Project overview

Kripa Vue is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800034034. Kripa Vue is located at F/1015. This is a New being developed by Kripa Oneness Private Limited.

Kripa Vue has 1RK, 2 BHK, 3 BHK, 4 BHK & Shop Apartments with carpet areas ranging from 1440 to 974 Sq.ft. Carpet. The Project has total 12 of which 0 are currently available for sale.

Kripa Vue is being developed on a total land area of 6028 Sq.ft. Kripa Vue has 1 Wings / Towers Kripa Vue

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Kripa Vue
  • Location:
  • F/1015
  • Const. Stage:
    New
  • Possession:
    30 Sep 2024
Developer Details

  • Developer:
    Kripa Oneness Private Limited
  • Phone:
  • Address:
  • 36/B
Project RERA Details
MAHA REARA No: P51800034034
Project Type Others
RERA Project Status New
Architect Toad Infrastructures Pvt Ltd
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 30 Sep 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 17 Mar 2022
Last Retrived 26 Jul 2025
Kripa Vue QR Code
Kripa Vue
MahaRERA - P51800034034
Apartment Details & Configuration
TypeArea
1RK9.58 Sq.mts. ( 103 Sq.ft. )
1RK19.21 Sq.mts. ( 207 Sq.ft. )
2 BHK72.58 Sq.mts. ( 781 Sq.ft. )
3 BHK90.53 Sq.mts. ( 974 Sq.ft. )
4 BHK133.74 Sq.mts. ( 1440 Sq.ft. )
4 BHK172.23 Sq.mts. ( 1854 Sq.ft. )
Shop154.21 Sq.mts. ( 1660 Sq.ft. )
Shop32.44 Sq.mts. ( 349 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Kripa Vuelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
As Per Mcgm
Electrical Meter Room, Sub-Station, Receiving Station
As Per Mcgm
Energy management
As Per Mcgm
Fire Protection And Fire Safety Requirements70% completed
70% Complete
As Per Mcgm
Landscaping & Tree Planting
As Per Mcgm
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Mcgm
Solid Waste Management And Disposal
As Per Mcgm
Storm Water Drains90% completed
90% Complete
As Per Mcgm
Street Lighting
As Per Mcgm
Treatment And Disposal Of Sewage And Sullage Water
As Per Mcgm
Water Conservation, Rain water Harvesting
As Per Mcgm
Water Supply
As Per Mcgm
Buildings / Wings in Kripa Vue
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Kripa Vue by Kripa Oneness Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

6028 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

12 apartments in total
Total
12
Booked
12
Available
0

Saleable Area Statistics (Sq. ft.)

10493 Total
Total
10493
Booked
10493
Available
0
Total 12 apartments in project. 12 apartments booked. 100% apartments booked.
Total 10493 Sq.ft. saleable area. 10493 saleable area booked.
100% area booked.

Kripa Vue

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Kripa VueSep 202412101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK9.58 Sq.mts. ( 103 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK19.21 Sq.mts. ( 207 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK72.58 Sq.mts. ( 781 Sq.ft. )5
5 Booked100% Booked
100% Booked
3 BHK90.53 Sq.mts. ( 974 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK133.74 Sq.mts. ( 1440 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK172.23 Sq.mts. ( 1854 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop154.21 Sq.mts. ( 1660 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop32.44 Sq.mts. ( 349 Sq.ft. )1
1 Booked100% Booked
100% Booked
12 total apartments / 12 apartments booked. 100% apartments booked.
Work Description in Building Kripa VueCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress84% done
84% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress50% done
50% Booked
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Kripa Oneness Private Limited
for Project
Kripa Vue
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation