Project overview

Joy Legend Wing B is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800003263. Joy Legend Wing B is located at Cts No 99A Pt E86 12 Pt E99 B Pt. This is a Ongoing being developed by Bhavin Jayant Soni.

Joy Legend Wing B has 3 BHK & 4 BHK Apartments with carpet areas ranging from 1851 to 3490 Sq.ft. Carpet. The Project has total 88 of which 59 are currently available for sale.

Joy Legend Wing B is being developed on a total land area of 27486 Sq.ft. out of which 7003 Sq.ft. i.e 25% is reserved for recreational purposes. Joy Legend Wing B has 1 Wings / Towers Joy Legend Wing B

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Joy Legend Wing B
  • Location:
  • Cts No 99A Pt E86 12 Pt E99 B Pt
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    Bhavin Jayant Soni
  • Phone:
  • Address:
  • Joy Aashiana Ground Floor, Azad Nagar Co -Op Society
Project RERA Details
MAHA REARA No: P51800003263
Project Type Residential / Group Housing
RERA Project Status Ongoing
Funding Bank AXIS BANK
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession 30 Jun 2025
Litigations No Litigations
Last Modified 04 Jul 2025
Last Retrived 26 Jul 2025
Joy Legend Wing B QR Code
Joy Legend Wing B
MahaRERA - P51800003263
Apartment Details & Configuration
TypeArea
3 BHK171.92 Sq.mts. ( 1851 Sq.ft. )
3 BHK172.33 Sq.mts. ( 1855 Sq.ft. )
3 BHK172.42 Sq.mts. ( 1856 Sq.ft. )
3 BHK176.29 Sq.mts. ( 1898 Sq.ft. )
4 BHK202.62 Sq.mts. ( 2181 Sq.ft. )
4 BHK324.22 Sq.mts. ( 3490 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Joy Legend Wing Blast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
To Be Done Before Bldg 2
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station5% completed
5% Complete
To Be Done Before Bldg 2
Energy management
To Be Done Before Bldg 2
Fire Protection And Fire Safety Requirements
To Be Done Before Bldg 2
Landscaping & Tree Planting
To Be Done Before Bldg 2
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
To Be Done Before Bldg 2
Solid Waste Management And Disposal
To Be Done Before Bldg 2
Storm Water Drains10% completed
10% Complete
To Be Done Before Bldg 2
Street Lighting
To Be Done Before Bldg 2
Treatment And Disposal Of Sewage And Sullage Water
To Be Done Before Bldg 2
Water Conservation, Rain water Harvesting20% completed
20% Complete
To Be Done Before Bldg 2
Water Supply
To Be Done Before Bldg 2
Buildings / Wings in Joy Legend Wing B
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Joy Legend Wing B by Bhavin Jayant Sonilast updated on 26 Jul 2025 as per information obtained from MARA RERA.

27486 Sq. ft.

Project Area

7003 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

88 apartments in total
Total
88
Booked
29
Available
59

Saleable Area Statistics (Sq. ft.)

169853 Total
Total
169853
Booked
55991
Available
113863
Total 88 apartments in project. 29 apartments booked. 32% apartments booked.
Total 169853 Sq.ft. saleable area. 55991 saleable area booked.
33% area booked.

Joy Legend Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Joy Legend Wing BJun 20252013110220
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK171.92 Sq.mts. ( 1851 Sq.ft. )19
5 Booked26% Booked
26% Booked
3 BHK172.33 Sq.mts. ( 1855 Sq.ft. )18
5 Booked27% Booked
27% Booked
3 BHK172.42 Sq.mts. ( 1856 Sq.ft. )18
7 Booked38% Booked
38% Booked
3 BHK176.29 Sq.mts. ( 1898 Sq.ft. )19
6 Booked31% Booked
31% Booked
4 BHK202.62 Sq.mts. ( 2181 Sq.ft. )13
6 Booked46% Booked
46% Booked
4 BHK324.22 Sq.mts. ( 3490 Sq.ft. )1
None Booked0% Booked
0% Booked
88 total apartments / 29 apartments booked. 32% apartments booked.
Work Description in Building Joy Legend Wing BCompletion
Basement (if any)
work-in-progress75% done
75% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress35% done
35% Booked
Plinth
work-in-progress80% done
80% Booked
Podiums (if any)
work-in-progress75% done
75% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress29% done
29% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress45% done
45% Booked
Stilt Floor
work-in-progress80% done
80% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress75% done
75% Booked
X number of Podiums
work-in-progress80% done
80% Booked
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Bhavin Jayant Soni
for Project
Joy Legend Wing B
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation