Project overview

Krishna Kunj Phase 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800033187. Krishna Kunj Phase 1 is located at 461, 463. This is a New being developed by Prince Housing And Hospitality Private Limited.

Krishna Kunj Phase 1 has 1 BHK, 2 BHK & DORMETORY Apartments with carpet areas ranging from 1834 to 716 Sq.ft. Carpet. The Project has total 36 of which 26 are currently available for sale.

Krishna Kunj Phase 1 is being developed on a total land area of 16112 Sq.ft. Krishna Kunj Phase 1 has 2 Wings / Towers Krishna Kunj Phase 1 Wing A,Krishna Kunj Phase 1 Wing B

ProjectDeveloperLocationPossession
Dipti Sky City Phase 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
Snehal Paradise Wing AM/S Krishna DevelopersS No 2A H No 2B31-01-2020 00:00:00
Shree RajRajententerprisesSr No 39 H No 530-04-2019 00:00:00
Mohankheda GreensRajeshkumar Moolchand RupawatSurvey No 38 Hissa No 330-12-2023 00:00:00
Ozone GalaxyHallmark Infra Realty Llp64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
Shubham Galaxy - B WingNavkar Associates4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
Shafique Khatimiti TowerRameez Shahnawaz MajeedCts 126430-12-2021 00:00:00
ElementsUma RealtyC. S. No. 27/130-12-2023 00:00:00
Shree Siddhivinayak Park Wing A1 And A2Satyashiv DevelopersS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
PadmanabhYash Govinda Build Infra LlpTika No.10, C.T.S No.222B24-10-2023 00:00:00
Orchid A To LPalava Dwellers Pvt Ltd27Pt And 139/2 Pt30-06-2018 00:00:00
Tanisha HeightsM/S. Balaji DevelopersCts No. 1962-197230-03-2023 00:00:00
Master BuildconMaster BuildconGut No 27 Plot No 1630-03-2022 00:00:00
Sai Tirth Phase IPinnacle CorporationS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KasturiJ.K.InfraS R No 130 Hissa No 330-12-2024 00:00:00
Sai PurabWestern Arch Developers9/1/230-09-2023 00:00:00
Akshar EvannaM/S Akshar Om ConstructionPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B And B1Rassaz Infrastructure Private Limited369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
Swami Samarth ApartmentMhatre Developers1231A30-03-2023 00:00:00
Yashoghar ChsBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
Vishwajeet Precious Phase IAbhijeet PrideSurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
Vimal ShreeRitesh Ramesh JainOld Sno 215 Hno 1 New Sno 198 Hno 130-12-2023 00:00:00
Sai PalacePravin Narasi Manani3630-06-2022 00:00:00
Saishiv ComplexSaishiv ConstructionSurvey No 54 By 3 Hissa No 1 And 230-12-2023 00:00:00
Mhatre CompoundLodha Developers Limited85/2 Pt30-06-2018 00:00:00
Aastha River ViewAastha Buildcon3 And 4 / Sec 1830-12-2022 00:00:00
Patels Prayosha - Pramukh SadanSahajanand DevelopersSurvey No 39A Hissa No 1A And 1B30-12-2023 00:00:00
Regency Park Iii Building No 2Johar Hasan ZojwallaCts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
Seasons SaharaSamarth Sai Builders & DevelopersS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
IndrayaniM/S Vedant Chetana Enterprises NxS No.380, Cts No 133230-12-2023 00:00:00
Navare PlazaOm Developers8028 8029 803028-08-2022 00:00:00
Sai HeritageMitra HomesSurvey No 59 Hissa No 1 B30-03-2023 00:00:00
Shree Girijatmak Co Op Hou Soc LtdShree Saraswati DevelopersOld Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/730-12-2021 00:00:00
HarmonyBuildman Construction225/831-12-2019 00:00:00
N G Valencia Phase IiRna Builders (Ng)S No 335/3 Part Old 338/10 New30-09-2020 00:00:00
VandanamMetro BuildconSurvey No 68Plot No 28 Hissa No 1P 3P 4P30-12-2021 00:00:00
TiaraSagar EnterpriseS No 20 And Chalta No 2430-03-2024 00:00:00
Metro Aangan Phase - IMetro CreatorsS No 78 H No 7 P And 8 P30-12-2028 00:00:00
Prakruti SparshAvishkar BuildconS No 49, H No 10D30-12-2022 00:00:00
Sheth SupremeSheth Builders Private LimitedOld Survey No 159 Pt And New Survey No 20 Pt30-12-2024 00:00:00
One AksharAkshar RealtorsPlot No 730-12-2026 00:00:00
Vedant KalashShivalik DevelopersSurvey No 48 Hissa No 2 Plot No 5 And 630-03-2022 00:00:00
Shreeram ResidencyRaghunath Kedari Phadtare690/330-12-2025 00:00:00
Jagjeet EnclaveJagjeet Shrusti Realtors29/1/C04-05-2024 00:00:00
Zunera Heights786 Micron Builders & Developers101/ 2 3 4 5 1230-12-2022 00:00:00
Krishna GalaxyKrishna Builders & DevelopersSurvey No 42 Hissa No 230-06-2023 00:00:00
Villa SmaranOm Villa Buildtech LlpCts No 1194E And Cts No 1194A Sector 2930-03-2024 00:00:00
Virat MansionNeelyog DevelopersCts No 9907,9908 To 991330-12-2022 00:00:00
Bhakti ParkShivkrupa Enterprises730-03-2023 00:00:00
Priti ApartmentMahesh Mahadu Tare579 To 583 , 604 A And B30-12-2022 00:00:00
Raj Regalia Phase-1AAmrut Laxmi DevelopersS No. 54/3/E, 55/2, 55/330-06-2023 00:00:00
Anantam HeightsKanak RealtyS.No.101, C.T.S No.328030-06-2024 00:00:00
Capmatrix SquareCapmatrix Buildcon LlpB-33, 33 Part15-12-2022 00:00:00
Lodha Panacea IiMacrotech Developers Limited240/5A Pt30-09-2023 00:00:00
Sadguru Nakshtra Phase ISadguru DevelopersSurvey No 1204A And Survey No 118330-12-2023 00:00:00
Banjara Hills Sector 7Seema Developers127, 408/1, 407/230-12-2022 00:00:00
Lodha Panacea IMacrotech Developers Limited55Pt31-12-2021 00:00:00
Building No 1 PadmavatiM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2022 00:00:00
Swanand TarangM/S Omkar RealtorsSurvey No 43 Hissa No 230-12-2021 00:00:00
Building No 2 Mahalakshmi A WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Jhalak Luxuria Phase IJhalak ConstructionsGut No 48 P Plot C, Cts No. 9353 P30-12-2021 00:00:00
Lodha Quality Home Tower 4Macrotech Developers Limited32/10P, 32/15P, 32/14P30-09-2024 00:00:00
Vishwajeet Pink CityGulabrao Baburao Karanjule PatilGut No.48, Plot No.15,19,23,24,25,26,27 And 3730-05-2025 00:00:00
Spm Lake City Phase Ii Part 1Kothari & Deshmukh Landmark LlpSurvey No 56 Hissa No 230-01-2026 00:00:00
Anantam - Phase IOyster Living Llp13/230-06-2022 00:00:00
Building No 2 Mahalakshmi B WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Amruta ChsUtkarsha Construction7462/70/2403-06-2022 00:00:00
Sai Shrushti SapphireSai Shrushti Enterprises136/1 P Sub Plot D30-12-2021 00:00:00
Umiya OasisUmiya Developers29 Hissa No 1 Survey No 30 Hissa 1,2,3A30-12-2029 00:00:00
Shreeman Residency B And C WingOm EnterprisesSurvey No 1 Hissa No 14/2, 14/1/230-12-2029 00:00:00
ValenciaImpressionsC T S No 2065 To 2068, 1465 And 146630-06-2024 00:00:00
Silver Creast Wing -A Phase - IiShrikrishna EnterprisesS No 83 H No 1430-03-2026 00:00:00
Arjun VillaManohar Sahebrao Kadam192-J230-03-2022 00:00:00
Dosti Greater Thane - Phase 1Adrika Developers Private Limited9/4 Pt,7/8 Pt,7/1Pt, 11/25Pt,11/23Pt,12/19Pt,7/13Pt,11/17Pt,11/12Pt,11/13Pt,11/7Pt,11/1Pt,11/8Pt,11/18Pt,11/19A Pt,11/19B Pt,11/15Pt,11/16Pt,11/14Pt,11/11Pt,12/9Pt,11/21Pt01-04-2026 00:00:00
Om Tanishq ResidencyM/S Laxmi RealtySurvey No 4, Hissa No 1A/230-03-2022 00:00:00
Amakin Mohammediyah Phase 3Amakin Mohammediyah Private Limited31/6 And 730-12-2024 00:00:00
Anantam - Phase IiOyster Living Llp18/1230-06-2022 00:00:00
Riverview Classic Building No 4, Phase IvRutu BuildersS No 27, H No 5, 3/3 S No 28/ H. No 1,2,3,4/1,4/2,4/330-12-2022 00:00:00
Olivia PrimeSkyline Buildpro43/2B/3/230-06-2022 00:00:00
Rai S AaragyaRai Residency Private LimitedSurvey No 46 Hissa No 5 And 730-12-2026 00:00:00
Project Details
  • Project:
    Krishna Kunj Phase 1
  • Location:
  • 461, 463
  • Const. Stage:
    New
  • Possession:
    31 Jan 2025
Developer Details

  • Developer:
    Prince Housing And Hospitality Private Limited
  • Phone:
  • Address:
  • Jawahar Nagar
Project RERA Details
MAHA REARA No: P51800033187
Project Type Others
RERA Project Status New
Architect Sanjay B Shah
Funding Bank STATE BANK OF INDIA
Proposed Possession 31 Jan 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 14 Aug 2024
Last Retrived 26 Jul 2025
Krishna Kunj Phase 1 QR Code
Krishna Kunj Phase 1
MahaRERA - P51800033187
Apartment Details & Configuration
TypeArea
1 BHK31.12 Sq.mts. ( 335 Sq.ft. )
1 BHK33.04 Sq.mts. ( 356 Sq.ft. )
1 BHK37.25 Sq.mts. ( 401 Sq.ft. )
2 BHK44.5 Sq.mts. ( 479 Sq.ft. )
2 BHK60.2 Sq.mts. ( 648 Sq.ft. )
IT OFFICE95.13 Sq.mts. ( 1024 Sq.ft. )
IT OFFICE25.64 Sq.mts. ( 276 Sq.ft. )
IT OFFICE56.58 Sq.mts. ( 609 Sq.ft. )
PRAYER HALL26.38 Sq.mts. ( 284 Sq.ft. )
Shop45.71 Sq.mts. ( 492 Sq.ft. )
Shop43.36 Sq.mts. ( 467 Sq.ft. )
1 BHK35.49 Sq.mts. ( 382 Sq.ft. )
1 BHK44.69 Sq.mts. ( 481 Sq.ft. )
2 BHK59.83 Sq.mts. ( 644 Sq.ft. )
2 BHK66.52 Sq.mts. ( 716 Sq.ft. )
DORMETORY170.38 Sq.mts. ( 1834 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Krishna Kunj Phase 1last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Wip
Electrical Meter Room, Sub-Station, Receiving Station
Wip
Energy management
Wip
Fire Protection And Fire Safety Requirements
Wip
Landscaping & Tree Planting
Wip
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Wip
Solid Waste Management And Disposal
Wip
Storm Water Drains
Wip
Street Lighting
Wip
Treatment And Disposal Of Sewage And Sullage Water
Wip
Water Conservation, Rain water Harvesting
Wip
Water Supply
Wip
Buildings / Wings in Krishna Kunj Phase 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Krishna Kunj Phase 1 by Prince Housing And Hospitality Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

16112 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

36 apartments in total
Total
36
Booked
10
Available
26

Saleable Area Statistics (Sq. ft.)

20037 Total
Total
20037
Booked
6172
Available
13865
Total 36 apartments in project. 10 apartments booked. 27% apartments booked.
Total 20037 Sq.ft. saleable area. 6172 saleable area booked.
31% area booked.

Krishna Kunj Phase 1 Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Krishna Kunj Phase 1 Wing AJan 202515100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.12 Sq.mts. ( 335 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK33.04 Sq.mts. ( 356 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK37.25 Sq.mts. ( 401 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK44.5 Sq.mts. ( 479 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK60.2 Sq.mts. ( 648 Sq.ft. )1
None Booked0% Booked
0% Booked
IT OFFICE95.13 Sq.mts. ( 1024 Sq.ft. )1
None Booked0% Booked
0% Booked
IT OFFICE25.64 Sq.mts. ( 276 Sq.ft. )2
1 Booked50% Booked
50% Booked
IT OFFICE37.25 Sq.mts. ( 401 Sq.ft. )1
1 Booked100% Booked
100% Booked
IT OFFICE56.58 Sq.mts. ( 609 Sq.ft. )1
1 Booked100% Booked
100% Booked
PRAYER HALL26.38 Sq.mts. ( 284 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop45.71 Sq.mts. ( 492 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop43.36 Sq.mts. ( 467 Sq.ft. )1
None Booked0% Booked
0% Booked
17 total apartments / 4 apartments booked. 23% apartments booked.
Work Description in Building Krishna Kunj Phase 1 Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress30% done
30% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress55% done
55% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress40% done
40% Booked
Stilt Floor
Completed 100% done
100% Booked

Krishna Kunj Phase 1 Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Krishna Kunj Phase 1 Wing BJan 20257101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.49 Sq.mts. ( 382 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK44.69 Sq.mts. ( 481 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK59.83 Sq.mts. ( 644 Sq.ft. )12
3 Booked25% Booked
25% Booked
2 BHK66.52 Sq.mts. ( 716 Sq.ft. )1
None Booked0% Booked
0% Booked
DORMETORY170.38 Sq.mts. ( 1834 Sq.ft. )1
1 Booked100% Booked
100% Booked
19 total apartments / 6 apartments booked. 31% apartments booked.
Work Description in Building Krishna Kunj Phase 1 Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress25% done
25% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress30% done
30% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Prince Housing And Hospitality Private Limited
for Project
Krishna Kunj Phase 1
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation