Project overview

Ira Insignia is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700031409. Ira Insignia is located at Surver No 239 Hissa No 4 Villege Bhopar. This is a New being developed by Ira Homes.

Ira Insignia has 1 BHK & 2 BHK Apartments with carpet areas ranging from 448 to 630 Sq.ft. Carpet. The Project has total 385 of which 385 are currently available for sale.

Ira Insignia is being developed on a total land area of 94723 Sq.ft. Ira Insignia has 3 Wings / Towers Building No 1,Building No 2,Building No 3

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Ira Insignia
  • Location:
  • Surver No 239 Hissa No 4 Villege Bhopar
  • Const. Stage:
    New
  • Possession:
    31 Dec 2026
Developer Details

  • Developer:
    Ira Homes
  • Phone:
  • Address:
  • Ira Galaxy Complex, F Wing
Project RERA Details
MAHA REARA No: P51700031409
Project Type Residential / Group Housing
RERA Project Status New
Architect Anil Nirgude
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 31 Dec 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 10 Jul 2025
Last Retrived 26 Jul 2025
Ira Insignia QR Code
Ira Insignia
MahaRERA - P51700031409
Apartment Details & Configuration
TypeArea
1 BHK41.65 Sq.mts. ( 448 Sq.ft. )
2 BHK58.54 Sq.mts. ( 630 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Ira Insignialast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
-
Energy management
-
Fire Protection And Fire Safety Requirements
-
Landscaping & Tree Planting
-
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Stp
Solid Waste Management And Disposal
-
Storm Water Drains
-
Street Lighting
-
Treatment And Disposal Of Sewage And Sullage Water
-
Water Conservation, Rain water Harvesting
-
Water Supply
-
Buildings / Wings in Ira Insignia
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ira Insignia by Ira Homeslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

94723 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

385 apartments in total
Total
385
Booked
0
Available
385

Saleable Area Statistics (Sq. ft.)

196238 Total
Total
196238
Booked
0
Available
196238
Total 385 apartments in project. 0 apartments booked. 0% apartments booked.
Total 196238 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Building No 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 1Dec 2026291013700
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK41.65 Sq.mts. ( 448 Sq.ft. )91
None Booked0% Booked
0% Booked
2 BHK58.54 Sq.mts. ( 630 Sq.ft. )46
None Booked0% Booked
0% Booked
137 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 1Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Building No 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2Dec 2026291013650
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK41.65 Sq.mts. ( 448 Sq.ft. )81
None Booked0% Booked
0% Booked
2 BHK58.54 Sq.mts. ( 630 Sq.ft. )42
None Booked0% Booked
0% Booked
123 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 2Completion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked

Building No 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 3Dec 2026291013640
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK41.65 Sq.mts. ( 448 Sq.ft. )83
None Booked0% Booked
0% Booked
2 BHK58.54 Sq.mts. ( 630 Sq.ft. )42
None Booked0% Booked
0% Booked
125 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 3Completion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress80% done
80% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress28% done
28% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Ira Homes
for Project
Ira Insignia
last updated on 26 Jul 2025 as per information obtained from MARA RERA.