Project overview

Jayram Mali Complex is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700023739. Jayram Mali Complex is located at Thane. This is a New Project being developed by M/S Ekveera Constructions.

Jayram Mali Complex has 1 BHK, 2 BHK, Office space & Shop Apartments with carpet areas ranging from 1083 to 6081 Sq.ft. Carpet. The Project has total 11 of which 11 are currently available for sale.

Jayram Mali Complex is being developed on a total land area of 20667 Sq.ft. out of which 35684 Sq.ft. i.e 173% is reserved for recreational purposes. Jayram Mali Complex has 2 Wings / Towers Wing B,Wing C

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Jayram Mali Complex
  • Location:
  • Thane
  • Const. Stage:
    New Project
  • Possession:
    30 May 2025
Developer Details

  • Developer:
    M/S Ekveera Constructions
  • Phone:
  • Address:
  • 1, Sushila Apartment, Tisgaon Road, Ganesh Temple, Tisgaon Naka, 421306
Project RERA Details
MAHA REARA No: P51700023739
Project Type Others
RERA Project Status New Project
Architect Rachana
Funding Bank BANK OF MAHARASHTRA
Proposed Possession 30 May 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 16 Dec 2019
Last Retrived 28 Jul 2025
Jayram Mali Complex QR Code
Jayram Mali Complex
MahaRERA - P51700023739
Apartment Details & Configuration
TypeArea
1 BHK367.57 Sq.mts. ( 3957 Sq.ft. )
1RK24.11 Sq.mts. ( 260 Sq.ft. )
2 BHK86.85 Sq.mts. ( 935 Sq.ft. )
hall175.32 Sq.mts. ( 1887 Sq.ft. )
Office space420.36 Sq.mts. ( 4525 Sq.ft. )
Office space564.95 Sq.mts. ( 6081 Sq.ft. )
Shop490.6 Sq.mts. ( 5281 Sq.ft. )
1 BHK34.18 Sq.mts. ( 368 Sq.ft. )
2 BHK100.61 Sq.mts. ( 1083 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Jayram Mali Complexlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Approved Plan
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Approved Plan
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Approved Plan
Solid Waste Management And Disposal
Na
Storm Water Drains
As Per Approved Plan
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
As Per Approved Plan
Water Supply
By Kdmc
Buildings / Wings in Jayram Mali Complex
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Jayram Mali Complex by M/S Ekveera Constructionslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

20667 Sq. ft.

Project Area

35684 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

11 apartments in total
Total
11
Booked
0
Available
11

Saleable Area Statistics (Sq. ft.)

35738 Total
Total
35738
Booked
0
Available
35738
Total 11 apartments in project. 0 apartments booked. 0% apartments booked.
Total 35738 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BMay 202471010146
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK367.57 Sq.mts. ( 3957 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK24.11 Sq.mts. ( 260 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK86.85 Sq.mts. ( 935 Sq.ft. )1
None Booked0% Booked
0% Booked
hall175.32 Sq.mts. ( 1887 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space420.36 Sq.mts. ( 4525 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space564.95 Sq.mts. ( 6081 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop490.6 Sq.mts. ( 5281 Sq.ft. )1
None Booked0% Booked
0% Booked
7 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing BCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CMay 202431010146
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.18 Sq.mts. ( 368 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK100.61 Sq.mts. ( 1083 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space564.95 Sq.mts. ( 6081 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop490.6 Sq.mts. ( 5281 Sq.ft. )1
None Booked0% Booked
0% Booked
4 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing CCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
M/S Ekveera Constructions
for Project
Jayram Mali Complex
last updated on 28 Jul 2025 as per information obtained from MARA RERA.