Project overview

Jp Decks is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800001488. Jp Decks is located at Survey No 267 Hissa No 1-1 Pt Cts Nos 610A-1A-1B And 610-1A-1A Pt Of Vil Malad-E Tal-Borivili Mumbai. This is a Ongoing being developed by Jp Infra (Mumbai) Pvt. Ltd..

Jp Decks has Type 1 & Type 2 Apartments with carpet areas ranging from 551 to 797 Sq.ft. Carpet. The Project has total 375 of which 22 are currently available for sale.

Jp Decks is being developed on a total land area of 146433 Sq.ft. out of which 8801 Sq.ft. i.e 6% is reserved for recreational purposes. Jp Decks has 1 Wings / Towers Jp Decks

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Jp Decks
  • Location:
  • Survey No 267 Hissa No 1-1 Pt Cts Nos 610A-1A-1B And 610-1A-1A Pt Of Vil Malad-E Tal-Borivili Mumbai
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    Jp Infra (Mumbai) Pvt. Ltd.
  • Phone:
  • Address:
  • Viraj Towers
Project RERA Details
MAHA REARA No: P51800001488
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Rajesh Khandeparkar Of M/S V.S. Vaidya And Associates
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession
Litigations No Litigations
Last Modified 28 Jul 2017
Last Retrived 26 Jul 2025
Jp Decks QR Code
Jp Decks
MahaRERA - P51800001488
Apartment Details & Configuration
TypeArea
Type 151.22 Sq.mts. ( 551 Sq.ft. )
Type 274.07 Sq.mts. ( 797 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Jp Deckslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Ongoing
Amphitheatre
Ongoing
Car Washing Facility85% completed
85% Complete
Ongoing
Community Buildings
Na
DG Set80% completed
80% Complete
Ongoing
Drivers Toilet60% completed
60% Complete
Ongoing
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Ongoing
Energy management75% completed
75% Complete
Ongoing
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Ongoing
Fitness Centre85% completed
85% Complete
Ongoing
Kids Play Area
Ongoing
Landscaping & Tree Planting65% completed
65% Complete
Ongoing
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)98% completed
98% Complete
Ongoing
Solid Waste Management And Disposal100% completed
95% Complete
Ongoing
Storm Water Drains100% completed
95% Complete
Ongoing
Street Lighting
Ongoing
Swimming Pool85% completed
85% Complete
Ongoing
Treatment And Disposal Of Sewage And Sullage Water98% completed
98% Complete
Ongoing
Water Conservation, Rain water Harvesting95% completed
95% Complete
Ongoing
Water Supply95% completed
95% Complete
Ongoing
Buildings / Wings in Jp Decks
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Jp Decks by Jp Infra (Mumbai) Pvt. Ltd.last updated on 26 Jul 2025 as per information obtained from MARA RERA.

146433 Sq. ft.

Project Area

8801 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

375 apartments in total
Total
375
Booked
353
Available
22

Saleable Area Statistics (Sq. ft.)

225934 Total
Total
225934
Booked
213067
Available
12867
Total 375 apartments in project. 353 apartments booked. 94% apartments booked.
Total 225934 Sq.ft. saleable area. 213067 saleable area booked.
94% area booked.

Jp Decks

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Jp DecksDec 20193911130494
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Type 151.22 Sq.mts. ( 551 Sq.ft. )297
278 Booked93% Booked
93% Booked
Type 274.07 Sq.mts. ( 797 Sq.ft. )78
75 Booked96% Booked
96% Booked
375 total apartments / 353 apartments booked. 94% apartments booked.
Work Description in Building Jp DecksCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Jp Infra (Mumbai) Pvt. Ltd.
for Project
Jp Decks
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation