Project overview

Krishna Nisarga is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700006472. Krishna Nisarga is located at 53/2. This is a Ongoing being developed by Gopal Krishna Developers.

Krishna Nisarga has 1 BHK & 1RK Apartments with carpet areas ranging from 238 to 365 Sq.ft. Carpet. The Project has total 278 of which 4 are currently available for sale.

Krishna Nisarga is being developed on a total land area of 46285 Sq.ft. out of which 1076 Sq.ft. i.e 2% is reserved for recreational purposes. Krishna Nisarga has 3 Wings / Towers A Wing,C Wing,Wing B

ProjectDeveloperLocationPossession
Saket WorldAnand Associates15, 166A, 585A31-12-2026 00:00:00
Yashwant Heights Phase IiRai Residency Private LimitedSurvey No 6 Hissa No 7 To 9 31-05-2023 00:00:00
Krishna AnandGopal Krishna Developers44/131-05-2025 00:00:00
Lakeview Co Operative Housing LimitedGp InfraSurvey No. 42, Hissa No. 2/A12-01-2026 00:00:00
Barku HeightShree Datta DevelopersS No 33, H No 431-12-2026 00:00:00
Sai Vikrant HeightsVikrant ConstructionS No.51/A/12/21 And S No.51/A/12/1831-12-2026 00:00:00
Krishna VanshChaitanya DevelopersSurvey No 44 Hissa No 131-12-2028 00:00:00
Ahmahf EmpireEmpire ResidencySurvey No.9, Hissa No.131-12-2027 00:00:00
Saket World Building Type CAnand Associates17/2/A/130-06-2027 00:00:00
SkylonBhagwati Space ConventureNetivali31-12-2022 00:00:00
Sahajeevan Residency Bldg 2, C-WingPappu Developers & Group4302A, 4302B, 4302/1 A30-06-2019 00:00:00
Shankar Complex IiJarimari Residency80 Hissa 431-12-2019 00:00:00
Matoshri HeightsSujal DevelopersSurvey No. 58, Hissa No 430-06-2021 00:00:00
Eknath EnclaveGaurivinayak Builders And Developers Pvt LtdThane, 42130631-12-2019 00:00:00
Ambika HeightsRajesh Mavji Chheda31/21/2/230-06-2024 00:00:00
Eknath Enclave Building No 2Gaurivinayak Builders And Developers Pvt LtdThane, 421306, Kalyan E31-12-2023 00:00:00
Shubham Paradise E WingGaurivinayak Builders And Developers Pvt LtdKalyan31-12-2023 00:00:00
Yashwant ResidencyShree Sai Ganesh EnterprisesSurvey No. 60 Hissa No. 5, 6 And 831-12-2018 00:00:00
Waman HeightsLaxmi DevelopersCts 4263 To 427630-07-2021 00:00:00
Yashodarshan ResidencyVivaan Enterprises34130-12-2022 00:00:00
Kurm CasaRajesh Ganpati JadhavSurvey No. 3131-12-2026 00:00:00
Dinkar EliteEkdant EnterprisesS No 7 H No 2 And S No 16 H No 331-12-2028 00:00:00
AshtamiRai Residency Private LimitedSurvey No 30 Hissa No 48,49,5331-12-2027 00:00:00
Vaishnavi EnclaveJayaram Pandurang GaikwadSurvey No 30 Hissa No 19B30-03-2023 00:00:00
Krishna NisargaGopal Krishna Developers53/230-05-2023 00:00:00
Krishna EnclaveOm Sai Developers22/3/2 530-04-2019 00:00:00
Sudama EnclaveRai Residency Private LimitedSurvey No 63 Hissa No 330-06-2018 00:00:00
Aishwarya HeightsGaurivinayak Builders And Developers Pvt LtdSurvey 40/5 34/930-09-2018 00:00:00
Lok Mangal SrushtiBalaram Gopal GawliSurvey No 60 Hissa No 5, Survey No 61 Hissa No 7,830-06-2021 00:00:00
Tulip HeightsOm Sai DevelopersPisavali30-06-2027 00:00:00
Empire City Building No. 1Empire DevelopersSurvey No-36/5/A & Survey No-36/5/B31-12-2025 00:00:00
Imperial HeightsGp InfraSurvey No- 29, Hissa No- 17E, Cts No- 765531-12-2026 00:00:00
Balaji Aangan Shivam - C WingShree Sai Balaji EnterprisesNew S No 90 Hissano 2 Olds No128/231-12-2019 00:00:00
Krishna DarshanS.K. Developers30/19C31-03-2019 00:00:00
Yashwant Heights C WingRai Residency Private LimitedSurvey No 6 Hissa No 7 8 9 And Survey No 7 Hissa 9 10 13 131-03-2018 00:00:00
Project Details
  • Project:
    Krishna Nisarga
  • Location:
  • 53/2
  • Const. Stage:
    Ongoing
  • Possession:
    30 May 2023
Developer Details

  • Developer:
    Gopal Krishna Developers
  • Phone:
  • Address:
  • Radhe Krishna Park
Project RERA Details
MAHA REARA No: P51700006472
Project Type Others
RERA Project Status Ongoing
Architect Dilip Tambday And Associates
Funding Bank ICICI BANK LIMITED
Proposed Possession 30 May 2023
Revised Possession 30 May 2023
Extended Possession
Litigations No Litigations
Last Modified 14 Aug 2017
Last Retrived 26 Jul 2025
Krishna Nisarga QR Code
Krishna Nisarga
MahaRERA - P51700006472
Apartment Details & Configuration
TypeArea
1 BHK35.13 Sq.mts. ( 378 Sq.ft. )
1 BHK35.8 Sq.mts. ( 385 Sq.ft. )
1 BHK36.41 Sq.mts. ( 392 Sq.ft. )
1 BHK36.8 Sq.mts. ( 396 Sq.ft. )
1 BHK38 Sq.mts. ( 409 Sq.ft. )
1 BHK39.24 Sq.mts. ( 422 Sq.ft. )
2 BHK49.47 Sq.mts. ( 532 Sq.ft. )
1 BHK35.46 Sq.mts. ( 382 Sq.ft. )
1 BHK36.44 Sq.mts. ( 392 Sq.ft. )
1 BHK36.91 Sq.mts. ( 397 Sq.ft. )
1 BHK36.95 Sq.mts. ( 398 Sq.ft. )
1 BHK36.96 Sq.mts. ( 398 Sq.ft. )
1 BHK36.99 Sq.mts. ( 398 Sq.ft. )
1 BHK41.5 Sq.mts. ( 447 Sq.ft. )
1 BHK21.04 Sq.mts. ( 226 Sq.ft. )
2 BHK48.85 Sq.mts. ( 526 Sq.ft. )
2 BHK52.56 Sq.mts. ( 566 Sq.ft. )
SHOP22.46 Sq.mts. ( 242 Sq.ft. )
SHOP22.87 Sq.mts. ( 246 Sq.ft. )
Shop9.17 Sq.mts. ( 99 Sq.ft. )
Shop10.99 Sq.mts. ( 118 Sq.ft. )
SHOP11.3 Sq.mts. ( 122 Sq.ft. )
SHOP12.73 Sq.mts. ( 137 Sq.ft. )
SHOP13.06 Sq.mts. ( 141 Sq.ft. )
SHOP13.15 Sq.mts. ( 142 Sq.ft. )
SHOP15.71 Sq.mts. ( 169 Sq.ft. )
SHOP15.72 Sq.mts. ( 169 Sq.ft. )
SHOP17.45 Sq.mts. ( 188 Sq.ft. )
SHOP17.48 Sq.mts. ( 188 Sq.ft. )
SHOP17.49 Sq.mts. ( 188 Sq.ft. )
SHOP20.01 Sq.mts. ( 215 Sq.ft. )
SHOP20.22 Sq.mts. ( 218 Sq.ft. )
SHOP20.38 Sq.mts. ( 219 Sq.ft. )
SHOP20.79 Sq.mts. ( 224 Sq.ft. )
1 BHK33.56 Sq.mts. ( 361 Sq.ft. )
1 BHK33.68 Sq.mts. ( 363 Sq.ft. )
1 BHK33.88 Sq.mts. ( 365 Sq.ft. )
1RK22.15 Sq.mts. ( 238 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Krishna Nisargalast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Chiildrens' Play Area
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Meter Room Only
Energy management100% completed
95% Complete
Solar Water Heater
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Kdmc Approval
Landscaping & Tree Planting100% completed
95% Complete
As Per Kdmc Approval
Open Parking100% completed
95% Complete
36 Nos
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Chmabers And Septic Plan
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
As Per Kdmc Approval
Street Lighting100% completed
95% Complete
As Per Kdmc Approval
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
As Per Kdmc Approval
Water Supply100% completed
95% Complete
From Kdmc After Oc
Buildings / Wings in Krishna Nisarga
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Krishna Nisarga by Gopal Krishna Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

46285 Sq. ft.

Project Area

1076 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

278 apartments in total
Total
278
Booked
274
Available
4

Saleable Area Statistics (Sq. ft.)

111408 Total
Total
111408
Booked
110388
Available
1020
Total 278 apartments in project. 274 apartments booked. 98% apartments booked.
Total 111408 Sq.ft. saleable area. 110388 saleable area booked.
99% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingMay 2022171010026
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.13 Sq.mts. ( 378 Sq.ft. )16
16 Booked100% Booked
100% Booked
1 BHK35.8 Sq.mts. ( 385 Sq.ft. )12
12 Booked100% Booked
100% Booked
1 BHK36.41 Sq.mts. ( 392 Sq.ft. )16
16 Booked100% Booked
100% Booked
1 BHK36.8 Sq.mts. ( 396 Sq.ft. )16
16 Booked100% Booked
100% Booked
1 BHK38 Sq.mts. ( 409 Sq.ft. )16
16 Booked100% Booked
100% Booked
1 BHK39.24 Sq.mts. ( 422 Sq.ft. )16
16 Booked100% Booked
100% Booked
2 BHK49.47 Sq.mts. ( 532 Sq.ft. )16
16 Booked100% Booked
100% Booked
108 total apartments / 108 apartments booked. 100% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingMay 2022231010013
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.46 Sq.mts. ( 382 Sq.ft. )21
21 Booked100% Booked
100% Booked
1 BHK36.44 Sq.mts. ( 392 Sq.ft. )9
9 Booked100% Booked
100% Booked
1 BHK36.91 Sq.mts. ( 397 Sq.ft. )10
10 Booked100% Booked
100% Booked
1 BHK36.95 Sq.mts. ( 398 Sq.ft. )19
18 Booked94% Booked
94% Booked
1 BHK36.96 Sq.mts. ( 398 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK36.99 Sq.mts. ( 398 Sq.ft. )18
18 Booked100% Booked
100% Booked
1 BHK41.5 Sq.mts. ( 447 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK21.04 Sq.mts. ( 226 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK48.85 Sq.mts. ( 526 Sq.ft. )19
19 Booked100% Booked
100% Booked
2 BHK52.56 Sq.mts. ( 566 Sq.ft. )20
20 Booked100% Booked
100% Booked
SHOP22.46 Sq.mts. ( 242 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP22.87 Sq.mts. ( 246 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop9.17 Sq.mts. ( 99 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop10.99 Sq.mts. ( 118 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP11.3 Sq.mts. ( 122 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP12.73 Sq.mts. ( 137 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP13.06 Sq.mts. ( 141 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP13.15 Sq.mts. ( 142 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP15.71 Sq.mts. ( 169 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP15.72 Sq.mts. ( 169 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP17.45 Sq.mts. ( 188 Sq.ft. )2
1 Booked50% Booked
50% Booked
SHOP17.48 Sq.mts. ( 188 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP17.49 Sq.mts. ( 188 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP20.01 Sq.mts. ( 215 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP20.22 Sq.mts. ( 218 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP20.38 Sq.mts. ( 219 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP20.79 Sq.mts. ( 224 Sq.ft. )1
1 Booked100% Booked
100% Booked
142 total apartments / 138 apartments booked. 97% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BMay 202281010011
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.56 Sq.mts. ( 361 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK33.68 Sq.mts. ( 363 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK33.88 Sq.mts. ( 365 Sq.ft. )7
7 Booked100% Booked
100% Booked
1RK22.15 Sq.mts. ( 238 Sq.ft. )7
7 Booked100% Booked
100% Booked
28 total apartments / 28 apartments booked. 100% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Gopal Krishna Developers
for Project
Krishna Nisarga
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation