Project overview

Ismail Heights is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800012090. Ismail Heights is located at Mumbai Suburban, 400097. This is a On-Going Project being developed by M/S Star Developers.

Ismail Heights has 1 BHK 2 BHK and Shop Apartments with carpet areas ranging from 39891 to 39891 Sq.ft. Carpet. The Project has total 161 of which 53 are currently available for sale.

Ismail Heights is being developed on a total land area of 10441 Sq.ft. Ismail Heights has 2 Wings / Towers Ismail Height Composite Building 20 Wing A,Ismail Height Composite Building No 20 Wing B

ProjectDeveloperLocationPossession
Neelyog Virat -B WingNeelyog Construction Pvt Ltd482 To 485 489 To 509 And 51430-12-2025 00:00:00
Shah Arcade IiiShah Housecon Private Limited502 502 Pt And 502/301 To 388 510 And 510/1 To 5 512 513 513 /1 To 34 515 516 And 516/1 To 14 51730-07-2018 00:00:00
Sheetal DwarSheetal Enterprises53731-12-2019 00:00:00
Mauli OmkarMauli Sai Developers Pvt Ltd701B/1/A To 701B/8/A, 701B/1A/1/1 And 701B/1A/1/1/9 To 3008-07-2023 00:00:00
Mauli PrideMauli Sai Developers Pvt Ltd407/1 To 3, 408, 413, 412, 407, 414, 409 410, 415, 414/1, 4, 416, 415/1 To 908-01-2023 00:00:00
Sanjar Developers And BuildersSanjar Developers & BuildersCts 278A/1B31-12-2019 00:00:00
Neelyog Virat -A WingNeelyog Construction Pvt Ltd482 To 485 489 To 509 51430-12-2026 00:00:00
Sugra ParkBlossom DevelopersSurvey No 27301-01-2021 00:00:00
Vinayak TowerKosmos Developer144, 144/1 To 1131-12-2019 00:00:00
Prayag HeightsJenvee Infrastructure Pvt Ltd107 Part, 10630-12-2023 00:00:00
Malad Babel Chs LtdSiscorn DevelopersCts No 45931-12-2017 00:00:00
Sunrise Orlem 2B Phase 3Dhaval Housing Aop438B, Cts No 438A30-06-2021 00:00:00
Shree Sambhav Darshan ChsShree Sai Shraddha AssociatesMumbai Suburban20-06-2021 00:00:00
Western WoodsKarmvir Mumbai Housing Private Limited1B/9A31-12-2018 00:00:00
Leela SterlingVora Estate Developers400063, Mumbai Suburban31-12-2020 00:00:00
Noble HeightsNoble Infra Projects709 726 727 727 1 To 6 728 728 1 To 230-12-2019 00:00:00
Sumit Garden GroveSumit Garden Grove Construction Llp374B/12 Part30-12-2021 00:00:00
Maple HeightsBholasai Developers291 A Pt31-12-2018 00:00:00
Sheth Blue IvySheth Developers Private LimitedCts 104-A Of Village Dindoshi At Malad East Mumbai 40009730-06-2023 00:00:00
Jp DecksJp Infra (Mumbai) Pvt. Ltd.Survey No 267 Hissa No 1-1 Pt Cts Nos 610A-1A-1B And 610-1A-1A Pt Of Vil Malad-E Tal-Borivili Mumbai31-12-2019 00:00:00
Redevelopment Of Sita Sadan - Rishab VillaM/S S.S. DevelopersMumbai Suburban, 40009731-07-2020 00:00:00
Sheetal BhavanD.G.Realty423 423 1 To 1401-06-2023 00:00:00
Redevelopment Of Malad Jay Amrat Co-Operative Housing Society-Rishab Jay AmratRishabraj Toughcons City Homes Private LimitedPlot Bearing No 7 And 8 Cts No 227/3 And 227/430-06-2021 00:00:00
Shiv Shakti ChslGlasswood Realty Private Limited22-A 22 A/1 To 22 A/531-12-2019 00:00:00
111 Hyde ParkMdm Realty111/96/C/130-06-2022 00:00:00
Hiramani EnclaveDamji Hirji & Company28/1 To 8, Cts No. 28A01-06-2019 00:00:00
Kanakia LevelsKanakia Spaces Realty Private LimitedSurvey No 288 Pt 503 Pt Corresponding Cts Nos Specified In Title Certificate Attach To This Form31-10-2019 00:00:00
Kabra Tiara - Redevelopment Of Dindoshi Darshan ChslKabra And Associates110 (Pt), 146 (Pt)31-12-2027 00:00:00
Shiv ShubharambhNavkarmik Infra & Development Private Limited77001-03-2024 00:00:00
Sukoon Sra Chs Ltd-Wing-A. /Western Heights Cts 394-B&C-WingM V Q Developers394, 394/1 To 1230-06-2025 00:00:00
Sheth Cnergy MaladSheth Developers Private LimitedPart Of Cts No 104/B Of Village Dindoshi30-06-2023 00:00:00
Madhav RealityJayesh Hiralal Gothi823/A 823/1 And 818 Survey Number 28415-06-2022 00:00:00
Sanjay BuildingShreeji Realties Private Limited400097, Mumbai Suburban31-12-2020 00:00:00
Garnet PaladiumGarnet Construction Limited1B/10A31-12-2018 00:00:00
Mauli DesireMauli Sai Developers Pvt Ltd78/1 To 331-01-2019 00:00:00
Sharda SahaniwasSumit Chetna Ventures88 Part31-03-2018 00:00:00
Redevelopment Of Malad Rajhans ChslPranav Constructions LimitedCts No 34 Village Pahadi Goregaon Taluka Borivali31-03-2019 00:00:00
Gaurav DiscoveryVidhi Relators400097, Mumbai Suburban31-12-2021 00:00:00
Kamgar Panch Ganga Sraphase 1 ChsproposedPayal J Shah115Pt 116 117Pt 561Pt 130Apt31-08-2018 00:00:00
Makarani Pada Phase 1K D Builders571, 572/169-264, 574/1-11, 575, 572/273-288, 572/293-295, 575/, 571/1-1930-03-2024 00:00:00
Alta Monte And SignetEra Realtors Private Limited811 A/7Pt 812 813 814 A/1 To A/4 821Pt 824Pt 825Pt 844Pt30-12-2024 00:00:00
Green AcresNirman Realtors And Developers LtdCts No 738/B/1/A30-12-2025 00:00:00
Dindoshi Sai Sadan Chs LtdSanjay Bajranglal Agarwal106 10730-06-2021 00:00:00
Royal Crystal Wing BRoyal RealtorsMalad East31-12-2018 00:00:00
Keshav Shiv HeightsInventure Sejal Realtors Pvt. Ltd.422B, 422B 1 To 1531-03-2018 00:00:00
Redevelopment Of Lamplight ChslShree Mahavir EstatesSurvey No.287, Cts.21 Pt, Plot 5/631-12-2019 00:00:00
Kishor NiwasRatna Premjibhai Gala380 And 38130-12-2023 00:00:00
Nahid HeightsM/S Nahid Enterprises595B30-12-2022 00:00:00
Kurar Sangeeta Aprtment Chs LtdL K Infracon Llp45530-03-2024 00:00:00
Neminath Apartment Sra Chs And Shree Siddhagiri Sra ChsSubhash Velji Chawda276, 276/1 To 2031-12-2019 00:00:00
Avighna ResidencyKonark Shakti Group Of Companies21A/7A31-12-2018 00:00:00
Adcon ResidencyAdcon Infrastructure169 1691-1031-12-2018 00:00:00
Sheetal HeightsToughcons Realtors Private LimitedCts 569 570 570 1 To 931-12-2019 00:00:00
Shah Business CentreShah Housecon Private Limited472B Pt 472B / 1 To 78 472B / 82 To 90 472 B /93 To 12231-12-2019 00:00:00
Neev GalaxyNeev Infrastructure Pvt. Ltd.49/E31-12-2018 00:00:00
Hive 97Amity ConstructionsCts No. 602, 602/1 To 228 Of Village Pahadi Goregaon East And Cts No. 392 Of Village Malad East31-12-2029 00:00:00
Shiv PalaceNavkarmik Infra & Development Private Limited76731-05-2027 00:00:00
Sayba Signature SpacesStar SapphireCts No 530-06-2027 00:00:00
Ghanwat AccordGhanwat Developers Pvt. Ltd790(A)31-12-2027 00:00:00
Pearl OasisBahist Enterprises Pvt Ltd136 Pt30-12-2024 00:00:00
Jaliyan HeavenJaliyan DeveloperPlot No 2 Cts 38630-12-2022 00:00:00
Royal PristoRoyal Realtors712 713 714 715 And Other As Per Loi30-12-2026 00:00:00
Happy Home EnclaveJd & Fc Ventures Llp348 (Part)31-12-2026 00:00:00
Vaishno Neelkanth ApartmentShree Vaishno Homes Pvt. Ltd.542/C31-12-2024 00:00:00
Serenity DecksEternity And Aakar Realty112/21 ,112/2231-07-2028 00:00:00
Express Zone B WingCello Sonal Construction581/C/1, Cts No. 1B/1/B/130-06-2024 00:00:00
Shankeshwar ApartmentNavkar Developers568, 568/1 To 1230-09-2020 00:00:00
Atlanta Estate ExtensionAtul Raj Builders Pvt Ltd400063, Mumbai City30-06-2011 00:00:00
Project Details
  • Project:
    Ismail Heights
  • Location:
  • Mumbai Suburban, 400097
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Dec 2021
Developer Details

  • Developer:
    M/S Star Developers
  • Phone:
  • Address:
  • Shop No 3, Shaikh Ismail Chawl, M H Pathan Road, Adarsh Sweet, Pathanwadi, Dindoshi, Goregaon East, 400097
Project RERA Details
MAHA REARA No: P51800012090
Project Type Others
RERA Project Status On-Going Project
Funding Bank The Malad Sahakari Band Ltd
Proposed Possession 31 Dec 2021
Revised Possession 30 Dec 2023
Extended Possession
Litigations Yes
Last Modified 16 Feb 2023
Last Retrived 28 Jul 2025
Ismail Heights QR Code
Ismail Heights
MahaRERA - P51800012090
Apartment Details & Configuration
TypeArea
1 BHK 2 BHK and Shop2994 Sq.mts. ( 32227 Sq.ft. )
1 BHK 2 BHK and Shop3706 Sq.mts. ( 39891 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Ismail Heightslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space25% completed
25% Complete
Shall Be Completed Before Oc
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station80% completed
80% Complete
Shall Be Completed Before Oc
Energy management20% completed
20% Complete
Shall Be Completed Before Oc
Fire Protection And Fire Safety Requirements25% completed
25% Complete
Shall Be Completed Before Oc
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)30% completed
30% Complete
Shall Be Completed Before Oc
Solid Waste Management And Disposal40% completed
40% Complete
Shall Be Completed Before Oc
Storm Water Drains40% completed
40% Complete
Shall Be Completed Before Oc
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Shall Be Completed Before Oc
Water Supply30% completed
30% Complete
Shall Be Completed Before Oc
Buildings / Wings in Ismail Heights
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ismail Heights by M/S Star Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

10441 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

161 apartments in total
Total
161
Booked
108
Available
53

Saleable Area Statistics (Sq. ft.)

5717428 Total
Total
5717428
Booked
3886751
Available
1830677
Total 161 apartments in project. 108 apartments booked. 67% apartments booked.
Total 5717428 Sq.ft. saleable area. 3886751 saleable area booked.
68% area booked.

Ismail Height Composite Building 20 Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ismail Height Composite Building 20 Wing AJan 1900221110015
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK 2 BHK and Shop2994 Sq.mts. ( 32227 Sq.ft. )92
55 Booked59% Booked
59% Booked
92 total apartments / 55 apartments booked. 59% apartments booked.
Work Description in Building Ismail Height Composite Building 20 Wing ACompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress40% done
40% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress53% done
53% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress40% done
40% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress55% done
55% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress40% done
40% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress55% done
55% Booked

Ismail Height Composite Building No 20 Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ismail Height Composite Building No 20 Wing BJan 1900221110010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK 2 BHK and Shop3706 Sq.mts. ( 39891 Sq.ft. )69
53 Booked76% Booked
76% Booked
69 total apartments / 53 apartments booked. 76% apartments booked.
Work Description in Building Ismail Height Composite Building No 20 Wing BCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress40% done
40% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress51% done
51% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress40% done
40% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress40% done
40% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress40% done
40% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress50% done
50% Booked
Channel Partners
Channel Partners Registered by Developer
M/S Star Developers
for Project
Ismail Heights
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation