| Project | Developer | Location | Possession |
-
Project:
-
Location:
-
-
Const. Stage:
-
Possession:
-
Developer:
-
Phone:
-
Address:
-
| MAHA REARA No: |
|
| Project Type |
|
| RERA Project Status |
|
| Architect |
|
| Funding Bank |
|
| Proposed Possession |
|
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
|
| Last Modified |
|
| Last Retrived |
|
| Type | Area |
| 1 BHK | 21.89 Sq.mts. ( 236 Sq.ft. ) |
| 1 RK | 16.64 Sq.mts. ( 179 Sq.ft. ) |
| 1 RK | 17.13 Sq.mts. ( 184 Sq.ft. ) |
| Shop | 8.35 Sq.mts. ( 90 Sq.ft. ) |
| Shop | 8.36 Sq.mts. ( 90 Sq.ft. ) |
| Shop | 25.96 Sq.mts. ( 279 Sq.ft. ) |
| Shop | 26.44 Sq.mts. ( 285 Sq.ft. ) |
| Shop | 41.77 Sq.mts. ( 450 Sq.ft. ) |
| Shop | 43.4 Sq.mts. ( 467 Sq.ft. ) |
| 1 BHK | 22.87 Sq.mts. ( 246 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of last updated on as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space50% completed
|
|
- |
|
|
|
- |
Electrical Meter Room, Sub-Station, Receiving Station20% completed
|
|
- |
|
|
|
- |
Fire Protection And Fire Safety
Requirements
|
|
- |
Landscaping & Tree Planting50% completed
|
|
- |
|
|
|
- |
Sewerage (Chamber, Lines, Septic Tank , STP)75% completed
|
|
Chamber |
Solid Waste Management And Disposal
|
|
- |
Storm Water Drains100% completed
|
|
Line Septic Tank |
Street Lighting50% completed
|
|
As Per Tree Noc Givin Vvcmc |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting100% completed
|
|
- |
|
|
|
Bldg No 4 |
Buildings / Wings in
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of by last updated on as per information obtained from MARA RERA.
Apartments Statistics
163
apartments in total
Saleable Area Statistics (Sq. ft.)
38037
Total
Total 163 apartments in project. 146 apartments booked. 89% apartments booked.
Total 38037 Sq.ft. saleable area. 34210 saleable area booked.
90% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Jay Vijay Nagar Bldg No 4 A And B Wing | Jan 1900 | 8 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 21.89 Sq.mts. ( 236 Sq.ft. ) | 89 | |
| 1 RK | 16.64 Sq.mts. ( 179 Sq.ft. ) | 2 | |
| 1 RK | 17.13 Sq.mts. ( 184 Sq.ft. ) | 7 | |
| Shop | 8.35 Sq.mts. ( 90 Sq.ft. ) | 1 | |
| Shop | 8.36 Sq.mts. ( 90 Sq.ft. ) | 1 | |
| Shop | 25.96 Sq.mts. ( 279 Sq.ft. ) | 2 | |
| Shop | 26.44 Sq.mts. ( 285 Sq.ft. ) | 4 | |
| Shop | 41.77 Sq.mts. ( 450 Sq.ft. ) | 1 | |
| Shop | 43.4 Sq.mts. ( 467 Sq.ft. ) | 1 | |
108 total apartments / 105 apartments booked. 97% apartments booked. |
| Work Description in Building Jay Vijay Nagar Bldg No 4 A And B Wing | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Jay Vijay Nagar Buld No 3 A Wing | Jan 1900 | 8 | 1 | 0 | 1 | 0 | 0 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 21.89 Sq.mts. ( 236 Sq.ft. ) | 40 | |
| 1 BHK | 22.87 Sq.mts. ( 246 Sq.ft. ) | 7 | |
| 1 RK | 17.13 Sq.mts. ( 184 Sq.ft. ) | 8 | |
55 total apartments / 41 apartments booked. 74% apartments booked. |
| Work Description in Building Jay Vijay Nagar Buld No 3 A Wing | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
for Project
last updated on
as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |