booked100% Booked
100% Booked
2.5 BHK59.07 Sq.mts. ( 636 Sq.ft. )1
1 Booked100% Booked
100% Booked
2.5 BHK59.52 Sq.mts. ( 641 Sq.ft. )5
5 Booked100% Booked
100% Booked
7 total apartments / 7 apartments booked. 100% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CJan 1900311015347
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK80.19 Sq.mts. ( 863 Sq.ft. )7
7 Booked100% Booked
100% Booked
4 BHK100.83 Sq.mts. ( 1085 Sq.ft. )4
4 Booked100% Booked
100% Booked
4 BHK DUPLEX126.73 Sq.mts. ( 1364 Sq.ft. )6
6 Booked100% Booked
100% Booked
17 total apartments / 17 apartments booked. 100% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Krypton Construction & Developers
for Project
Krypton Terraces
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation