Project overview

Kakkad is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800045780. Kakkad is located at 4647. This is a New being developed by Silver Land Developers Private Limited.

Kakkad has 3 BHK & 4 BHK Apartments with carpet areas ranging from 1416 to 3226 Sq.ft. Carpet. The Project has total 44 of which 24 are currently available for sale.

Kakkad is being developed on a total land area of 47860 Sq.ft. Kakkad has 1 Wings / Towers Silver Eternia

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Kakkad
  • Location:
  • 4647
  • Const. Stage:
    New
  • Possession:
    31 Dec 2026
Developer Details

  • Developer:
    Silver Land Developers Private Limited
  • Phone:
  • Address:
  • Sai Heritage
Project RERA Details
MAHA REARA No: P51800045780
Project Type Residential / Group Housing
RERA Project Status New
Architect Daisaria& Associates
Funding Bank ICICI BANK LIMITED
Proposed Possession 31 Dec 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 09 Jun 2022
Last Retrived 26 Jul 2025
Kakkad QR Code
Kakkad
MahaRERA - P51800045780
Apartment Details & Configuration
TypeArea
3 BHK131.57 Sq.mts. ( 1416 Sq.ft. )
4 BHK209.06 Sq.mts. ( 2250 Sq.ft. )
4 BHK237.59 Sq.mts. ( 2557 Sq.ft. )
4 BHK299.7 Sq.mts. ( 3226 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Kakkadlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space50% completed
50% Complete
0
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station10% completed
10% Complete
0
Energy management
0
Fire Protection And Fire Safety Requirements10% completed
10% Complete
0
Landscaping & Tree Planting10% completed
10% Complete
0
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)10% completed
10% Complete
0
Solid Waste Management And Disposal
0
Storm Water Drains10% completed
10% Complete
0
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water50% completed
50% Complete
0
Water Conservation, Rain water Harvesting60% completed
60% Complete
0
Water Supply25% completed
25% Complete
0
Buildings / Wings in Kakkad
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Kakkad by Silver Land Developers Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

47860 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

44 apartments in total
Total
44
Booked
20
Available
24

Saleable Area Statistics (Sq. ft.)

102965 Total
Total
102965
Booked
44519
Available
58446
Total 44 apartments in project. 20 apartments booked. 45% apartments booked.
Total 102965 Sq.ft. saleable area. 44519 saleable area booked.
43% area booked.

Silver Eternia

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Silver EterniaDec 20261512100130
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK131.57 Sq.mts. ( 1416 Sq.ft. )8
6 Booked75% Booked
75% Booked
4 BHK209.06 Sq.mts. ( 2250 Sq.ft. )21
8 Booked38% Booked
38% Booked
4 BHK237.59 Sq.mts. ( 2557 Sq.ft. )6
2 Booked33% Booked
33% Booked
4 BHK299.7 Sq.mts. ( 3226 Sq.ft. )9
4 Booked44% Booked
44% Booked
44 total apartments / 20 apartments booked. 45% apartments booked.
Work Description in Building Silver EterniaCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress40% done
40% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress40% done
40% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress49% done
49% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress25% done
25% Booked
Sanitary Fittings within the flats / premises
work-in-progress25% done
25% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress35% done
35% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress35% done
35% Booked
Stilt Floor
work-in-progress80% done
80% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Silver Land Developers Private Limited
for Project
Kakkad
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation