Project overview

JANARDAN CHSL is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800009412. JANARDAN CHSL is located at Plot No 76. This is a Ongoing being developed by Mahesh Laxman Thakkar.

JANARDAN CHSL has RESIDENTIAL Apartments with carpet areas ranging from 16514 to 16514 Sq.ft. Carpet. The Project has total 28 of which 10 are currently available for sale.

JANARDAN CHSL is being developed on a total land area of 6907 Sq.ft. JANARDAN CHSL has 1 Wings / Towers Janardan Chsl

ProjectDeveloperLocationPossession
Project Details
  • Project:
    JANARDAN CHSL
  • Location:
  • Plot No 76
  • Const. Stage:
    Ongoing
  • Possession:
    31 Mar 2019
Developer Details

  • Developer:
    Mahesh Laxman Thakkar
  • Phone:
  • Address:
  • Ganjawala Shopping Center
Project RERA Details
MAHA REARA No: P51800009412
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Girish P Chaudhari
Funding Bank ICICI BANK LIMITED
Proposed Possession 31 Mar 2019
Revised Possession 31 Mar 2019
Extended Possession
Litigations No Litigations
Last Modified 22 Aug 2017
Last Retrived 13 Feb 2026
JANARDAN CHSL QR Code
JANARDAN CHSL
MahaRERA - P51800009412
Apartment Details & Configuration
TypeArea
RESIDENTIAL1534.2 Sq.mts. ( 16514 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of JANARDAN CHSLlast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
As Per Power Supply Authority Before Issue Of Occ
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Cfo Noc Before Issue Of Occ
Landscaping & Tree Planting
Na
Open Parking100% completed
95% Complete
Before Occ
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
As Per Sewerage Remark Before Issue Of Occ
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
As Per Swd Remark Before Issue Of Occ
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
As Per Rwh Consultant Design Before Issue Of Occ
Water Supply100% completed
95% Complete
Received
Buildings / Wings in JANARDAN CHSL
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of JANARDAN CHSL by Mahesh Laxman Thakkarlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

6907 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

28 apartments in total
Total
28
Booked
18
Available
10

Saleable Area Statistics (Sq. ft.)

462396 Total
Total
462396
Booked
297254
Available
165141
Total 28 apartments in project. 18 apartments booked. 64% apartments booked.
Total 462396 Sq.ft. saleable area. 297254 saleable area booked.
64% area booked.

Janardan Chsl

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Janardan ChslMar 2019810170317
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL1534.2 Sq.mts. ( 16514 Sq.ft. )28
18 Booked64% Booked
64% Booked
28 total apartments / 18 apartments booked. 64% apartments booked.
Work Description in Building Janardan ChslCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Mahesh Laxman Thakkar
for Project
JANARDAN CHSL
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation