Project overview

Krishn Kunj Complex is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000005676. Krishn Kunj Complex is located at S No 49 H No 4. This is a Ongoing being developed by Karma Construction Co.

Krishn Kunj Complex has 1 BHK Apartments with carpet areas ranging from 344 to 603 Sq.ft. Carpet. The Project has total 58 of which 9 are currently available for sale.

Krishn Kunj Complex is being developed on a total land area of 27105 Sq.ft. Krishn Kunj Complex has 2 Wings / Towers Bldg 1 Wing A, B And C,Bldg No 1 Wing D, E And F

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Krishn Kunj Complex
  • Location:
  • S No 49 H No 4
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2017
Developer Details

  • Developer:
    Karma Construction Co
  • Phone:
  • Address:
  • Ramavati Apt
Project RERA Details
MAHA REARA No: P99000005676
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Ajay Wade And Associates
Funding Bank RBL Bank Limited
Proposed Possession 31 Dec 2017
Revised Possession 31 Dec 2017
Extended Possession
Litigations No Litigations
Last Modified 11 Aug 2017
Last Retrived 28 Jul 2025
Krishn Kunj Complex QR Code
Krishn Kunj Complex
MahaRERA - P99000005676
Apartment Details & Configuration
TypeArea
1 BHK21.53 Sq.mts. ( 232 Sq.ft. )
1 BHK31.12 Sq.mts. ( 335 Sq.ft. )
1 BHK31.3 Sq.mts. ( 337 Sq.ft. )
1 BHK32.23 Sq.mts. ( 347 Sq.ft. )
1 BHK39.85 Sq.mts. ( 429 Sq.ft. )
1 BHK32 Sq.mts. ( 344 Sq.ft. )
1 BHK35 Sq.mts. ( 377 Sq.ft. )
1 BHK39 Sq.mts. ( 420 Sq.ft. )
1 BHK53 Sq.mts. ( 570 Sq.ft. )
1 BHK56 Sq.mts. ( 603 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Krishn Kunj Complexlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting100% completed
95% Complete
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Septic Tank
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Na
Water Supply50% completed
50% Complete
Facility Will Start Once Water Supply Commence
Buildings / Wings in Krishn Kunj Complex
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Krishn Kunj Complex by Karma Construction Colast updated on 28 Jul 2025 as per information obtained from MARA RERA.

27105 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

58 apartments in total
Total
58
Booked
49
Available
9

Saleable Area Statistics (Sq. ft.)

21583 Total
Total
21583
Booked
17632
Available
3950
Total 58 apartments in project. 49 apartments booked. 84% apartments booked.
Total 21583 Sq.ft. saleable area. 17632 saleable area booked.
82% area booked.

Bldg 1 Wing A, B And C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg 1 Wing A, B And CJan 190047330000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK21.53 Sq.mts. ( 232 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK31.12 Sq.mts. ( 335 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK31.3 Sq.mts. ( 337 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK32.23 Sq.mts. ( 347 Sq.ft. )29
29 Booked100% Booked
100% Booked
1 BHK39.85 Sq.mts. ( 429 Sq.ft. )8
8 Booked100% Booked
100% Booked
44 total apartments / 44 apartments booked. 100% apartments booked.
Work Description in Building Bldg 1 Wing A, B And CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Bldg No 1 Wing D, E And F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 1 Wing D, E And FJan 190047330000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32 Sq.mts. ( 344 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK35 Sq.mts. ( 377 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK39 Sq.mts. ( 420 Sq.ft. )9
5 Booked55% Booked
55% Booked
1 BHK53 Sq.mts. ( 570 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK56 Sq.mts. ( 603 Sq.ft. )1
None Booked0% Booked
0% Booked
14 total apartments / 5 apartments booked. 35% apartments booked.
Work Description in Building Bldg No 1 Wing D, E And FCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Karma Construction Co
for Project
Krishn Kunj Complex
last updated on 28 Jul 2025 as per information obtained from MARA RERA.