Project overview

Kalpataru Radiance B is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800000810. Kalpataru Radiance B is located at Cts No.260/5A Part Of Village Pahadi Goregaon West. This is a Ongoing being developed by Keyana Estate Llp.

Kalpataru Radiance B has 2 BHK & 3 BHK Apartments with carpet areas ranging from 809 to 1014 Sq.ft. Carpet. The Project has total 182 of which 33 are currently available for sale.

Kalpataru Radiance B is being developed on a total land area of 9160 Sq.ft. Kalpataru Radiance B has 1 Wings / Towers Wing B - Brilliance

ProjectDeveloperLocationPossession
Redevelopment Of Ganpati Niwas ChslBharat Realty Venture Private LimitedCts No 99931-07-2025 00:00:00
Kalpataru Radiance DKeyana Estate LlpCts No.260/5A -Part Of Village Pahadi Goregaon West30-06-2022 00:00:00
Kalpataru Radiance AKeyana Estate LlpCts No.260/5A -Part Of Village Pahadi Goregaon West30-06-2022 00:00:00
Saanvi HeightsAdinath Enterprise83C, 8231-12-2018 00:00:00
Construction Of 83 Lig Ts On Guest Plot Cts No 43 Pt Of Unnatagar, Village Pahadi Goregaon Mumbai Housing And Area Development Board4331-12-2018 00:00:00
Redevelopment Of Transit Building No 32 And 33 Sidharth Nagar Goregaon WestMumbai Housing And Area Development BoardCts No 26731-03-2018 00:00:00
Construcion Of 28 Lig Tenement On Plot Ob 8,Siddharth Nagar ,Goregaon West,MumbaiMumbai Housing And Area Development BoardCts 26 Part31-12-2017 00:00:00
Redevelopment Of Office Building No1 Sidharth Nagrar Goregaon WestMumbai Housing And Area Development BoardCts No 348 Sidharth Nagargoregaon West31-12-2017 00:00:00
Sharad Apartments Chs LtdAakar Constructions20331-12-2017 00:00:00
AthenaM/S. Sahajanand Developers26 Pt31-03-2020 00:00:00
Constrution Of 24 Lig Ts On Cts No 356 P At Siddharth Nagar Goregaon West Mumbai 400062Mumbai Housing And Area Development BoardCts No 356 Part30-06-2019 00:00:00
Kalpataru Radiance BKeyana Estate LlpCts No.260/5A Part Of Village Pahadi Goregaon West30-06-2022 00:00:00
Ekta Tripolis Phase IEkta Everglade Homes Private LimitedCts 22A/10 22A/11A, 22A/14 Pt, 2601/130-06-2021 00:00:00
Raj - BaijuRaj Arcade Pvt. Ltd.Cts 456/ Plot No 32431-12-2019 00:00:00
AristaM/S. Sahajanand Developers26 Pt30-12-2022 00:00:00
HimbinduM/S. Sahajanand Developers292/21 To 30, 292 Pt31-12-2018 00:00:00
Construction Of 94 Ews Ts And 182 Lig Ts On Cts No 43 Unnatnagar Goragaon WestMumbai Housing And Area Development Board43 Pt31-03-2018 00:00:00
M SpaceMahindra Lifespace Developers Limited899 C30-09-2019 00:00:00
Kalpataru Radiance CKeyana Estate LlpCts No.260/5A -Part Of Village Pahadi Goregaon West30-06-2022 00:00:00
Navkar AshrayNavkar Builder &Amp; DevvelopersTilak Nagar30-04-2016 00:00:00
Anmol Fortune - IiWadhwa Realty Pvt Ltd. Cts No-58 Part 1 To 7631-12-2019 00:00:00
Sunteck City Avenue 1Sunteck Realty Limited112A31-03-2020 00:00:00
Lotus ResidencyLotus Logistics And Developers Pvt Ltd136/2, 137/1 To 730-06-2021 00:00:00
Plot No 88Jitesh Bhawarlal Jain716, 7161 To 1131-05-2018 00:00:00
Mayadevi/ VikuthdhamHome Today Renovation India Pvt.Ltd584, 584/1 To 831-12-2018 00:00:00
Vaibhav Chs LtdSwastik Realty Pvt Ltd22030-06-2018 00:00:00
Goregaon Pearl Chs Ltd - Wing ASsd Escatics Pvt. Ltd.40010430-06-2017 00:00:00
Diwaprabhu ResidencyDiwaprabhu HomesCts No. 521.521/1 To 416-07-2018 00:00:00
Kalpataru Radiance EKeyana Estate LlpCts No.260/5A Part Of Village Pahadi Goregaon West30-06-2022 00:00:00
Samarth ResidencyAjay Sitaram Surve560, 1 To 630-12-2022 00:00:00
Jairajratna Chs LtdMumbai Shelter Project Jairajratan LlpMumbai Suburban30-06-2019 00:00:00
Dineshkunj Chs LtdSwastik Realty Pvt Ltd188 Cts No.60730-06-2018 00:00:00
Shri Ganesh ApartmentsMatushree Real Estate Developers Private LimitedCity Survey Number 22231-12-2017 00:00:00
Azad Laxmi Nagar Sra ChsGoodbuild (India) Private LimitedCts No 1A/178/2 Survey No 16130-12-2023 00:00:00
Ashtha Goregaon WestTown Developers41631-12-2019 00:00:00
Anmol Fortune - IiiWadhwa Realty Pvt Ltd. Cts No 58 Part 1 To 7630-12-2022 00:00:00
AsmiSia Developers Llp1046821 To 531-12-2019 00:00:00
Pahhal AvenueUmmang Realtors Llp799/1 To 8, 79931-12-2019 00:00:00
Redevelopment Of Navchandrakunj ChslPranav Constructions LimitedPlot No.42, Cts No.734/A, 734/1 To 630-03-2022 00:00:00
Prithvi ApartmentHitendra Nimbalkar113, 1 To 325-12-2020 00:00:00
Shivoham HeightsRajputana Heights6851 To 8, 685, 68431-12-2017 00:00:00
Shatrunjay PlazaAcme Metal Industries Pvt LtdCts 36A And 36B Of Village Goregaon30-12-2024 00:00:00
Pampa Co-Operative Housing SocietyArham Realtors Llp3531-03-2018 00:00:00
SamadhanShivam Parivar Developers Pvt Ltd26Part30-06-2021 00:00:00
Shiv GangaAnjani Kumar Co Pvt Ltd696, 696/130-06-2023 00:00:00
Mandor Heights Phase-IiA S K Construction Co626 626 1To430-03-2023 00:00:00
Siddharth Nagar Shivam Chs LtdVirendra Hiralal DoshiCts No 348 Part31-03-2025 00:00:00
Vijayi JwalaChirag Infraprojects Private Limited217(Pt)31-03-2027 00:00:00
Shree Hari EnclaveParesh PatelGoregaon West, Mumbai Suburban31-12-2025 00:00:00
Aum HeightsAbhismit EnterprisesPlot No 30 Cts No 221 Pt31-12-2018 00:00:00
Goregaon Makarand Chs, ParagGolden Land16731-05-2019 00:00:00
Siddharth Nagar Sukhvilla Chs LtdDilip Hiralal DoshiPlot No 6 - Cts No 350 Part 350/ 13 To 1630-06-2018 00:00:00
Ashish Building Of Emticibom Employees Chs LtdKarwa And Kewal Kiran Realtors8362, 8363, 836430-09-2024 00:00:00
Bali LaxmiBali Spaces Llp531 531/1 To 531/930-06-2024 00:00:00
Shastri Nagar Prerna C.H.S.Ltd.Confiable ConstructionsCts No. 219 Pt30-06-2025 00:00:00
Redevelopment Of Mettivilla ChslPranav Constructions LimitedCts No 659 659/1 To 659/530-12-2028 00:00:00
Golden Star Residency Building No 2Arundhati Ajay Kadam1227/7, 1227/630-09-2018 00:00:00
DeshabhimaniSiroyafm Constructions Pvt LtdMumbai Suburban, 40006206-07-2010 00:00:00
Om Shubh LabhBali Realty Llp695, 695/1 To 695/630-06-2018 00:00:00
34 Park EstateM/S Reddy Builders & Developers50 A Part, 55 Part, 49 Part31-07-2028 00:00:00
Laxmi HeightsLaxmidevi DevelopersPlot No 30731-12-2018 00:00:00
Redevlopment Of GovadhangiriTaksha Spaces Private Limited14- A /992/161 Part30-10-2022 00:00:00
Samosaran ApartmentsMahavir Construction Company400062, Mumbai Suburban31-12-2020 00:00:00
VeronaSahyog Homes Limited406 Pt31-07-2023 00:00:00
Kabra DiamanteKabra And Associates73, 73 / 1 To 6531-12-2025 00:00:00
Kandivali Sai Prassana Chs LtdAshwin EnterpriseCts Nos.955 Of Village Kandivali, Plot No 1131-10-2023 00:00:00
Satra OneBleu Noir Infrastructure Development Pvt. Ltd.217A Pt31-12-2024 00:00:00
Vasundhara Chs Ltd - Phase Ii - A And B WingReliable ConstructionsPlot No 6 Cts 219Pt Divn Konkan Village Pahadi Goregaon Tal Borivali Dist Mumbai 40010431-12-2019 00:00:00
Regent PalaceSadhna InfrastructuresCts 649, 649/1 To 431-03-2018 00:00:00
Rajendra Jhaveri ResidenceUsha Developers629 1 To 1131-12-2018 00:00:00
Siddharth Nagar SatyadeepSai Developers400104, Mumbai Suburban31-12-2019 00:00:00
Ariisto Sommet-ResidentialAshvi Developers Private LimitedNotionally Divided Part Of Cts No 236/A/1, 236/A/5 Of Village Pahadi Goregaon Tal. Borivali Msd30-12-2023 00:00:00
Redevlopment Of Sundresh Chs LtdRaj Corporation27431-12-2017 00:00:00
Paras ResidencyAureum Spaces Llp141/A30-09-2025 00:00:00
Sushanku Avenue 36Sushanku Realty Private Limited268A/131-12-2025 00:00:00
Bali DivineBali Estates Llp710 710/1 To 710/831-07-2025 00:00:00
Gokul ParadiseShree Radhe ConstructionCts 527 527 1 To 631-12-2024 00:00:00
Chandan HiraBali Shelters LlpCts No 703 Plot No 8130-09-2024 00:00:00
Vidya NidhiLaxmi Aakar Realty57231-03-2024 00:00:00
MotivillaAakar Shiv Infra Venture755/1 To 6, 75531-03-2024 00:00:00
Shastri Nagar Prabhat Chsl Phase Ii A And B WingReliable Constructions40010431-12-2025 00:00:00
Siddharth Nagar Abhiman Chs Ltd Building No-25Mumbai Shelter Housing Development Pvt Ltd347 Part31-12-2019 00:00:00
Laxmi NagarReliable ConstructionsPlot No B-1 Cts 1A170-B Pahadi Goregaon W Tal Borivali Dist Mumbai 40009030-12-2023 00:00:00
Vallabh Krupa ChslGun Rajan Constructions644/A/131-10-2026 00:00:00
MatrusmrutiGio Properties41702-10-2025 00:00:00
Goregaon Matrusmruti ChslMadhu Associates171, 171/1 To 1031-12-2025 00:00:00
Laxmi CallistaLaxmidevi Developers283A01-09-2019 00:00:00
Siddharth Nagar Paschim Jagruti Chs LtdShivam Parivar Developers Pvt LtdCts 365 Part30-12-2026 00:00:00
The MeadowsGuruashish Construction Private LimitedPlot No.R-10, Cts No-260/9A19-11-2019 00:00:00
Imperial Heights Wing C And DEpitome Residency Private Limited1 Part30-06-2019 00:00:00
Navrang AtlantisOxford Worldone Realty LlpC.T.S No 2/B31-01-2029 00:00:00
Earth TerraceM/S. Earth Graphics23,23/1 To 9, 24,24/1 To 8, 2531-12-2019 00:00:00
S. N. Saket Co-Op Housing Society LimitedMan Viraj Construction347 - B31-12-2018 00:00:00
Siddharth Nagar ParijatWhite Water DevelopersMumbai Suburban, 40010430-06-2021 00:00:00
Shreedham ClassicShreedham Construction Private Limited365/33 To 50 And 52 Non Slum Plot Bearing Cst No 370, 365 Pt, 356 Pt31-12-2018 00:00:00
Ashwin HeightsWestinrely Developers Pvt Ltd29731-12-2026 00:00:00
Vista Residences Wing C Tower 2Vista Developers Mumbai Llp1A/1/B/6A/1, 1A/1/B/6A/2 &1A/1/B/6B30-06-2029 00:00:00
Building No.9 - Phase IiKalindi Estate Developers1A/231-12-2026 00:00:00
Ariha VincereVelstand Realty LlpPlot No. 152 Bearing Cts No. 627, 627/1 -4 And Plot No. 151 Bearing Cts No. 630, 630/1 - 1130-06-2027 00:00:00
RivaanM/S Meghna Infracon Llp275, 275/1 To 275/928-12-2028 00:00:00
Redevelopment Of Om Manikanta ChslPranav Constructions LimitedCts No. 217/A27-12-2027 00:00:00
Rajputana ResidencyRajputana Residency LlpPlot No 221 Cts No 555 555/1 To 2 Survey No 105 To 110 146 And 14731-12-2028 00:00:00
Deepali Darshan J. P. Nagar Co-Operative Housing Society LimitedWestin Sankalp Developers108,108/1, 108/2 And 108/331-12-2026 00:00:00
Swati C.H.S. LtdDilip Hiralal DoshiCts No 348 P 348 70 To 7230-06-2018 00:00:00
Siddarth Nagar Arunodaya Chs LtdChiraginfraprojectspvt LtdMumbai Suburban, 40006231-03-2018 00:00:00
Ariisto Sommet-RetailAtithi Builders And Constructors Private Limited236/A/5 Of Village Pahadi Goregaon Tal. Borivali Msd, Notionally Divided Part Of Cts No 236/A/130-12-2023 00:00:00
Goregaon Rasik Co Op Hsg Society LtdAakar Real Estate DevelopersCts No. 208 Plot No 11431-03-2019 00:00:00
Dridhena Developers And RealtorsDridhena Developers And Realtors662, 662/1 To 528-02-2019 00:00:00
Dharmanath KrupaBali Landmarks Llp679/1 To 679/7, 67931-12-2018 00:00:00
Building On Sub Plot - D, Cts No 101/B Of Village GoregaonSkyline Construction Co.Part Of Sub Plot D Cts No 101 B Of Village Goregaon At Oshiwara District Centre Goregaon W Mumbai31-10-2019 00:00:00
Redevelopment Of Goregaon Prakash C.H.S.Ltd.M/S. Madhav Enterprises194/1 And 231-12-2018 00:00:00
OpulenceAriha Buildtech LlpCts No 446, 447, 447/1 To 14, 448, 448/1 To 23, 449, 449/1 To 22, 450, 450/1 To 22, 451, 451/1 To 25, 452 & 453, 453/1 To 21(Scheme-I)& Cts No 439, 440, 440/1 To 21, 441, 44231-12-2029 00:00:00
Sushanku Avenue 37Sushanku Realty Private LimitedCts No. 268A/1(Pt.), C.S No. 16131-12-2027 00:00:00
Ekta Suprabhat C.H.S.L.S D ConstructionPlot Bearing No.29&30 Cts No 267(Pt)31-12-2025 00:00:00
Siddharth Nagar Siddhivinayak Chs LtdInfinity ConstructionsCts 348/62 To 6531-12-2027 00:00:00
Luxury Chsl LtdLaxmidevi DevelopersBehind Filmistan30-06-2025 00:00:00
Project Details
  • Project:
    Kalpataru Radiance B
  • Location:
  • Cts No.260/5A Part Of Village Pahadi Goregaon West
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2022
Developer Details

  • Developer:
    Keyana Estate Llp
  • Phone:
  • Address:
  • Kalpataru Synergy
Project RERA Details
MAHA REARA No: P51800000810
Project Type Residential / Group Housing
RERA Project Status Ongoing
Funding Bank ICICI BANK LIMITED
Proposed Possession 30 Jun 2022
Revised Possession 30 Jun 2022
Extended Possession 30 Dec 2024
Litigations No Litigations
Last Modified 02 Apr 2024
Last Retrived 26 Jul 2025
Kalpataru Radiance B QR Code
Kalpataru Radiance B
MahaRERA - P51800000810
Apartment Details & Configuration
TypeArea
2 BHK75.16 Sq.mts. ( 809 Sq.ft. )
3 BHK90.89 Sq.mts. ( 978 Sq.ft. )
3 BHK92.16 Sq.mts. ( 992 Sq.ft. )
3 BHK94.23 Sq.mts. ( 1014 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Kalpataru Radiance Blast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
2 No. of Common Basement100% completed
95% Complete
Common For Entire Layout As Per Afs
3 Nos of Podiums E Deck100% completed
95% Complete
Common For Entire Layout As Per Afs
Aggregate area of recreational Open Space
4365 Sq. Mt Common For Whole Project
Club House Fitness Centre Swimming Pool and other Recreational Areas85% completed
85% Complete
Common For Entire Layout As Per Afs
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Electric Meter Room And Sub-Station Only
Energy management100% completed
95% Complete
To Be Done Before Completion Of Whole Project
Fire Protection And Fire Safety Requirements100% completed
95% Complete
To Be Done Before Completion Of Whole Project
Landscaping & Tree Planting94% completed
94% Complete
To Be Done Before Completion Of Whole Project
Open Parking
To Be Done Before Completion Of Whole Project
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Stp-Common For Entire Layout
Solid Waste Management And Disposal100% completed
95% Complete
To Be Done Before Completion Of Whole Project
Storm Water Drains100% completed
95% Complete
Common For Entire Layout
Street Lighting
To Be Done Before Completion Of Whole Project
Treatment And Disposal Of Sewage And Sullage Water
To Be Done Before Completion Of Whole Project
Water Conservation, Rain water Harvesting100% completed
95% Complete
To Be Done Before Completion Of Whole Project
Water Supply100% completed
95% Complete
Suppy From Local Authority
Buildings / Wings in Kalpataru Radiance B
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Kalpataru Radiance B by Keyana Estate Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

9160 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

182 apartments in total
Total
182
Booked
149
Available
33

Saleable Area Statistics (Sq. ft.)

180313 Total
Total
180313
Booked
148313
Available
32000
Total 182 apartments in project. 149 apartments booked. 81% apartments booked.
Total 180313 Sq.ft. saleable area. 148313 saleable area booked.
82% area booked.

Wing B - Brilliance

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing B - BrillianceDec 20213112130283
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK75.16 Sq.mts. ( 809 Sq.ft. )4
None Booked0% Booked
0% Booked
3 BHK90.89 Sq.mts. ( 978 Sq.ft. )58
43 Booked74% Booked
74% Booked
3 BHK92.16 Sq.mts. ( 992 Sq.ft. )62
57 Booked91% Booked
91% Booked
3 BHK94.23 Sq.mts. ( 1014 Sq.ft. )58
49 Booked84% Booked
84% Booked
182 total apartments / 149 apartments booked. 81% apartments booked.
Work Description in Building Wing B - BrillianceCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress60% done
60% Booked
Sanitary Fittings within the flats / premises
work-in-progress60% done
60% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Keyana Estate Llp
for Project
Kalpataru Radiance B
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation