Project overview

Kohinoor City Residential Phase 2 Block 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800003258. Kohinoor City Residential Phase 2 Block 2 is located at 637/B/1A Of Village Kurla 2. This is a Ongoing being developed by Kohinoor Developers.

Kohinoor City Residential Phase 2 Block 2 has 2 BHK & SHOP Apartments with carpet areas ranging from 188 to 828 Sq.ft. Carpet. The Project has total 209 of which 0 are currently available for sale.

Kohinoor City Residential Phase 2 Block 2 is being developed on a total land area of 63925 Sq.ft. out of which 11430 Sq.ft. i.e 18% is reserved for recreational purposes. Kohinoor City Residential Phase 2 Block 2 has 6 Wings / Towers 12A,12B,13,14,20A,20B

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Kohinoor City Residential Phase 2 Block 2
  • Location:
  • 637/B/1A Of Village Kurla 2
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    Kohinoor Developers
  • Phone:
  • Address:
  • Kohinoor Corporate Office
Project RERA Details
MAHA REARA No: P51800003258
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Sandeep Shikre & Associates
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession 31 Mar 2025
Litigations No Litigations
Last Modified 02 Jun 2025
Last Retrived 26 Jul 2025
Kohinoor City Residential Phase 2 Block 2 QR Code
Kohinoor City Residential Phase 2 Block 2
MahaRERA - P51800003258
Apartment Details & Configuration
TypeArea
2 BHK84.87 Sq.mts. ( 914 Sq.ft. )
3 BHK130 Sq.mts. ( 1399 Sq.ft. )
2 BHK72.69 Sq.mts. ( 782 Sq.ft. )
2 BHK74.72 Sq.mts. ( 804 Sq.ft. )
2 BHK74.82 Sq.mts. ( 805 Sq.ft. )
2 BHK76.89 Sq.mts. ( 828 Sq.ft. )
3 BHK124.17 Sq.mts. ( 1337 Sq.ft. )
DUPLEX133.2 Sq.mts. ( 1434 Sq.ft. )
DUPLEX136.89 Sq.mts. ( 1473 Sq.ft. )
PENTHOUSE166.8 Sq.mts. ( 1795 Sq.ft. )
DUPLEX133.93 Sq.mts. ( 1442 Sq.ft. )
DUPLEX136.16 Sq.mts. ( 1466 Sq.ft. )
2 BHK74.47 Sq.mts. ( 802 Sq.ft. )
3 BHK96.05 Sq.mts. ( 1034 Sq.ft. )
3 BHK124.42 Sq.mts. ( 1339 Sq.ft. )
SHOP13.24 Sq.mts. ( 143 Sq.ft. )
SHOP16.96 Sq.mts. ( 183 Sq.ft. )
SHOP21.1 Sq.mts. ( 227 Sq.ft. )
SHOP21.76 Sq.mts. ( 234 Sq.ft. )
SHOP22.55 Sq.mts. ( 243 Sq.ft. )
SHOP26.32 Sq.mts. ( 283 Sq.ft. )
SHOP30.57 Sq.mts. ( 329 Sq.ft. )
SHOP17.49 Sq.mts. ( 188 Sq.ft. )
SHOP17.73 Sq.mts. ( 191 Sq.ft. )
SHOP19.65 Sq.mts. ( 212 Sq.ft. )
SHOP20.68 Sq.mts. ( 223 Sq.ft. )
SHOP32.85 Sq.mts. ( 354 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Kohinoor City Residential Phase 2 Block 2last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Not Started
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station70% completed
70% Complete
Work In Progress
Energy management11% completed
11% Complete
Work In Progress
Fire Protection And Fire Safety Requirements
Not Started
Landscaping & Tree Planting
Not Started
Open Parking
Not Started
Sewerage (Chamber, Lines, Septic Tank , STP)30% completed
30% Complete
Work In Progress
Solid Waste Management And Disposal
Not Started
Storm Water Drains25% completed
25% Complete
Work In Progress
Street Lighting
Not Started
Treatment And Disposal Of Sewage And Sullage Water
Not Started
Water Conservation, Rain water Harvesting
Not Started
Water Supply
Not Started
Buildings / Wings in Kohinoor City Residential Phase 2 Block 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Kohinoor City Residential Phase 2 Block 2 by Kohinoor Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

63925 Sq. ft.

Project Area

11430 Sq. ft.

Recreational Open Space

Total 6

Wings / Towers in Project

Apartments Statistics

209 apartments in total
Total
209
Booked
209
Available
0

Saleable Area Statistics (Sq. ft.)

181104 Total
Total
181104
Booked
181104
Available
0
Total 209 apartments in project. 209 apartments booked. 100% apartments booked.
Total 181104 Sq.ft. saleable area. 181104 saleable area booked.
100% area booked.

12A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
12AJan 19001112101247
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK84.87 Sq.mts. ( 914 Sq.ft. )20
20 Booked100% Booked
100% Booked
3 BHK130 Sq.mts. ( 1399 Sq.ft. )10
10 Booked100% Booked
100% Booked
30 total apartments / 30 apartments booked. 100% apartments booked.
Work Description in Building 12ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress21% done
21% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress99% done
99% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress64% done
64% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

12B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
12BJan 1900111210059
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK72.69 Sq.mts. ( 782 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK74.72 Sq.mts. ( 804 Sq.ft. )9
9 Booked100% Booked
100% Booked
2 BHK74.82 Sq.mts. ( 805 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK76.89 Sq.mts. ( 828 Sq.ft. )9
9 Booked100% Booked
100% Booked
3 BHK124.17 Sq.mts. ( 1337 Sq.ft. )1
1 Booked100% Booked
100% Booked
DUPLEX133.2 Sq.mts. ( 1434 Sq.ft. )1
1 Booked100% Booked
100% Booked
DUPLEX136.89 Sq.mts. ( 1473 Sq.ft. )1
1 Booked100% Booked
100% Booked
PENTHOUSE166.8 Sq.mts. ( 1795 Sq.ft. )1
1 Booked100% Booked
100% Booked
36 total apartments / 36 apartments booked. 100% apartments booked.
Work Description in Building 12BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress22% done
22% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress99% done
99% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress71% done
71% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

13

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
13Jan 1900111210160
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK72.69 Sq.mts. ( 782 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK74.72 Sq.mts. ( 804 Sq.ft. )9
9 Booked100% Booked
100% Booked
2 BHK74.82 Sq.mts. ( 805 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK76.89 Sq.mts. ( 828 Sq.ft. )9
9 Booked100% Booked
100% Booked
3 BHK124.17 Sq.mts. ( 1337 Sq.ft. )1
1 Booked100% Booked
100% Booked
DUPLEX133.93 Sq.mts. ( 1442 Sq.ft. )1
1 Booked100% Booked
100% Booked
DUPLEX136.16 Sq.mts. ( 1466 Sq.ft. )1
1 Booked100% Booked
100% Booked
PENTHOUSE166.8 Sq.mts. ( 1795 Sq.ft. )1
1 Booked100% Booked
100% Booked
36 total apartments / 36 apartments booked. 100% apartments booked.
Work Description in Building 13Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress99% done
99% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress98% done
98% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress98% done
98% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress99% done
99% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

14

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
14Jan 1900111210058
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK72.69 Sq.mts. ( 782 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK74.72 Sq.mts. ( 804 Sq.ft. )9
9 Booked100% Booked
100% Booked
2 BHK74.82 Sq.mts. ( 805 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK76.89 Sq.mts. ( 828 Sq.ft. )9
9 Booked100% Booked
100% Booked
3 BHK124.17 Sq.mts. ( 1337 Sq.ft. )1
1 Booked100% Booked
100% Booked
DUPLEX133.93 Sq.mts. ( 1442 Sq.ft. )1
1 Booked100% Booked
100% Booked
DUPLEX136.16 Sq.mts. ( 1466 Sq.ft. )1
1 Booked100% Booked
100% Booked
PENTHOUSE166.8 Sq.mts. ( 1795 Sq.ft. )1
1 Booked100% Booked
100% Booked
36 total apartments / 36 apartments booked. 100% apartments booked.
Work Description in Building 14Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress99% done
99% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress99% done
99% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress98% done
98% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

20A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
20AJan 1900111210063
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK72.69 Sq.mts. ( 782 Sq.ft. )10
10 Booked100% Booked
100% Booked
2 BHK74.47 Sq.mts. ( 802 Sq.ft. )9
9 Booked100% Booked
100% Booked
2 BHK76.89 Sq.mts. ( 828 Sq.ft. )9
9 Booked100% Booked
100% Booked
3 BHK96.05 Sq.mts. ( 1034 Sq.ft. )10
10 Booked100% Booked
100% Booked
3 BHK124.42 Sq.mts. ( 1339 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP13.24 Sq.mts. ( 143 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP16.96 Sq.mts. ( 183 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP21.1 Sq.mts. ( 227 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP21.76 Sq.mts. ( 234 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP22.55 Sq.mts. ( 243 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP26.32 Sq.mts. ( 283 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP30.57 Sq.mts. ( 329 Sq.ft. )1
1 Booked100% Booked
100% Booked
46 total apartments / 46 apartments booked. 100% apartments booked.
Work Description in Building 20ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress57% done
57% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

20B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
20BJan 1900111210038
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK74.72 Sq.mts. ( 804 Sq.ft. )9
9 Booked100% Booked
100% Booked
2 BHK76.89 Sq.mts. ( 828 Sq.ft. )11
11 Booked100% Booked
100% Booked
SHOP17.49 Sq.mts. ( 188 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP17.73 Sq.mts. ( 191 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP19.65 Sq.mts. ( 212 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP20.68 Sq.mts. ( 223 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP32.85 Sq.mts. ( 354 Sq.ft. )1
1 Booked100% Booked
100% Booked
25 total apartments / 25 apartments booked. 100% apartments booked.
Work Description in Building 20BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress49% done
49% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress53% done
53% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Kohinoor Developers
for Project
Kohinoor City Residential Phase 2 Block 2
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation