Project overview

Krishna Prestige is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700011183. Krishna Prestige is located at 1391. This is a Ongoing being developed by M/S. Arun Bhoomi Corporation.

Krishna Prestige has 1 BHK, OFFICE & SHOP Apartments with carpet areas ranging from 2573 to 33340 Sq.ft. Carpet. The Project has total 265 of which 85 are currently available for sale.

Krishna Prestige is being developed on a total land area of 68674 Sq.ft. out of which 11550 Sq.ft. i.e 17% is reserved for recreational purposes. Krishna Prestige has 2 Wings / Towers Krishna Prestige Abc,Krishna Prestige De

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Krishna Prestige
  • Location:
  • 1391
  • Const. Stage:
    Ongoing
  • Possession:
    29 Dec 2022
Developer Details

  • Developer:
    M/S. Arun Bhoomi Corporation
  • Phone:
  • Address:
  • Krishna Prestige
Project RERA Details
MAHA REARA No: P51700011183
Project Type Others
RERA Project Status Ongoing
Architect Tejs Architects And Consultants
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 29 Dec 2022
Revised Possession 29 Dec 2022
Extended Possession 30 Jun 2025
Litigations No Litigations
Last Modified 03 Jul 2025
Last Retrived 26 Jul 2025
Krishna Prestige QR Code
Krishna Prestige
MahaRERA - P51700011183
Apartment Details & Configuration
TypeArea
2 BHK4908.41 Sq.mts. ( 52834 Sq.ft. )
3 BHK1800.37 Sq.mts. ( 19379 Sq.ft. )
OFFICE372.76 Sq.mts. ( 4012 Sq.ft. )
1 BHK3097.38 Sq.mts. ( 33340 Sq.ft. )
OFFICE239 Sq.mts. ( 2573 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Krishna Prestigelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
---
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
---
Energy management
---
Fire Protection And Fire Safety Requirements
---
HEALTH CLUB
---
Landscaping & Tree Planting
---
Open Parking
---
Sewerage (Chamber, Lines, Septic Tank , STP)15% completed
15% Complete
Front Side Of Building
Solid Waste Management And Disposal
Na
Storm Water Drains
---
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
---
Water Supply
Water Supply By Mbmc After O.C
Buildings / Wings in Krishna Prestige
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Krishna Prestige by M/S. Arun Bhoomi Corporationlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

68674 Sq. ft.

Project Area

11550 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

265 apartments in total
Total
265
Booked
180
Available
85

Saleable Area Statistics (Sq. ft.)

8451890 Total
Total
8451890
Booked
5209811
Available
3242079
Total 265 apartments in project. 180 apartments booked. 67% apartments booked.
Total 8451890 Sq.ft. saleable area. 5209811 saleable area booked.
62% area booked.

Krishna Prestige Abc

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Krishna Prestige AbcJan 1900141011301
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK4908.41 Sq.mts. ( 52834 Sq.ft. )91
48 Booked52% Booked
52% Booked
3 BHK1800.37 Sq.mts. ( 19379 Sq.ft. )26
12 Booked46% Booked
46% Booked
OFFICE372.76 Sq.mts. ( 4012 Sq.ft. )18
18 Booked100% Booked
100% Booked
SHOPS372.76 Sq.mts. ( 4012 Sq.ft. )18
10 Booked55% Booked
55% Booked
153 total apartments / 88 apartments booked. 57% apartments booked.
Work Description in Building Krishna Prestige AbcCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress25% done
25% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress35% done
35% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress35% done
35% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress62% done
62% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress45% done
45% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress45% done
45% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress25% done
25% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress62% done
62% Booked

Krishna Prestige De

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Krishna Prestige DeDec 2023121011151
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK3097.38 Sq.mts. ( 33340 Sq.ft. )88
68 Booked77% Booked
77% Booked
OFFICE239 Sq.mts. ( 2573 Sq.ft. )12
12 Booked100% Booked
100% Booked
SHOP239 Sq.mts. ( 2573 Sq.ft. )12
12 Booked100% Booked
100% Booked
112 total apartments / 92 apartments booked. 82% apartments booked.
Work Description in Building Krishna Prestige DeCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress25% done
25% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress25% done
25% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress50% done
50% Booked
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress65% done
65% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress65% done
65% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
M/S. Arun Bhoomi Corporation
for Project
Krishna Prestige
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation