Project overview

Jewel Heights is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700016400. Jewel Heights is located at Plot No 2 Of Gut No 25 Hissa No 1A, 1B. This is a New being developed by Jewel Builders And Infraprojects Ltd.

Jewel Heights has 1 BHK Apartments with carpet areas ranging from 321 to 374 Sq.ft. Carpet. The Project has total 369 of which 25 are currently available for sale.

Jewel Heights is being developed on a total land area of 67652 Sq.ft. Jewel Heights has 4 Wings / Towers Building 1,Building No 2,Building No 3,Building No 4

ProjectDeveloperLocationPossession
Atmiya HeightsAkshar GroupGat No 76130-12-2025 00:00:00
Shreeji Nisarg Phase IShreeji DevelopersPlot No 1 Part, Survey No 119/1C, 119/2B30-12-2022 00:00:00
Trishul Golden VilleA Plus Life SpaceS.No. 87/2/B/1, S.No. 87/2/D, S.No. 87/2/K/226-12-2022 00:00:00
Jewel HeightsJewel Builders And Infraprojects LtdPlot No 2 Of Gut No 25 Hissa No 1A, 1B30-12-2023 00:00:00
Project Details
  • Project:
    Jewel Heights
  • Location:
  • Plot No 2 Of Gut No 25 Hissa No 1A, 1B
  • Const. Stage:
    New
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Jewel Builders And Infraprojects Ltd
  • Phone:
  • Address:
  • Pushpak Apt
Project RERA Details
MAHA REARA No: P51700016400
Project Type Residential / Group Housing
RERA Project Status New
Funding Bank BANK OF INDIA
Proposed Possession 30 Dec 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 10 May 2018
Last Retrived 26 Jul 2025
Jewel Heights QR Code
Jewel Heights
MahaRERA - P51700016400
Apartment Details & Configuration
TypeArea
1 BHK36.36 Sq.mts. ( 391 Sq.ft. )
1 BHK36.37 Sq.mts. ( 391 Sq.ft. )
1 BHK36.4 Sq.mts. ( 392 Sq.ft. )
1 BHK36.45 Sq.mts. ( 392 Sq.ft. )
1 BHK36.46 Sq.mts. ( 392 Sq.ft. )
1 BHK36.85 Sq.mts. ( 397 Sq.ft. )
2 BHK41.55 Sq.mts. ( 447 Sq.ft. )
2 BHK42.2 Sq.mts. ( 454 Sq.ft. )
2 BHK47.68 Sq.mts. ( 513 Sq.ft. )
2 BHK47.85 Sq.mts. ( 515 Sq.ft. )
2 BHK47.88 Sq.mts. ( 515 Sq.ft. )
2 BHK50.75 Sq.mts. ( 546 Sq.ft. )
2 BHK50.77 Sq.mts. ( 546 Sq.ft. )
2 BHK51.61 Sq.mts. ( 556 Sq.ft. )
2 BHK51.66 Sq.mts. ( 556 Sq.ft. )
2 BHK51.77 Sq.mts. ( 557 Sq.ft. )
2 BHK51.81 Sq.mts. ( 558 Sq.ft. )
2 BHK52.62 Sq.mts. ( 566 Sq.ft. )
Shop7.21 Sq.mts. ( 78 Sq.ft. )
Shop7.74 Sq.mts. ( 83 Sq.ft. )
Shop10.06 Sq.mts. ( 108 Sq.ft. )
Shop10.2 Sq.mts. ( 110 Sq.ft. )
Shop11.47 Sq.mts. ( 123 Sq.ft. )
Shop11.89 Sq.mts. ( 128 Sq.ft. )
Shop11.98 Sq.mts. ( 129 Sq.ft. )
Shop12.17 Sq.mts. ( 131 Sq.ft. )
Shop12.31 Sq.mts. ( 133 Sq.ft. )
Shop13.51 Sq.mts. ( 145 Sq.ft. )
Shop13.68 Sq.mts. ( 147 Sq.ft. )
Shop14.78 Sq.mts. ( 159 Sq.ft. )
Shop15.33 Sq.mts. ( 165 Sq.ft. )
Shop15.83 Sq.mts. ( 170 Sq.ft. )
Shop15.88 Sq.mts. ( 171 Sq.ft. )
Shop15.91 Sq.mts. ( 171 Sq.ft. )
Shop16.59 Sq.mts. ( 179 Sq.ft. )
Shop17.52 Sq.mts. ( 189 Sq.ft. )
Shop17.63 Sq.mts. ( 190 Sq.ft. )
1 BHK29.93 Sq.mts. ( 322 Sq.ft. )
1 BHK31.85 Sq.mts. ( 343 Sq.ft. )
1 BHK32.75 Sq.mts. ( 353 Sq.ft. )
1 BHK32.93 Sq.mts. ( 354 Sq.ft. )
1 BHK34.89 Sq.mts. ( 376 Sq.ft. )
1 BHK35.02 Sq.mts. ( 377 Sq.ft. )
1 BHK35.12 Sq.mts. ( 378 Sq.ft. )
1 BHK35.33 Sq.mts. ( 380 Sq.ft. )
1 BHK35.38 Sq.mts. ( 381 Sq.ft. )
1 BHK35.43 Sq.mts. ( 381 Sq.ft. )
1 BHK35.52 Sq.mts. ( 382 Sq.ft. )
1 BHK35.82 Sq.mts. ( 386 Sq.ft. )
1 BHK35.83 Sq.mts. ( 386 Sq.ft. )
1 BHK37.92 Sq.mts. ( 408 Sq.ft. )
1 BHK38.43 Sq.mts. ( 414 Sq.ft. )
Shop33.99 Sq.mts. ( 366 Sq.ft. )
Shop9.25 Sq.mts. ( 100 Sq.ft. )
Shop11.68 Sq.mts. ( 126 Sq.ft. )
Shop12.95 Sq.mts. ( 139 Sq.ft. )
Shop14.25 Sq.mts. ( 153 Sq.ft. )
Shop18.95 Sq.mts. ( 204 Sq.ft. )
1 BHK29.36 Sq.mts. ( 316 Sq.ft. )
1 BHK29.94 Sq.mts. ( 322 Sq.ft. )
1 BHK30.36 Sq.mts. ( 327 Sq.ft. )
1 BHK30.42 Sq.mts. ( 327 Sq.ft. )
1 BHK31.86 Sq.mts. ( 343 Sq.ft. )
1 BHK32.43 Sq.mts. ( 349 Sq.ft. )
1 BHK32.44 Sq.mts. ( 349 Sq.ft. )
1 BHK32.7 Sq.mts. ( 352 Sq.ft. )
1 BHK33.35 Sq.mts. ( 359 Sq.ft. )
1 BHK33.36 Sq.mts. ( 359 Sq.ft. )
1 BHK33.62 Sq.mts. ( 362 Sq.ft. )
1 BHK33.78 Sq.mts. ( 364 Sq.ft. )
1 BHK34.63 Sq.mts. ( 373 Sq.ft. )
1 BHK39.2 Sq.mts. ( 422 Sq.ft. )
1 BHK39.3 Sq.mts. ( 423 Sq.ft. )
1 BHK29.8 Sq.mts. ( 321 Sq.ft. )
1 BHK29.89 Sq.mts. ( 322 Sq.ft. )
1 BHK30.04 Sq.mts. ( 323 Sq.ft. )
1 BHK30.86 Sq.mts. ( 332 Sq.ft. )
1 BHK31.65 Sq.mts. ( 341 Sq.ft. )
1 BHK32.64 Sq.mts. ( 351 Sq.ft. )
1 BHK32.67 Sq.mts. ( 352 Sq.ft. )
1 BHK32.82 Sq.mts. ( 353 Sq.ft. )
1 BHK33.07 Sq.mts. ( 356 Sq.ft. )
1 BHK33.84 Sq.mts. ( 364 Sq.ft. )
1 BHK34.3 Sq.mts. ( 369 Sq.ft. )
1 BHK34.32 Sq.mts. ( 369 Sq.ft. )
1 BHK34.53 Sq.mts. ( 372 Sq.ft. )
1 BHK34.75 Sq.mts. ( 374 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Jewel Heightslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Electrical Meter Room
Energy management100% completed
95% Complete
As Per Completion Certificate
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Completion Certificate
Landscaping & Tree Planting100% completed
95% Complete
As Per Completion Certificate
Open Parking100% completed
95% Complete
As Per Plan Sanctioned
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Municipal Sewerage Line
Solid Waste Management And Disposal100% completed
95% Complete
Disposal Through Municipal Systems
Storm Water Drains100% completed
95% Complete
As Per Completion Certificate
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
As Per Completion Certificate
Water Supply100% completed
95% Complete
Water Pipe Line By Mjp
Buildings / Wings in Jewel Heights
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Jewel Heights by Jewel Builders And Infraprojects Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

67652 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

369 apartments in total
Total
369
Booked
344
Available
25

Saleable Area Statistics (Sq. ft.)

134054 Total
Total
134054
Booked
121509
Available
12545
Total 369 apartments in project. 344 apartments booked. 93% apartments booked.
Total 134054 Sq.ft. saleable area. 121509 saleable area booked.
91% area booked.

Building 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 1Dec 202271000240
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.36 Sq.mts. ( 391 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK36.37 Sq.mts. ( 391 Sq.ft. )4
3 Booked75% Booked
75% Booked
1 BHK36.4 Sq.mts. ( 392 Sq.ft. )3
1 Booked33% Booked
33% Booked
1 BHK36.45 Sq.mts. ( 392 Sq.ft. )6
5 Booked83% Booked
83% Booked
1 BHK36.46 Sq.mts. ( 392 Sq.ft. )8
8 Booked100% Booked
100% Booked
1 BHK36.85 Sq.mts. ( 397 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK41.55 Sq.mts. ( 447 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK42.2 Sq.mts. ( 454 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK47.68 Sq.mts. ( 513 Sq.ft. )3
1 Booked33% Booked
33% Booked
2 BHK47.85 Sq.mts. ( 515 Sq.ft. )3
2 Booked66% Booked
66% Booked
2 BHK47.88 Sq.mts. ( 515 Sq.ft. )3
2 Booked66% Booked
66% Booked
2 BHK50.75 Sq.mts. ( 546 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK50.77 Sq.mts. ( 546 Sq.ft. )4
3 Booked75% Booked
75% Booked
2 BHK51.61 Sq.mts. ( 556 Sq.ft. )3
1 Booked33% Booked
33% Booked
2 BHK51.66 Sq.mts. ( 556 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK51.77 Sq.mts. ( 557 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK51.81 Sq.mts. ( 558 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK52.62 Sq.mts. ( 566 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop7.21 Sq.mts. ( 78 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop7.74 Sq.mts. ( 83 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop10.06 Sq.mts. ( 108 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop10.2 Sq.mts. ( 110 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop11.47 Sq.mts. ( 123 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop11.89 Sq.mts. ( 128 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop11.98 Sq.mts. ( 129 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop12.17 Sq.mts. ( 131 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop12.31 Sq.mts. ( 133 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop13.51 Sq.mts. ( 145 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop13.68 Sq.mts. ( 147 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop14.78 Sq.mts. ( 159 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop15.33 Sq.mts. ( 165 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop15.83 Sq.mts. ( 170 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop15.88 Sq.mts. ( 171 Sq.ft. )4
4 Booked100% Booked
100% Booked
Shop15.91 Sq.mts. ( 171 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop16.59 Sq.mts. ( 179 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop17.52 Sq.mts. ( 189 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop17.63 Sq.mts. ( 190 Sq.ft. )1
1 Booked100% Booked
100% Booked
84 total apartments / 62 apartments booked. 73% apartments booked.
Work Description in Building Building 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2Dec 20221510001000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.93 Sq.mts. ( 322 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK31.85 Sq.mts. ( 343 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK32.75 Sq.mts. ( 353 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK32.93 Sq.mts. ( 354 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK34.89 Sq.mts. ( 376 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK35.02 Sq.mts. ( 377 Sq.ft. )13
13 Booked100% Booked
100% Booked
1 BHK35.12 Sq.mts. ( 378 Sq.ft. )15
15 Booked100% Booked
100% Booked
1 BHK35.33 Sq.mts. ( 380 Sq.ft. )8
8 Booked100% Booked
100% Booked
1 BHK35.38 Sq.mts. ( 381 Sq.ft. )8
7 Booked87% Booked
87% Booked
1 BHK35.43 Sq.mts. ( 381 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK35.52 Sq.mts. ( 382 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK35.82 Sq.mts. ( 386 Sq.ft. )14
14 Booked100% Booked
100% Booked
1 BHK35.83 Sq.mts. ( 386 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK37.92 Sq.mts. ( 408 Sq.ft. )8
8 Booked100% Booked
100% Booked
1 BHK38.43 Sq.mts. ( 414 Sq.ft. )8
8 Booked100% Booked
100% Booked
Shop33.99 Sq.mts. ( 366 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop9.25 Sq.mts. ( 100 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop11.68 Sq.mts. ( 126 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop12.95 Sq.mts. ( 139 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop14.25 Sq.mts. ( 153 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop18.95 Sq.mts. ( 204 Sq.ft. )1
1 Booked100% Booked
100% Booked
112 total apartments / 111 apartments booked. 99% apartments booked.
Work Description in Building Building No 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 3Dec 20221210001000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.36 Sq.mts. ( 316 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK29.93 Sq.mts. ( 322 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK29.94 Sq.mts. ( 322 Sq.ft. )10
10 Booked100% Booked
100% Booked
1 BHK30.36 Sq.mts. ( 327 Sq.ft. )10
10 Booked100% Booked
100% Booked
1 BHK30.42 Sq.mts. ( 327 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK31.86 Sq.mts. ( 343 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK32.43 Sq.mts. ( 349 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK32.44 Sq.mts. ( 349 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK32.7 Sq.mts. ( 352 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK32.75 Sq.mts. ( 353 Sq.ft. )14
14 Booked100% Booked
100% Booked
1 BHK33.35 Sq.mts. ( 359 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK33.36 Sq.mts. ( 359 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK33.62 Sq.mts. ( 362 Sq.ft. )10
10 Booked100% Booked
100% Booked
1 BHK33.78 Sq.mts. ( 364 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK34.63 Sq.mts. ( 373 Sq.ft. )8
6 Booked75% Booked
75% Booked
1 BHK35.02 Sq.mts. ( 377 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK35.38 Sq.mts. ( 381 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK35.82 Sq.mts. ( 386 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK39.2 Sq.mts. ( 422 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK39.3 Sq.mts. ( 423 Sq.ft. )3
3 Booked100% Booked
100% Booked
86 total apartments / 84 apartments booked. 97% apartments booked.
Work Description in Building Building No 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 4Dec 20221210001100
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.8 Sq.mts. ( 321 Sq.ft. )5
5 Booked100% Booked
100% Booked
1 BHK29.89 Sq.mts. ( 322 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK29.94 Sq.mts. ( 322 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK30.04 Sq.mts. ( 323 Sq.ft. )11
11 Booked100% Booked
100% Booked
1 BHK30.36 Sq.mts. ( 327 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK30.86 Sq.mts. ( 332 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK31.65 Sq.mts. ( 341 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK31.86 Sq.mts. ( 343 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK32.64 Sq.mts. ( 351 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK32.67 Sq.mts. ( 352 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK32.7 Sq.mts. ( 352 Sq.ft. )11
11 Booked100% Booked
100% Booked
1 BHK32.82 Sq.mts. ( 353 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK33.07 Sq.mts. ( 356 Sq.ft. )5
5 Booked100% Booked
100% Booked
1 BHK33.84 Sq.mts. ( 364 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK34.3 Sq.mts. ( 369 Sq.ft. )11
11 Booked100% Booked
100% Booked
1 BHK34.32 Sq.mts. ( 369 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK34.53 Sq.mts. ( 372 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK34.75 Sq.mts. ( 374 Sq.ft. )6
6 Booked100% Booked
100% Booked
87 total apartments / 87 apartments booked. 100% apartments booked.
Work Description in Building Building No 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Jewel Builders And Infraprojects Ltd
for Project
Jewel Heights
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation