Project overview

Keziah Enclave is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000019147. Keziah Enclave is located at Palghar, Juchandra. This is a New Project being developed by Keziah Construction.

Keziah Enclave has TYPE 1, TYPE 2 & TYPE 3 Apartments with carpet areas ranging from 223 to 350 Sq.ft. Carpet. The Project has total 20 of which 7 are currently available for sale.

Keziah Enclave is being developed on a total land area of 5928 Sq.ft. Keziah Enclave has 1 Wings / Towers Q1 Keziah Enclave

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Keziah Enclave
  • Location:
  • Palghar, Juchandra
  • Const. Stage:
    New Project
  • Possession:
    30 Dec 2024
Developer Details

  • Developer:
    Keziah Construction
  • Phone:
  • Address:
  • Shop No 9, A-1 Cwing, Pereira Nagar, Next To Icici Bank, Opp Juchandra Police Station, Naigaon East, 401208
Project RERA Details
MAHA REARA No: P99000019147
Project Type Residential
RERA Project Status New Project
Funding Bank BASSEIN CATHOLIC CO-OP BANK LTD
Proposed Possession 30 Dec 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 03 Feb 2024
Last Retrived 28 Jul 2025
Keziah Enclave QR Code
Keziah Enclave
MahaRERA - P99000019147
Apartment Details & Configuration
TypeArea
TYPE 121.2 Sq.mts. ( 228 Sq.ft. )
TYPE 220.76 Sq.mts. ( 223 Sq.ft. )
TYPE 332.53 Sq.mts. ( 350 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Keziah Enclavelast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting20% completed
20% Complete
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting20% completed
20% Complete
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting20% completed
20% Complete
Water Supply20% completed
20% Complete
Buildings / Wings in Keziah Enclave
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Keziah Enclave by Keziah Constructionlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

5928 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

20 apartments in total
Total
20
Booked
13
Available
7

Saleable Area Statistics (Sq. ft.)

5150 Total
Total
5150
Booked
3557
Available
1593
Total 20 apartments in project. 13 apartments booked. 65% apartments booked.
Total 5150 Sq.ft. saleable area. 3557 saleable area booked.
69% area booked.

Q1 Keziah Enclave

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Q1 Keziah EnclaveJun 20245100070
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE 121.2 Sq.mts. ( 228 Sq.ft. )10
4 Booked40% Booked
40% Booked
TYPE 220.76 Sq.mts. ( 223 Sq.ft. )5
4 Booked80% Booked
80% Booked
TYPE 332.53 Sq.mts. ( 350 Sq.ft. )5
5 Booked100% Booked
100% Booked
20 total apartments / 13 apartments booked. 65% apartments booked.
Work Description in Building Q1 Keziah EnclaveCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Keziah Construction
for Project
Keziah Enclave
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation