Project overview

Kalpataru Park Riviera - Wing C and D is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000027454. Kalpataru Park Riviera - Wing C and D is located at Fp No 459Pt 495Pt Of Tps Panvel. This is a New being developed by Kalpataru Plus Sharyans.

Kalpataru Park Riviera - Wing C and D has 2 BHK & 3 BHK Apartments with carpet areas ranging from 16127 to 63211 Sq.ft. Carpet. The Project has total 234 of which 78 are currently available for sale.

Kalpataru Park Riviera - Wing C and D is being developed on a total land area of 15865 Sq.ft. Kalpataru Park Riviera - Wing C and D has 2 Wings / Towers Wing C - Aqua,Wing D - Azure

ProjectDeveloperLocationPossession
LANDMARKLANDINFRA DEVELOPERSPlot No 3830-09-2018 00:00:00
PushpakA R ConstructionsPlot No-3230-04-2018 00:00:00
LA RIVERIALAKHANI BUILDERS PVT LTD49131-05-2019 00:00:00
SKYLINE CORNERSKYLINE DEVELOPERSPlot No.32, Sector 3, Karanjade31-03-2018 00:00:00
APEX STEPAPEX REALTORSPlot No 54 Sector 0606-01-2019 00:00:00
Keshar KunjKeshar RealitiesPlot No. 3130-12-2022 00:00:00
POOJA ANGANRAJENDRA THORATPlot No.50 Sector 5A31-03-2018 00:00:00
Kalpataru WaterfrontKalpataru Plus SharyansF P No.497 Pt And 498 Pt Of Tps Panvel30-12-2021 00:00:00
VARD VINAYAKSHREE VARDVINAYAK ENTERPRISESPlot No 3431-10-2018 00:00:00
SAI ASHISH ENTERPRISESSAI ASHISH ENTERPRISES20 A31-12-2017 00:00:00
SKYLINE HEIGHTSPEARL PROPERTIESPlot No 2831-12-2017 00:00:00
PANCHRATNA PARKHINDUSTAN CONSTRUCTION BUILDERS & DEVELOPERS164 1 And 2 131-12-2018 00:00:00
KRISHNA HARMONYRADHE KRISHNA BUILDERSPlot No 15131-12-2018 00:00:00
SAPHIRE ORIELSAPHIRE ASSOCIATESPlot No.68, Sector-630-06-2018 00:00:00
VARDHMAN VATIKAKashyap And AssociatesPlot No 12, Sector 5A31-08-2018 00:00:00
SAI SHAKTIMANGESH EKNATH THAKURPlot No.42 Sector 0628-02-2018 00:00:00
SAUBHAGYA DARSHANSAUBHAGYA BUILDERS14731-12-2018 00:00:00
SAI PEARLSHREE DEVELOPERSA 121, Sector 631-12-2017 00:00:00
CHAITANYA SHREE SAMARTH KRUPARAJENDRA MADHUKAR JOSHIPlot No 99 Sector 2A Karanjade24-09-2019 00:00:00
SWARAJ HEIGHTSSWARAJ HOMES BUILDERS AND DEVELOPERS410206, Raigarh28-11-2022 00:00:00
CHAITANYA NIWASRAJENDRA MADHUKAR JOSHIPlot No 2821-03-2021 00:00:00
EXCELLANZAASHANTANU REALTORS9230-03-2021 00:00:00
SAI ANCHITVANDANA PRASHANT PINGLEPlot No 23 Sector 631-03-2018 00:00:00
NANDADEVI GALAXYAAIJI GROUPPlot No.1630-12-2022 00:00:00
ALANKAAR RESIDENCYS P DEVELOPERS22, 22/1 And 8/A130-12-2022 00:00:00
ADINATH ARADHANASHREE RIDDHI SIDDHI CONSTRUCTIONS4030-12-2021 00:00:00
ADINATH ASTHASHREE RIDDHI SIDDHI CONSTRUCTIONS7030-12-2021 00:00:00
SAI AANGANSAIJYOTBUILDERS&DEVELOPERSPlot No. 11331-01-2018 00:00:00
SARANG ARYANARYAN ENTRPRISESPlot No 02 Sector 6 Karanjade30-09-2019 00:00:00
SAI DEEPSAMBHAV PROJECTS3631-12-2019 00:00:00
BHAVESHWAR MANSIONBHAVESHWAR DEVELOPERSPlot No.5131-12-2019 00:00:00
VAISHNAVI ARCADERK GROUP OF INFRAPlot No 13130-09-2020 00:00:00
ADITI AVENUEHARI KRISHNA DEVELOPERS39, Sector 5 A Karanjade30-12-2021 00:00:00
Blue CrestElinor Infra LLPPlot No. 9331-12-2018 00:00:00
MAPLE VILLAAVACHAR BEACHARA BHATHIPlot No.3, Sector-531-12-2017 00:00:00
DREAM DIVINEDIVINE DEVELOPERSPlot Bearing No 36 Sector 530-12-2023 00:00:00
SIRVI AVENUEPYRAMID ENTERPRISESPlot No 9831-12-2019 00:00:00
VIGHNAHAR RESIDENCYNAFIAH DEVELOPERSSector-5A, Plot No. 4831-12-2017 00:00:00
Aayushi HeightsPRIYANSHI ENTERPRISESPlot No 10, Sector 5A, Karanjade31-12-2019 00:00:00
Chandra Darshan AavishkarKalpsutra DevelopersPlot No 5831-12-2019 00:00:00
SAI AASTHAYASH RAJ DEVELOPERS15330-03-2023 00:00:00
APEX VILLAAPEX GROUP11530-12-2021 00:00:00
OM RUDRA HEIGHTSRUDRA REALTORSPlot No 9 And 10 Sector No 2 Karanjade30-12-2023 00:00:00
Shree ArpanShree EnterprisesPlot No - 7030-03-2021 00:00:00
KVK ARUMM/S. KVK BUILDERS & DEVELOPERSPlot No 166 Sector 04 Karanjade30-10-2022 00:00:00
Aayushi ApartmentPRIYANSHI ENTERPRISESPlot No. 42, Sector 5A, Karanjade31-12-2019 00:00:00
RUSHIKESHRUSHI DEVELOPERSSector 2A Plot 5431-01-2019 00:00:00
APEX NESTAPEX GROUPPlot No 33 Sector 0116-10-2018 00:00:00
DEEP RISEKIRTI SHAHPlot No 111 Sector 5 Karanjade Panvel31-08-2018 00:00:00
Omkara PrathmeshOmkara Builders & DevelopersPlot No. 2, Sector - 4,31-05-2019 00:00:00
Anusaya HeightsJaimakk InfraPlot No - 531-12-2018 00:00:00
Kalpataru Park Riviera - Wing A and BKalpataru Plus SharyansF.P. No. 495 Pt Of Tps Panvel31-12-2025 00:00:00
MP HeightsMPS HomeFinal Plot No.-278/4, 5, 6A31-03-2027 00:00:00
Shree Ram Krupa CHSLJ.B Realty206/2931-12-2024 00:00:00
RAMDOOTHARESHKUMAR RASIKLAL SHAHPlot No 0630-09-2020 00:00:00
OBELISKSHREE CHINMAY GAURANG INFRASTRUCTURESub Plot No. 11, Survey No.746/1A,746/1B30-03-2024 00:00:00
SHREYAS VILLAVINODRAI PREMJIBHAI TRAPASIAPlot No40 Sector6 Karanjade31-03-2018 00:00:00
APEX LOVEAPEX GROUPPlot No 29 Sector 0130-06-2019 00:00:00
SHIV ASHIRWADSHIVKRUPA ENTERPRISES8030-04-2018 00:00:00
QUALCON HERITAGEQUALCON TAKKA PROPERTIES LLP28731-12-2025 00:00:00
J.K. PRIDEJ.K.INFRACONPlot No 4430-04-2026 00:00:00
SAI NAMAHSWAPNIL MOHAN KALYANKARFinal Plot No. - 225/231-12-2030 00:00:00
CHAITANYA AAWASRAJENDRA MADHUKAR JOSHIPlot No 1419-06-2022 00:00:00
ABRI NESTABUFAIZ RABBANI KHANPlot No 3630-12-2021 00:00:00
DOSTY HERITAGEDOSTY INFRAPlot No 2624-05-2022 00:00:00
AUM SHREENEW HOMES BUILDERS AND DEVELOPERS2831-03-2018 00:00:00
Sonai ResidencyAayushi EnterprisesPlot No. 02, Sector 5A, Karanjade30-06-2018 00:00:00
ARADHYA RESIDENCYMEERA DEVELOPERSPlot No.22B31-12-2018 00:00:00
TRIMURTI PROXIMASUBHASH FAUJDAR YADAV1 B20-11-2019 00:00:00
VINAYAK ASHRAYSHREE AMBE ENTERPRISESPlot No 60 And 60A01-12-2021 00:00:00
RAJ AMBARRAJ INFRA DEVELOPERSPlot No 8431-12-2017 00:00:00
FUTURE HEIGHTSFUTURE HOMES CONSTRUCTIONSRaigarh, 41020631-03-2021 00:00:00
SAI MANNATSWARAJ HOMES BUILDERS AND DEVELOPERSPlot No. 79, Sector 2 A30-12-2021 00:00:00
BHAVESHWAR CORNERBHAVESHWAR CONSTRUCTIONPlot No 144 Sector 4 Karanjade Panvel 41020631-12-2019 00:00:00
AAIJI HILLSOM SAI DEVELOPERSPlot No 35, Sector-6, Node-Karanjade31-12-2018 00:00:00
ROYAL RESIDENCYRoyal EnterprisesSurvey No 32, Hissa No2a,Cts No 223630-03-2024 00:00:00
Sai Samartha BlessingsShree Sai Samartha Developers1142,114331-12-2017 00:00:00
APEX VILLAAPEX BUILDERS & DEVELOPERS4031-03-2019 00:00:00
Reyansh ResidencyShree Samarth Builders And DevelopersRaigarh, 41020631-12-2020 00:00:00
AAIJI PARKOm Sai developersPlot No 13630-05-2022 00:00:00
CHAITANYA SADANChaitanya Builders and DevelopersPlot No. 21, Sector No- 5A15-06-2027 00:00:00
JESWANI LUXURIOSJeswani Properties LLPPlot No- 216/230-06-2028 00:00:00
Godavari GrandeurMAITREE BUILDERS AND DEVELOPERSFinal Plot No 24601-10-2026 00:00:00
SAIRATNA CHS LTDMANGALMURTI CONSTRUCTIONSFinal Plot No. 205/86, Plot No. 11831-12-2028 00:00:00
SHREYAS APARTMENTRUPAL VINOD TRAPASIAPlot No 29 Sector 06 Karanjade30-09-2020 00:00:00
VIDYA HEIGHTSLandmark Builders And DevelopersPlot No 10611-08-2022 00:00:00
Jayshree RamRachana ConstructionCts Number - 941,96030-03-2022 00:00:00
Kalpataru Park Riviera - Wing C and DKalpataru Plus SharyansFp No 459Pt 495Pt Of Tps Panvel30-06-2026 00:00:00
JEWEL OF PANVEL PHASE -IOKAY ESTATE DEVELOPERS PRIVATE LIMITEDPlot No -28030-06-2027 00:00:00
MARATHON NEXZONE ASTER - 1SANVO RESORTS PVT. LTD.96/1 96/2 97/1 97/2/2 98/6/2/1 98/6/2/230-06-2027 00:00:00
VISHWAVARAD RESIDENCYVARSHA NARESH LALWANIPlot No. 4331-12-2018 00:00:00
OM CHALETOM BUILDERS & DEVELOPERSPlot No 42D26-12-2018 00:00:00
SHANTI NIKETANSHREE SAIDATT DEVELOPERSPlot No 7931-12-2017 00:00:00
VIGHNESHTIMES HOMEPlot- 141 Sector-04, Karanjade30-12-2023 00:00:00
Geetanjali Beauty Tower CHSLJ M M HomesFinal Plot No - 26431-12-2024 00:00:00
ABRI PACIFICABUFAIZ RABBANI KHANPlot No A 101 Sector 631-12-2026 00:00:00
Aayushi PrideAayushi Infracone LLPPlot No 3731-03-2025 00:00:00
Laxmi Raghunath NiwasELEGANCE BUILDCONC. T. S No. - 831, 831 / 1, 831 / 231-12-2025 00:00:00
COURTYARDLAKHANI BUILDERS PVT LTDF P 50531-05-2027 00:00:00
SIDDHIVINAYAK SPARSHAJAY ANANTA PATILPlot No 8031-03-2027 00:00:00
VASTU VASANTVASTUSHILP CONSTRUCTIONFinal Plot No 205/35, Mcch Plot No 10231-05-2026 00:00:00
JASH PRIDETRINETRA BUILDERS AND DEVELOPERSPlot No-6101-11-2018 00:00:00
Neelsidhi CentrioNeel Sidhi Lifespaces Llp28-02-2029 00:00:00
Saavi ResidencyS B Construction31-05-2028 00:00:00
Priyadarshani ChsSaboori Construction And Services30-06-2030 00:00:00
Bhaveshwar VelloraBhaveshwar Realty31-12-2028 00:00:00
VINAYAK SHRADHASHRI ASHTAVINAYAK ENTERPRISESPlot No 1F Sector 3A Karanjade31-12-2027 00:00:00
Project Details
  • Project:
    Kalpataru Park Riviera - Wing C and D
  • Location:
  • Fp No 459Pt 495Pt Of Tps Panvel
  • Const. Stage:
    New
  • Possession:
    30 Jun 2026
Developer Details

  • Developer:
    Kalpataru Plus Sharyans
  • Phone:
  • Address:
  • Kalpataru Synergy
Project RERA Details
MAHA REARA No: P52000027454
Project Type Residential / Group Housing
RERA Project Status New
Funding Bank HDFC BANK
Proposed Possession 30 Jun 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 10 Dec 2020
Last Retrived 14 Feb 2026
Kalpataru Park Riviera - Wing C and D QR Code
Kalpataru Park Riviera - Wing C and D
MahaRERA - P52000027454
Apartment Details & Configuration
TypeArea
2 BHK5862.93 Sq.mts. ( 63109 Sq.ft. )
3 BHK1488.06 Sq.mts. ( 16017 Sq.ft. )
2 BHK5872.41 Sq.mts. ( 63211 Sq.ft. )
3 BHK1498.22 Sq.mts. ( 16127 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Kalpataru Park Riviera - Wing C and Dlast updated on 14 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
2 No. of Common Basement
To Be Done Before Completion Of Whole Project
2 Nos of Common Podium
To Be Done Before Completion Of Whole Project
Aggregate area of recreational Open Space
925.53 Sq Mts. Common Los As Per Afs
Club House other Recreational Areas and Swimming Pool
To Be Done Before Completion Of Whole Project
Community Buildings
To Be Done Before Completion Of Whole Project
Electrical Meter Room, Sub-Station, Receiving Station
Electric Meter Room And Sub-Station Only
Energy management
To Be Done Before Completion Of Whole Project
Fire Protection And Fire Safety Requirements
To Be Done Before Completion Of Whole Project
Landscaping & Tree Planting
To Be Done Before Completion Of Whole Project
Open Parking
To Be Done Before Completion Of Whole Project
Sewerage (Chamber, Lines, Septic Tank , STP)
Stp Only
Solid Waste Management And Disposal
To Be Done Before Completion Of Whole Project
Storm Water Drains
To Be Done Before Completion Of Whole Project
Street Lighting
To Be Done Before Completion Of Whole Project
Treatment And Disposal Of Sewage And Sullage Water
To Be Done Before Completion Of Whole Project
Water Conservation, Rain water Harvesting
To Be Done Before Completion Of Whole Project
Water Supply
To Be Done Before Completion Of Whole Project
Buildings / Wings in Kalpataru Park Riviera - Wing C and D
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Kalpataru Park Riviera - Wing C and D by Kalpataru Plus Sharyanslast updated on 14 Feb 2026 as per information obtained from MARA RERA.

15865 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

234 apartments in total
Total
234
Booked
156
Available
78

Saleable Area Statistics (Sq. ft.)

12990023 Total
Total
12990023
Booked
8534449
Available
4455574
Total 234 apartments in project. 156 apartments booked. 66% apartments booked.
Total 12990023 Sq.ft. saleable area. 8534449 saleable area booked.
66% area booked.

Wing C - Aqua

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing C - AquaMay 20252212129349
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK5862.93 Sq.mts. ( 63109 Sq.ft. )98
64 Booked65% Booked
65% Booked
3 BHK1488.06 Sq.mts. ( 16017 Sq.ft. )19
14 Booked73% Booked
73% Booked
117 total apartments / 78 apartments booked. 66% apartments booked.
Work Description in Building Wing C - AquaCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress40% done
40% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress59% done
59% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress67% done
67% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing D - Azure

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing D - AzureMay 20252212129349
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK5872.41 Sq.mts. ( 63211 Sq.ft. )98
64 Booked65% Booked
65% Booked
3 BHK1498.22 Sq.mts. ( 16127 Sq.ft. )19
14 Booked73% Booked
73% Booked
117 total apartments / 78 apartments booked. 66% apartments booked.
Work Description in Building Wing D - AzureCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress59% done
59% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress67% done
67% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress41% done
41% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Kalpataru Plus Sharyans
for Project
Kalpataru Park Riviera - Wing C and D
last updated on 14 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation