Project overview

Konnark Meadows is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000015880. Konnark Meadows is located at 5/9, 5/11, 5/12 And 5/14. This is a New being developed by Bhausaheb Namdeo Shingade.

Konnark Meadows has 1 BHK & 2 BHK Apartments with carpet areas ranging from 277 to 417 Sq.ft. Carpet. The Project has total 300 of which 140 are currently available for sale.

Konnark Meadows is being developed on a total land area of 114098 Sq.ft. out of which 11852 Sq.ft. i.e 10% is reserved for recreational purposes. Konnark Meadows has 8 Wings / Towers 1,2,3,4,5,6,7,8

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Konnark Meadows
  • Location:
  • 5/9, 5/11, 5/12 And 5/14
  • Const. Stage:
    New
  • Possession:
    30 Jan 2026
Developer Details

  • Developer:
    Bhausaheb Namdeo Shingade
  • Phone:
  • Address:
  • Shelton Cubix
Project RERA Details
MAHA REARA No: P52000015880
Project Type Residential / Group Housing
RERA Project Status New
Architect M/S. Designo Architects
Funding Bank IDBI BANK
Proposed Possession 30 Jan 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 28 Mar 2018
Last Retrived 28 Jul 2025
Konnark Meadows QR Code
Konnark Meadows
MahaRERA - P52000015880
Apartment Details & Configuration
TypeArea
2 BHK38.72 Sq.mts. ( 417 Sq.ft. )
Shop6.12 Sq.mts. ( 66 Sq.ft. )
Shop7.55 Sq.mts. ( 81 Sq.ft. )
Shop9.45 Sq.mts. ( 102 Sq.ft. )
Shop9.81 Sq.mts. ( 106 Sq.ft. )
Shop9.82 Sq.mts. ( 106 Sq.ft. )
1RK18.01 Sq.mts. ( 194 Sq.ft. )
1RK17.76 Sq.mts. ( 191 Sq.ft. )
1 BHK26.51 Sq.mts. ( 285 Sq.ft. )
2 BHK30.38 Sq.mts. ( 327 Sq.ft. )
1 BHK25.76 Sq.mts. ( 277 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Konnark Meadowslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
0
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
0
Energy management
0
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
0
Open Parking
0
Sewerage (Chamber, Lines, Septic Tank , STP)
0
Solid Waste Management And Disposal
0
Storm Water Drains
0
Street Lighting
0
Treatment And Disposal Of Sewage And Sullage Water
0
Water Conservation, Rain water Harvesting
0
Water Supply
0
Buildings / Wings in Konnark Meadows
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Konnark Meadows by Bhausaheb Namdeo Shingadelast updated on 28 Jul 2025 as per information obtained from MARA RERA.

114098 Sq. ft.

Project Area

11852 Sq. ft.

Recreational Open Space

Total 8

Wings / Towers in Project

Apartments Statistics

300 apartments in total
Total
300
Booked
160
Available
140

Saleable Area Statistics (Sq. ft.)

77626 Total
Total
77626
Booked
38602
Available
39025
Total 300 apartments in project. 160 apartments booked. 53% apartments booked.
Total 77626 Sq.ft. saleable area. 38602 saleable area booked.
50% area booked.

1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
1Jan 20255101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK38.72 Sq.mts. ( 417 Sq.ft. )32
26 Booked81% Booked
81% Booked
Shop6.12 Sq.mts. ( 66 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop7.55 Sq.mts. ( 81 Sq.ft. )4
3 Booked75% Booked
75% Booked
Shop9.45 Sq.mts. ( 102 Sq.ft. )3
1 Booked33% Booked
33% Booked
Shop9.81 Sq.mts. ( 106 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop9.82 Sq.mts. ( 106 Sq.ft. )5
3 Booked60% Booked
60% Booked
47 total apartments / 34 apartments booked. 72% apartments booked.
Work Description in Building 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
2Jan 20255101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK18.01 Sq.mts. ( 194 Sq.ft. )64
49 Booked76% Booked
76% Booked
64 total apartments / 49 apartments booked. 76% apartments booked.
Work Description in Building 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
3Jan 20255101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK17.76 Sq.mts. ( 191 Sq.ft. )48
24 Booked50% Booked
50% Booked
48 total apartments / 24 apartments booked. 50% apartments booked.
Work Description in Building 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
4Jan 20254101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK18.01 Sq.mts. ( 194 Sq.ft. )27
27 total apartments / 1 apartments booked. 3% apartments booked.
Work Description in Building 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
5Jan 20254101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK18.01 Sq.mts. ( 194 Sq.ft. )36
34 Booked94% Booked
94% Booked
36 total apartments / 34 apartments booked. 94% apartments booked.
Work Description in Building 5Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
6Jan 20253101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK18.01 Sq.mts. ( 194 Sq.ft. )6
6 Booked100% Booked
100% Booked
6 total apartments / 6 apartments booked. 100% apartments booked.
Work Description in Building 6Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

7

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
7Jan 20255101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.51 Sq.mts. ( 285 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK30.38 Sq.mts. ( 327 Sq.ft. )5
None Booked0% Booked
0% Booked
2 BHK38.72 Sq.mts. ( 417 Sq.ft. )37
None Booked0% Booked
0% Booked
48 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building 7Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

8

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
8Jan 20254101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.76 Sq.mts. ( 277 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK38.72 Sq.mts. ( 417 Sq.ft. )18
12 Booked66% Booked
66% Booked
24 total apartments / 12 apartments booked. 50% apartments booked.
Work Description in Building 8Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Bhausaheb Namdeo Shingade
for Project
Konnark Meadows
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation