Project overview

Ismail Heights is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800012090. Ismail Heights is located at Mumbai Suburban, 400097. This is a On-Going Project being developed by M/S Star Developers.

Ismail Heights has 1 BHK 2 BHK and Shop Apartments with carpet areas ranging from 39891 to 39891 Sq.ft. Carpet. The Project has total 161 of which 53 are currently available for sale.

Ismail Heights is being developed on a total land area of 10441 Sq.ft. Ismail Heights has 2 Wings / Towers Ismail Height Composite Building 20 Wing A,Ismail Height Composite Building No 20 Wing B

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Ismail Heights
  • Location:
  • Mumbai Suburban, 400097
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Dec 2021
Developer Details

  • Developer:
    M/S Star Developers
  • Phone:
  • Address:
  • Shop No 3, Shaikh Ismail Chawl, M H Pathan Road, Adarsh Sweet, Pathanwadi, Dindoshi, Goregaon East, 400097
Project RERA Details
MAHA REARA No: P51800012090
Project Type Others
RERA Project Status On-Going Project
Funding Bank The Malad Sahakari Band Ltd
Proposed Possession 31 Dec 2021
Revised Possession 30 Dec 2023
Extended Possession
Litigations Yes
Last Modified 16 Feb 2023
Last Retrived 28 Jul 2025
Ismail Heights QR Code
Ismail Heights
MahaRERA - P51800012090
Apartment Details & Configuration
TypeArea
1 BHK 2 BHK and Shop2994 Sq.mts. ( 32227 Sq.ft. )
1 BHK 2 BHK and Shop3706 Sq.mts. ( 39891 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Ismail Heightslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space25% completed
25% Complete
Shall Be Completed Before Oc
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station80% completed
80% Complete
Shall Be Completed Before Oc
Energy management20% completed
20% Complete
Shall Be Completed Before Oc
Fire Protection And Fire Safety Requirements25% completed
25% Complete
Shall Be Completed Before Oc
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)30% completed
30% Complete
Shall Be Completed Before Oc
Solid Waste Management And Disposal40% completed
40% Complete
Shall Be Completed Before Oc
Storm Water Drains40% completed
40% Complete
Shall Be Completed Before Oc
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Shall Be Completed Before Oc
Water Supply30% completed
30% Complete
Shall Be Completed Before Oc
Buildings / Wings in Ismail Heights
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ismail Heights by M/S Star Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

10441 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

161 apartments in total
Total
161
Booked
108
Available
53

Saleable Area Statistics (Sq. ft.)

5717428 Total
Total
5717428
Booked
3886751
Available
1830677
Total 161 apartments in project. 108 apartments booked. 67% apartments booked.
Total 5717428 Sq.ft. saleable area. 3886751 saleable area booked.
68% area booked.

Ismail Height Composite Building 20 Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ismail Height Composite Building 20 Wing AJan 1900221110015
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK 2 BHK and Shop2994 Sq.mts. ( 32227 Sq.ft. )92
55 Booked59% Booked
59% Booked
92 total apartments / 55 apartments booked. 59% apartments booked.
Work Description in Building Ismail Height Composite Building 20 Wing ACompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress40% done
40% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress53% done
53% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress40% done
40% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress55% done
55% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress40% done
40% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress55% done
55% Booked

Ismail Height Composite Building No 20 Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ismail Height Composite Building No 20 Wing BJan 1900221110010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK 2 BHK and Shop3706 Sq.mts. ( 39891 Sq.ft. )69
53 Booked76% Booked
76% Booked
69 total apartments / 53 apartments booked. 76% apartments booked.
Work Description in Building Ismail Height Composite Building No 20 Wing BCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress40% done
40% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress51% done
51% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress40% done
40% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress40% done
40% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress40% done
40% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress50% done
50% Booked
Channel Partners
Channel Partners Registered by Developer
M/S Star Developers
for Project
Ismail Heights
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation