Project overview
Kalpataru Heights is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700026453. Kalpataru Heights is located at 421102. This is a New Project being developed by Shivtej Buildcon.
Kalpataru Heights has 1 BHK, 2 BHK, Office space & Shop Apartments with carpet areas ranging from 217 to 494 Sq.ft. Carpet. The Project has total 104 of which 104 are currently available for sale.
Kalpataru Heights is being developed on a total land area of 31755 Sq.ft. out of which 5274 Sq.ft. i.e 17% is reserved for recreational purposes. Kalpataru Heights has 3 Wings / Towers A Wing,B Wing,C Wing
| Project | Developer | Location | Possession |
-
Project:
Kalpataru Heights
-
Location:
-
421102
-
Const. Stage:
New Project
-
Possession:
30 Sep 2024
-
Developer:
Shivtej Buildcon
-
Phone:
-
Address:
-
S No 1, H No. 4, At Ataligaon, Nandkarroad, Near Hanuman Mandir, Near Hanuman Mandir, 421102
| MAHA REARA No: |
P51700026453 |
| Project Type |
Residential |
| RERA Project Status |
New Project |
| Funding Bank |
HDFC BANK LTD |
| Proposed Possession |
30 Sep 2024 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
21 Sep 2020 |
| Last Retrived |
28 Jul 2025 |
Kalpataru Heights QR Code
Kalpataru Heights
MahaRERA - P51700026453
| Type | Area |
| 1RK | 16.27 Sq.mts. ( 175 Sq.ft. ) |
| 1 BHK | 27.51 Sq.mts. ( 296 Sq.ft. ) |
| 1 BHK | 29.4 Sq.mts. ( 316 Sq.ft. ) |
| 1 BHK | 29.82 Sq.mts. ( 321 Sq.ft. ) |
| 1 BHK | 30.49 Sq.mts. ( 328 Sq.ft. ) |
| 2 BHK | 38.71 Sq.mts. ( 417 Sq.ft. ) |
| 2 BHK | 45.92 Sq.mts. ( 494 Sq.ft. ) |
| Office space | 28.66 Sq.mts. ( 308 Sq.ft. ) |
| Office space | 29.17 Sq.mts. ( 314 Sq.ft. ) |
| Office space | 20.2 Sq.mts. ( 217 Sq.ft. ) |
| Office space | 20.7 Sq.mts. ( 223 Sq.ft. ) |
| Shop | 23.76 Sq.mts. ( 256 Sq.ft. ) |
| Shop | 32.67 Sq.mts. ( 352 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Kalpataru Heightslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
0 |
|
|
|
0 |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
0 |
|
|
|
Na |
Fire Protection And Fire Safety
Requirements
|
|
0 |
Landscaping & Tree Planting
|
|
0 |
|
|
|
Na |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
0 |
Solid Waste Management And Disposal
|
|
Na |
|
|
|
0 |
|
|
|
0 |
Treatment And Disposal Of Sewage And Sullage Water
|
|
0 |
Water Conservation, Rain water Harvesting
|
|
Na |
|
|
|
0 |
Buildings / Wings in Kalpataru Heights
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Kalpataru Heights by Shivtej Buildconlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
104
apartments in total
Saleable Area Statistics (Sq. ft.)
26317
Total
Total 104 apartments in project. 0 apartments booked. 0% apartments booked.
Total 26317 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| A Wing | Mar 2024 | 8 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1RK | 16.27 Sq.mts. ( 175 Sq.ft. ) | 27 | |
27 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building A Wing | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| B Wing | Mar 2024 | 11 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 27.51 Sq.mts. ( 296 Sq.ft. ) | 5 | |
| 1RK | 16.27 Sq.mts. ( 175 Sq.ft. ) | 36 | |
41 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building B Wing | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| C Wing | Mar 2024 | 13 | 1 | 0 | 0 | 0 | 10 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 29.4 Sq.mts. ( 316 Sq.ft. ) | 6 | |
| 1 BHK | 29.82 Sq.mts. ( 321 Sq.ft. ) | 4 | |
| 1 BHK | 30.49 Sq.mts. ( 328 Sq.ft. ) | 1 | |
| 2 BHK | 38.71 Sq.mts. ( 417 Sq.ft. ) | 5 | |
| 2 BHK | 45.92 Sq.mts. ( 494 Sq.ft. ) | 12 | |
| Office space | 28.66 Sq.mts. ( 308 Sq.ft. ) | 1 | |
| Office space | 29.17 Sq.mts. ( 314 Sq.ft. ) | 1 | |
| Office space | 20.2 Sq.mts. ( 217 Sq.ft. ) | 1 | |
| Office space | 20.7 Sq.mts. ( 223 Sq.ft. ) | 1 | |
| Shop | 23.76 Sq.mts. ( 256 Sq.ft. ) | 2 | |
| Shop | 32.67 Sq.mts. ( 352 Sq.ft. ) | 2 | |
36 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building C Wing | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Shivtej Buildcon
for Project
Kalpataru Heights
last updated on
28 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |