Project overview

Joyville Virar Phase 4 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000019538. Joyville Virar Phase 4 is located at 390 B. This is a New being developed by Joyville Shapoorji Housing Private Limited.

Joyville Virar Phase 4 has 1 RHK & 2 RHK Apartments with carpet areas ranging from 355 to 524 Sq.ft. Carpet. The Project has total 184 of which 184 are currently available for sale.

Joyville Virar Phase 4 is being developed on a total land area of 9545 Sq.ft. out of which 50162 Sq.ft. i.e 526% is reserved for recreational purposes. Joyville Virar Phase 4 has 1 Wings / Towers Palm Meadows - 2

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Joyville Virar Phase 4
  • Location:
  • 390 B
  • Const. Stage:
    New
  • Possession:
    30 Jan 2024
Developer Details

  • Developer:
    Joyville Shapoorji Housing Private Limited
  • Phone:
  • Address:
  • Sp Centre
Project RERA Details
MAHA REARA No: P99000019538
Project Type Residential / Group Housing
RERA Project Status New
Architect En Con Architects And Consultant
Funding Bank RBL Bank Limited
Proposed Possession 30 Jan 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 08 Feb 2019
Last Retrived 28 Jul 2025
Joyville Virar Phase 4 QR Code
Joyville Virar Phase 4
MahaRERA - P99000019538
Apartment Details & Configuration
TypeArea
1 RHK33.02 Sq.mts. ( 355 Sq.ft. )
2 RHK48.67 Sq.mts. ( 524 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Joyville Virar Phase 4last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
.Shared Space To Be Delivered On Layout Completion
Club House95% completed
95% Complete
To Be Handed Over On Completion Of Layout
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
.No Receiving Substation
Energy management
.As Per Moef Requirement
Fire Protection And Fire Safety Requirements
As Per Cfo Noc
Landscaping & Tree Planting
Available
Open Parking
.Part Of Layout With Other Buildings
Sewerage (Chamber, Lines, Septic Tank , STP)95% completed
95% Complete
Available
Solid Waste Management And Disposal
.Available
Storm Water Drains
Available
Street Lighting
.Available
Treatment And Disposal Of Sewage And Sullage Water
.Available
Water Conservation, Rain water Harvesting
Available
Water Supply
.Available
Buildings / Wings in Joyville Virar Phase 4
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Joyville Virar Phase 4 by Joyville Shapoorji Housing Private Limitedlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

9545 Sq. ft.

Project Area

50162 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

184 apartments in total
Total
184
Booked
0
Available
184

Saleable Area Statistics (Sq. ft.)

80897 Total
Total
80897
Booked
0
Available
80897
Total 184 apartments in project. 0 apartments booked. 0% apartments booked.
Total 80897 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Palm Meadows - 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Palm Meadows - 2Jan 2023241010201
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 RHK33.02 Sq.mts. ( 355 Sq.ft. )92
None Booked0% Booked
0% Booked
2 RHK48.67 Sq.mts. ( 524 Sq.ft. )92
None Booked0% Booked
0% Booked
184 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Palm Meadows - 2Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Joyville Shapoorji Housing Private Limited
for Project
Joyville Virar Phase 4
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation