Project overview

Jp Regency Phase 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700013777. Jp Regency Phase 1 is located at S No 54 H No 4A, S No 57 H No 1Pt S No 57 H No 2Pt, S No 54 H No 3B. This is a New being developed by Jp Developers.

Jp Regency Phase 1 has 1 BHK & 2 BHK Apartments with carpet areas ranging from 196 to 534 Sq.ft. Carpet. The Project has total 407 of which 105 are currently available for sale.

Jp Regency Phase 1 is being developed on a total land area of 137603 Sq.ft. out of which 10957 Sq.ft. i.e 8% is reserved for recreational purposes. Jp Regency Phase 1 has 3 Wings / Towers Wing A,Wing B,Wing C

ProjectDeveloperLocationPossession
Patels Elysium - 6Apace RealtySurvey No 58 Hissa No 4/2, Survey No 58 Hissa No 6B, Plot - C30-12-2023 00:00:00
Patels Elysium - 1Apace RealtySurvey No 58 Hissa No 4/2, Survey No 58 Hissa No - 6B, Plot-C31-10-2019 00:00:00
Landscape GardenLandscape VenturesSurvey No 65 Hissa No 1P Survey No 65 Hissa No 2 Plot B30-11-2018 00:00:00
Patels Elysium - 7Apace RealtySurvey No 58 Hissa No 4/2, Survey No 58 Hissa No 6B, Plot - C30-12-2023 00:00:00
Project Details
  • Project:
    Jp Regency Phase 1
  • Location:
  • S No 54 H No 4A, S No 57 H No 1Pt S No 57 H No 2Pt, S No 54 H No 3B
  • Const. Stage:
    New
  • Possession:
    30 Jun 2021
Developer Details

  • Developer:
    Jp Developers
  • Phone:
  • Address:
  • Jp Regency
Project RERA Details
MAHA REARA No: P51700013777
Project Type Residential / Group Housing
RERA Project Status New
Architect Mahesh Jagtap And Associates
Funding Bank ICICI BANK LIMITED
Proposed Possession 30 Jun 2021
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 08 Sep 2021
Last Retrived 26 Jul 2025
Jp Regency Phase 1 QR Code
Jp Regency Phase 1
MahaRERA - P51700013777
Apartment Details & Configuration
TypeArea
1 BHK27.907 Sq.mts. ( 300 Sq.ft. )
1 BHK29.809 Sq.mts. ( 321 Sq.ft. )
1 BHK30.095 Sq.mts. ( 324 Sq.ft. )
1 BHK31.278 Sq.mts. ( 337 Sq.ft. )
1 BHK31.461 Sq.mts. ( 339 Sq.ft. )
1 BHK31.644 Sq.mts. ( 341 Sq.ft. )
1 BHK32.198 Sq.mts. ( 347 Sq.ft. )
1 BHK32.576 Sq.mts. ( 351 Sq.ft. )
1 BHK32.973 Sq.mts. ( 355 Sq.ft. )
1 BHK19.307 Sq.mts. ( 208 Sq.ft. )
2 BHK37.985 Sq.mts. ( 409 Sq.ft. )
2 BHK45.932 Sq.mts. ( 494 Sq.ft. )
2 BHK46.224 Sq.mts. ( 498 Sq.ft. )
SHOP20.488 Sq.mts. ( 221 Sq.ft. )
SHOP22.35 Sq.mts. ( 241 Sq.ft. )
SHOP23.212 Sq.mts. ( 250 Sq.ft. )
SHOP16.419 Sq.mts. ( 177 Sq.ft. )
SHOP16.794 Sq.mts. ( 181 Sq.ft. )
SHOP18.625 Sq.mts. ( 200 Sq.ft. )
1 BHK27.994 Sq.mts. ( 301 Sq.ft. )
1 BHK28.155 Sq.mts. ( 303 Sq.ft. )
1 BHK29.623 Sq.mts. ( 319 Sq.ft. )
1 BHK30.105 Sq.mts. ( 324 Sq.ft. )
1 BHK30.107 Sq.mts. ( 324 Sq.ft. )
1 BHK30.521 Sq.mts. ( 329 Sq.ft. )
1 BHK30.71 Sq.mts. ( 331 Sq.ft. )
1 BHK30.723 Sq.mts. ( 331 Sq.ft. )
1 BHK30.805 Sq.mts. ( 332 Sq.ft. )
1 BHK31.28 Sq.mts. ( 337 Sq.ft. )
1 BHK31.281 Sq.mts. ( 337 Sq.ft. )
1 BHK31.359 Sq.mts. ( 338 Sq.ft. )
1 BHK31.362 Sq.mts. ( 338 Sq.ft. )
1 BHK31.552 Sq.mts. ( 340 Sq.ft. )
1 BHK31.634 Sq.mts. ( 341 Sq.ft. )
1 BHK35.43 Sq.mts. ( 381 Sq.ft. )
1 BHK35.435 Sq.mts. ( 381 Sq.ft. )
1 BHK35.649 Sq.mts. ( 384 Sq.ft. )
1 BHK35.655 Sq.mts. ( 384 Sq.ft. )
1 RK22.416 Sq.mts. ( 241 Sq.ft. )
1RK21.855 Sq.mts. ( 235 Sq.ft. )
1RK22.049 Sq.mts. ( 237 Sq.ft. )
1RK22.217 Sq.mts. ( 239 Sq.ft. )
2 BHK42.345 Sq.mts. ( 456 Sq.ft. )
2 BHK42.618 Sq.mts. ( 459 Sq.ft. )
2 BHK43.068 Sq.mts. ( 464 Sq.ft. )
2 BHK43.138 Sq.mts. ( 464 Sq.ft. )
2 BHK50.188 Sq.mts. ( 540 Sq.ft. )
2 BHK50.385 Sq.mts. ( 542 Sq.ft. )
2 BHK50.408 Sq.mts. ( 543 Sq.ft. )
1 BHK18.237 Sq.mts. ( 196 Sq.ft. )
1 BHK19.85 Sq.mts. ( 214 Sq.ft. )
1 BHK20.675 Sq.mts. ( 223 Sq.ft. )
1 BHK22.704 Sq.mts. ( 244 Sq.ft. )
1 BHK23.657 Sq.mts. ( 255 Sq.ft. )
1 BHK23.747 Sq.mts. ( 256 Sq.ft. )
1 BHK23.955 Sq.mts. ( 258 Sq.ft. )
1 BHK24.015 Sq.mts. ( 258 Sq.ft. )
1 BHK26.769 Sq.mts. ( 288 Sq.ft. )
1 BHK27.916 Sq.mts. ( 300 Sq.ft. )
1 BHK30.288 Sq.mts. ( 326 Sq.ft. )
1 BHK30.637 Sq.mts. ( 330 Sq.ft. )
1 BHK31.06 Sq.mts. ( 334 Sq.ft. )
1 BHK31.323 Sq.mts. ( 337 Sq.ft. )
1 BHK31.772 Sq.mts. ( 342 Sq.ft. )
2 BHK48.098 Sq.mts. ( 518 Sq.ft. )
2 BHK49.443 Sq.mts. ( 532 Sq.ft. )
2 BHK49.608 Sq.mts. ( 534 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Jp Regency Phase 1last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Completed
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management100% completed
95% Complete
Completed
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed
Landscaping & Tree Planting100% completed
95% Complete
Completed
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Private Septic Tank
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply100% completed
95% Complete
Completed
Buildings / Wings in Jp Regency Phase 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Jp Regency Phase 1 by Jp Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

137603 Sq. ft.

Project Area

10957 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

407 apartments in total
Total
407
Booked
302
Available
105

Saleable Area Statistics (Sq. ft.)

136347 Total
Total
136347
Booked
101940
Available
34408
Total 407 apartments in project. 302 apartments booked. 74% apartments booked.
Total 136347 Sq.ft. saleable area. 101940 saleable area booked.
75% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing ADec 2020131010016
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.907 Sq.mts. ( 300 Sq.ft. )12
12 Booked100% Booked
100% Booked
1 BHK29.809 Sq.mts. ( 321 Sq.ft. )11
None Booked0% Booked
0% Booked
1 BHK30.095 Sq.mts. ( 324 Sq.ft. )12
12 Booked100% Booked
100% Booked
1 BHK31.278 Sq.mts. ( 337 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK31.461 Sq.mts. ( 339 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK31.644 Sq.mts. ( 341 Sq.ft. )12
10 Booked83% Booked
83% Booked
1 BHK32.198 Sq.mts. ( 347 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK32.576 Sq.mts. ( 351 Sq.ft. )8
8 Booked100% Booked
100% Booked
1 BHK32.973 Sq.mts. ( 355 Sq.ft. )12
12 Booked100% Booked
100% Booked
1 BHK19.307 Sq.mts. ( 208 Sq.ft. )12
10 Booked83% Booked
83% Booked
2 BHK37.985 Sq.mts. ( 409 Sq.ft. )12
4 Booked33% Booked
33% Booked
2 BHK45.932 Sq.mts. ( 494 Sq.ft. )6
5 Booked83% Booked
83% Booked
2 BHK46.224 Sq.mts. ( 498 Sq.ft. )6
6 Booked100% Booked
100% Booked
SHOP20.488 Sq.mts. ( 221 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP22.35 Sq.mts. ( 241 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP23.212 Sq.mts. ( 250 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP16.419 Sq.mts. ( 177 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP16.794 Sq.mts. ( 181 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP18.625 Sq.mts. ( 200 Sq.ft. )1
None Booked0% Booked
0% Booked
127 total apartments / 97 apartments booked. 76% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BDec 2020121010027
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.994 Sq.mts. ( 301 Sq.ft. )11
11 Booked100% Booked
100% Booked
1 BHK28.155 Sq.mts. ( 303 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK29.623 Sq.mts. ( 319 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK30.105 Sq.mts. ( 324 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK30.107 Sq.mts. ( 324 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK30.521 Sq.mts. ( 329 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK30.71 Sq.mts. ( 331 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK30.723 Sq.mts. ( 331 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK30.805 Sq.mts. ( 332 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK31.278 Sq.mts. ( 337 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK31.28 Sq.mts. ( 337 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK31.281 Sq.mts. ( 337 Sq.ft. )10
8 Booked80% Booked
80% Booked
1 BHK31.359 Sq.mts. ( 338 Sq.ft. )5
5 Booked100% Booked
100% Booked
1 BHK31.362 Sq.mts. ( 338 Sq.ft. )21
18 Booked85% Booked
85% Booked
1 BHK31.552 Sq.mts. ( 340 Sq.ft. )5
5 Booked100% Booked
100% Booked
1 BHK31.634 Sq.mts. ( 341 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK35.43 Sq.mts. ( 381 Sq.ft. )5
5 Booked100% Booked
100% Booked
1 BHK35.435 Sq.mts. ( 381 Sq.ft. )5
5 Booked100% Booked
100% Booked
1 BHK35.649 Sq.mts. ( 384 Sq.ft. )6
2 Booked33% Booked
33% Booked
1 BHK35.655 Sq.mts. ( 384 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 RK22.416 Sq.mts. ( 241 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK21.855 Sq.mts. ( 235 Sq.ft. )2
2 Booked100% Booked
100% Booked
1RK22.049 Sq.mts. ( 237 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK22.217 Sq.mts. ( 239 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK42.345 Sq.mts. ( 456 Sq.ft. )6
2 Booked33% Booked
33% Booked
2 BHK42.618 Sq.mts. ( 459 Sq.ft. )5
1 Booked20% Booked
20% Booked
2 BHK43.068 Sq.mts. ( 464 Sq.ft. )5
5 Booked100% Booked
100% Booked
2 BHK43.138 Sq.mts. ( 464 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK50.188 Sq.mts. ( 540 Sq.ft. )5
5 Booked100% Booked
100% Booked
2 BHK50.385 Sq.mts. ( 542 Sq.ft. )5
5 Booked100% Booked
100% Booked
2 BHK50.408 Sq.mts. ( 543 Sq.ft. )1
1 Booked100% Booked
100% Booked
141 total apartments / 117 apartments booked. 82% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CDec 2020131010021
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK18.237 Sq.mts. ( 196 Sq.ft. )11
8 Booked72% Booked
72% Booked
1 BHK19.85 Sq.mts. ( 214 Sq.ft. )11
7 Booked63% Booked
63% Booked
1 BHK20.675 Sq.mts. ( 223 Sq.ft. )11
10 Booked90% Booked
90% Booked
1 BHK22.704 Sq.mts. ( 244 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK23.657 Sq.mts. ( 255 Sq.ft. )4
3 Booked75% Booked
75% Booked
1 BHK23.747 Sq.mts. ( 256 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK23.955 Sq.mts. ( 258 Sq.ft. )12
10 Booked83% Booked
83% Booked
1 BHK24.015 Sq.mts. ( 258 Sq.ft. )12
4 Booked33% Booked
33% Booked
1 BHK26.769 Sq.mts. ( 288 Sq.ft. )11
8 Booked72% Booked
72% Booked
1 BHK27.916 Sq.mts. ( 300 Sq.ft. )12
6 Booked50% Booked
50% Booked
1 BHK30.288 Sq.mts. ( 326 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK30.637 Sq.mts. ( 330 Sq.ft. )12
1 BHK31.06 Sq.mts. ( 334 Sq.ft. )5
4 Booked80% Booked
80% Booked
1 BHK31.323 Sq.mts. ( 337 Sq.ft. )6
5 Booked83% Booked
83% Booked
1 BHK31.772 Sq.mts. ( 342 Sq.ft. )12
7 Booked58% Booked
58% Booked
2 BHK48.098 Sq.mts. ( 518 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK49.443 Sq.mts. ( 532 Sq.ft. )5
3 Booked60% Booked
60% Booked
2 BHK49.608 Sq.mts. ( 534 Sq.ft. )6
4 Booked66% Booked
66% Booked
139 total apartments / 88 apartments booked. 63% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Jp Developers
for Project
Jp Regency Phase 1
last updated on 26 Jul 2025 as per information obtained from MARA RERA.