Project overview

Joyville Virar Phase 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900000444. Joyville Virar Phase 1 is located at 390B. This is a Ongoing being developed by Joyville Shapoorji Housing Private Limited.

Joyville Virar Phase 1 has Residential Apartments with carpet areas ranging from 526 to 716 Sq.ft. Carpet. The Project has total 308 of which 0 are currently available for sale.

Joyville Virar Phase 1 is being developed on a total land area of 32116 Sq.ft. out of which 50162 Sq.ft. i.e 156% is reserved for recreational purposes. Joyville Virar Phase 1 has 2 Wings / Towers Pinnacle,Summit

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Joyville Virar Phase 1
  • Location:
  • 390B
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2022
Developer Details

  • Developer:
    Joyville Shapoorji Housing Private Limited
  • Phone:
  • Address:
  • Sp Centre
Project RERA Details
MAHA REARA No: P51900000444
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect M/S.En-Con Arch. & Structural Project Consultants
Funding Bank RBL Bank Limited
Proposed Possession 30 Jun 2022
Revised Possession 30 Jun 2022
Extended Possession
Litigations No Litigations
Last Modified 17 Jul 2017
Last Retrived 28 Jul 2025
Joyville Virar Phase 1 QR Code
Joyville Virar Phase 1
MahaRERA - P51900000444
Apartment Details & Configuration
TypeArea
Residential49.36 Sq.mts. ( 531 Sq.ft. )
Residential55.99 Sq.mts. ( 603 Sq.ft. )
Residential48.9 Sq.mts. ( 526 Sq.ft. )
Residential54.09 Sq.mts. ( 582 Sq.ft. )
Residential66.52 Sq.mts. ( 716 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Joyville Virar Phase 1last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
To Be Handed Over On Completion Of Layout
Club House100% completed
95% Complete
To Be Handed Over On Completion Of Layout
Community Buildings
Na
Covered Parking100% completed
95% Complete
Podium Parking To Be Shared With Future Phases
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
No Receiving Substation
Energy management100% completed
95% Complete
As Per Moef Requirement
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Available
Landscaping & Tree Planting100% completed
95% Complete
Available
Open Parking100% completed
95% Complete
Available
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Available
Solid Waste Management And Disposal100% completed
95% Complete
Available
Storm Water Drains100% completed
95% Complete
Available
Street Lighting100% completed
95% Complete
Available
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Available
Water Conservation, Rain water Harvesting100% completed
95% Complete
Available
Water Supply100% completed
95% Complete
Available
Buildings / Wings in Joyville Virar Phase 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Joyville Virar Phase 1 by Joyville Shapoorji Housing Private Limitedlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

32116 Sq. ft.

Project Area

50162 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

308 apartments in total
Total
308
Booked
308
Available
0

Saleable Area Statistics (Sq. ft.)

180074 Total
Total
180074
Booked
180074
Available
0
Total 308 apartments in project. 308 apartments booked. 100% apartments booked.
Total 180074 Sq.ft. saleable area. 180074 saleable area booked.
100% area booked.

Pinnacle

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
PinnacleJun 20212310104488
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential49.36 Sq.mts. ( 531 Sq.ft. )88
88 Booked100% Booked
100% Booked
Residential55.99 Sq.mts. ( 603 Sq.ft. )88
88 Booked100% Booked
100% Booked
176 total apartments / 176 apartments booked. 100% apartments booked.
Work Description in Building PinnacleCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Summit

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
SummitJun 20212310102288
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential48.9 Sq.mts. ( 526 Sq.ft. )44
44 Booked100% Booked
100% Booked
Residential54.09 Sq.mts. ( 582 Sq.ft. )44
44 Booked100% Booked
100% Booked
Residential66.52 Sq.mts. ( 716 Sq.ft. )44
44 Booked100% Booked
100% Booked
132 total apartments / 132 apartments booked. 100% apartments booked.
Work Description in Building SummitCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Joyville Shapoorji Housing Private Limited
for Project
Joyville Virar Phase 1
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation