Project overview

Kalpataru Avana is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900000793. Kalpataru Avana is located at C S No 1/296 Part Of Parel Sewree Division. This is a Ongoing being developed by Kalpataru Limited.

Kalpataru Avana has 3 BHK, 4 BHK, 5 BHK, DUPLEXES, Studio Type 1 & Studio Type 2 Apartments with carpet areas ranging from 14790 to 74590 Sq.ft. Carpet. The Project has total 276 of which 22 are currently available for sale.

Kalpataru Avana is being developed on a total land area of 14402 Sq.ft. out of which 25059 Sq.ft. i.e 174% is reserved for recreational purposes. Kalpataru Avana has 1 Wings / Towers South And North Towers - Wing A And B

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Kalpataru Avana
  • Location:
  • C S No 1/296 Part Of Parel Sewree Division
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    Kalpataru Limited
  • Phone:
  • Address:
  • Kalpataru Synergy
Project RERA Details
MAHA REARA No: P51900000793
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Atul Gulati
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2022
Revised Possession 30 Dec 2022
Extended Possession
Litigations No Litigations
Last Modified 27 May 2021
Last Retrived 26 Jul 2025
Kalpataru Avana QR Code
Kalpataru Avana
MahaRERA - P51900000793
Apartment Details & Configuration
TypeArea
3 BHK6929.58 Sq.mts. ( 74590 Sq.ft. )
4 BHK17002.6 Sq.mts. ( 183016 Sq.ft. )
5 BHK1374 Sq.mts. ( 14790 Sq.ft. )
DUPLEXES2523.37 Sq.mts. ( 27162 Sq.ft. )
Studio Type 1595.98 Sq.mts. ( 6415 Sq.ft. )
Studio Type 22616.18 Sq.mts. ( 28161 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Kalpataru Avanalast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
2328 Sq Mtr Common As Per Afs
Club House, Gymnasium, Swimming pool & other recreation areas50% completed
50% Complete
Common As Per Afs
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Meter Room And Sub-Station Only
Energy management50% completed
50% Complete
Shall Be Completed Before Possession
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Shall Be Completed Before Possession
Landscaping & Tree Planting81% completed
81% Complete
Shall Be Completed Before Possession
NA
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)86% completed
86% Complete
Wip- Stp Only
Solid Waste Management And Disposal100% completed
95% Complete
Shall Be Completed Before Possession
Storm Water Drains94% completed
94% Complete
Wip
Street Lighting
Shall Be Completed Before Possession
Treatment And Disposal Of Sewage And Sullage Water
Shall Be Completed Before Possession
Water Conservation, Rain water Harvesting100% completed
95% Complete
Wip
Water Supply100% completed
95% Complete
Supply From Local Authority
Buildings / Wings in Kalpataru Avana
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Kalpataru Avana by Kalpataru Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

14402 Sq. ft.

Project Area

25059 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

276 apartments in total
Total
276
Booked
254
Available
22

Saleable Area Statistics (Sq. ft.)

22420143 Total
Total
22420143
Booked
20914845
Available
1505299
Total 276 apartments in project. 254 apartments booked. 92% apartments booked.
Total 22420143 Sq.ft. saleable area. 20914845 saleable area booked.
93% area booked.

South And North Towers - Wing A And B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
South And North Towers - Wing A And BJun 20224712170588
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK6929.58 Sq.mts. ( 74590 Sq.ft. )48
44 Booked91% Booked
91% Booked
4 BHK17002.6 Sq.mts. ( 183016 Sq.ft. )82
77 Booked93% Booked
93% Booked
5 BHK1374 Sq.mts. ( 14790 Sq.ft. )4
2 Booked50% Booked
50% Booked
DUPLEXES2523.37 Sq.mts. ( 27162 Sq.ft. )8
4 Booked50% Booked
50% Booked
Studio Type 1595.98 Sq.mts. ( 6415 Sq.ft. )10
8 Booked80% Booked
80% Booked
Studio Type 22616.18 Sq.mts. ( 28161 Sq.ft. )124
119 Booked95% Booked
95% Booked
276 total apartments / 254 apartments booked. 92% apartments booked.
Work Description in Building South And North Towers - Wing A And BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress97% done
97% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress72% done
72% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress72% done
72% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress28% done
28% Booked
Sanitary Fittings within the flats / premises
work-in-progress28% done
28% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress97% done
97% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Kalpataru Limited
for Project
Kalpataru Avana
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation