Project overview

Karrm Residency -4 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700003215. Karrm Residency -4 is located at Survey No.172/2P As Per Tilr Numbering. This is a Ongoing being developed by Karrm Infrastructure Private Limited.

Karrm Residency -4 has 1 BHK Apartments with carpet areas ranging from 386 to 386 Sq.ft. Carpet. The Project has total 740 of which 107 are currently available for sale.

Karrm Residency -4 is being developed on a total land area of 396836 Sq.ft. out of which 239047 Sq.ft. i.e 60% is reserved for recreational purposes. Karrm Residency -4 has 14 Wings / Towers Aazad,Amrit,Anchal,Andaaz,Anurodh,Arpan,Darpan,Jyoti,Kranti,Naseeb,Pawan,Sangam,Sathi,Zindagi

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Karrm Residency -4
  • Location:
  • Survey No.172/2P As Per Tilr Numbering
  • Const. Stage:
    Ongoing
  • Possession:
    31 May 2019
Developer Details

  • Developer:
    Karrm Infrastructure Private Limited
  • Phone:
  • Address:
  • Dreams Mall Ground Floor
Project RERA Details
MAHA REARA No: P51700003215
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Fouzi And Associates (Mr Aamir)
Funding Bank AXIS BANK
Proposed Possession 31 May 2019
Revised Possession 31 May 2019
Extended Possession 30 Nov 2020
Litigations No Litigations
Last Modified 17 Jun 2020
Last Retrived 26 Jul 2025
Karrm Residency -4 QR Code
Karrm Residency -4
MahaRERA - P51700003215
Apartment Details & Configuration
TypeArea
1 BHK35.82 Sq.mts. ( 386 Sq.ft. )
1RK21.95 Sq.mts. ( 236 Sq.ft. )
1RK22.43 Sq.mts. ( 241 Sq.ft. )
1RK23.99 Sq.mts. ( 258 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Karrm Residency -4last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
-
Club House
-
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station50% completed
50% Complete
-
Energy management
-
Fire Protection And Fire Safety Requirements
-
Garden
-
Landscaping & Tree Planting10% completed
10% Complete
-
Nana Nani Park
-
Open Parking
-
Organic Waste Composite
-
Sewerage (Chamber, Lines, Septic Tank , STP)45% completed
45% Complete
-
Solid Waste Management And Disposal55% completed
55% Complete
-
Storm Water Drains95% completed
95% Complete
-
Street Lighting
-
Swimming pool
-
Treatment And Disposal Of Sewage And Sullage Water15% completed
15% Complete
-
Water Conservation, Rain water Harvesting
Na
Water Supply
-
Buildings / Wings in Karrm Residency -4
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Karrm Residency -4 by Karrm Infrastructure Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

396836 Sq. ft.

Project Area

239047 Sq. ft.

Recreational Open Space

Total 14

Wings / Towers in Project

Apartments Statistics

740 apartments in total
Total
740
Booked
633
Available
107

Saleable Area Statistics (Sq. ft.)

256267 Total
Total
256267
Booked
216030
Available
40238
Total 740 apartments in project. 633 apartments booked. 85% apartments booked.
Total 256267 Sq.ft. saleable area. 216030 saleable area booked.
84% area booked.

Aazad

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
AazadMay 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.82 Sq.mts. ( 386 Sq.ft. )60
46 Booked76% Booked
76% Booked
60 total apartments / 46 apartments booked. 76% apartments booked.
Work Description in Building AazadCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress20% done
20% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Amrit

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
AmritMay 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.82 Sq.mts. ( 386 Sq.ft. )60
47 Booked78% Booked
78% Booked
60 total apartments / 47 apartments booked. 78% apartments booked.
Work Description in Building AmritCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress30% done
30% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress20% done
20% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Anchal

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
AnchalMay 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.82 Sq.mts. ( 386 Sq.ft. )60
43 Booked71% Booked
71% Booked
60 total apartments / 43 apartments booked. 71% apartments booked.
Work Description in Building AnchalCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress35% done
35% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Andaaz

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
AndaazMay 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.82 Sq.mts. ( 386 Sq.ft. )60
42 Booked70% Booked
70% Booked
60 total apartments / 42 apartments booked. 70% apartments booked.
Work Description in Building AndaazCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress30% done
30% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress20% done
20% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Anurodh

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
AnurodhMay 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.82 Sq.mts. ( 386 Sq.ft. )60
51 Booked85% Booked
85% Booked
60 total apartments / 51 apartments booked. 85% apartments booked.
Work Description in Building AnurodhCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Arpan

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
ArpanMay 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK21.95 Sq.mts. ( 236 Sq.ft. )50
47 Booked94% Booked
94% Booked
1RK22.43 Sq.mts. ( 241 Sq.ft. )20
20 Booked100% Booked
100% Booked
1RK23.99 Sq.mts. ( 258 Sq.ft. )10
10 Booked100% Booked
100% Booked
80 total apartments / 77 apartments booked. 96% apartments booked.
Work Description in Building ArpanCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress20% done
20% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Darpan

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
DarpanMay 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.82 Sq.mts. ( 386 Sq.ft. )60
57 Booked95% Booked
95% Booked
60 total apartments / 57 apartments booked. 95% apartments booked.
Work Description in Building DarpanCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress20% done
20% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Jyoti

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
JyotiMay 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK21.95 Sq.mts. ( 236 Sq.ft. )25
24 Booked96% Booked
96% Booked
1RK22.43 Sq.mts. ( 241 Sq.ft. )10
9 Booked90% Booked
90% Booked
1RK23.99 Sq.mts. ( 258 Sq.ft. )5
4 Booked80% Booked
80% Booked
40 total apartments / 37 apartments booked. 92% apartments booked.
Work Description in Building JyotiCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress85% done
85% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress20% done
20% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Kranti

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
KrantiMay 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK21.95 Sq.mts. ( 236 Sq.ft. )50
49 Booked98% Booked
98% Booked
1RK22.43 Sq.mts. ( 241 Sq.ft. )20
20 Booked100% Booked
100% Booked
1RK23.99 Sq.mts. ( 258 Sq.ft. )10
10 Booked100% Booked
100% Booked
80 total apartments / 79 apartments booked. 98% apartments booked.
Work Description in Building KrantiCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress20% done
20% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress35% done
35% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Naseeb

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
NaseebMay 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.82 Sq.mts. ( 386 Sq.ft. )20
17 Booked85% Booked
85% Booked
20 total apartments / 17 apartments booked. 85% apartments booked.
Work Description in Building NaseebCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress85% done
85% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress20% done
20% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Pawan

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
PawanMay 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.82 Sq.mts. ( 386 Sq.ft. )40
35 Booked87% Booked
87% Booked
40 total apartments / 35 apartments booked. 87% apartments booked.
Work Description in Building PawanCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress85% done
85% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress20% done
20% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Sangam

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
SangamMay 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.82 Sq.mts. ( 386 Sq.ft. )40
36 Booked90% Booked
90% Booked
40 total apartments / 36 apartments booked. 90% apartments booked.
Work Description in Building SangamCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress20% done
20% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Sathi

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
SathiMay 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.82 Sq.mts. ( 386 Sq.ft. )60
49 Booked81% Booked
81% Booked
60 total apartments / 49 apartments booked. 81% apartments booked.
Work Description in Building SathiCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress50% done
50% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress20% done
20% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Zindagi

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
ZindagiMay 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.82 Sq.mts. ( 386 Sq.ft. )20
17 Booked85% Booked
85% Booked
20 total apartments / 17 apartments booked. 85% apartments booked.
Work Description in Building ZindagiCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress20% done
20% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Karrm Infrastructure Private Limited
for Project
Karrm Residency -4
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation