Project overview

Ipsit Paradise Phase 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000010582. Ipsit Paradise Phase 2 is located at S No 80. This is a Ongoing being developed by Dreamland Developers.

Ipsit Paradise Phase 2 has BUNGALOW NO 11 TO 12 & BUNGALOW NO 13 TO 15 Apartments with carpet areas ranging from 968 to 1028 Sq.ft. Carpet. The Project has total 5 of which 0 are currently available for sale.

Ipsit Paradise Phase 2 is being developed on a total land area of 21980 Sq.ft. Ipsit Paradise Phase 2 has 1 Wings / Towers Ipsit Paradise Phase 2

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Ipsit Paradise Phase 2
  • Location:
  • S No 80
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    Dreamland Developers
  • Phone:
  • Address:
  • Vishnu Apartment
Project RERA Details
MAHA REARA No: P99000010582
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Abhay Raut
Funding Bank THE COSMOS CO OPERATIVE BANK LIMITED
Proposed Possession 30 Dec 2022
Revised Possession 30 Dec 2022
Extended Possession 30 Apr 2026
Litigations No Litigations
Last Modified 24 Jul 2024
Last Retrived 28 Jul 2025
Ipsit Paradise Phase 2 QR Code
Ipsit Paradise Phase 2
MahaRERA - P99000010582
Apartment Details & Configuration
TypeArea
BUNGALOW NO 11 TO 1289.97 Sq.mts. ( 968 Sq.ft. )
BUNGALOW NO 13 TO 1595.51 Sq.mts. ( 1028 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Ipsit Paradise Phase 2last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Yet To Start
Energy management
Na
Fire Protection And Fire Safety Requirements
Yet To Start
Landscaping & Tree Planting
As Per Tree Noc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Septic Tank
Solid Waste Management And Disposal
Na
Storm Water Drains
To Be Connected To Vvmc Strom Drain
Street Lighting
Yet To Start
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
As Per Vvcmc
Water Supply
Facility Will Start Once Vvmc Water Supply Commenc
Buildings / Wings in Ipsit Paradise Phase 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ipsit Paradise Phase 2 by Dreamland Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

21980 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

5 apartments in total
Total
5
Booked
5
Available
0

Saleable Area Statistics (Sq. ft.)

5021 Total
Total
5021
Booked
5021
Available
0
Total 5 apartments in project. 5 apartments booked. 100% apartments booked.
Total 5021 Sq.ft. saleable area. 5021 saleable area booked.
100% area booked.

Ipsit Paradise Phase 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ipsit Paradise Phase 2Dec 20212101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
BUNGALOW NO 11 TO 1289.97 Sq.mts. ( 968 Sq.ft. )2
2 Booked100% Booked
100% Booked
BUNGALOW NO 13 TO 1595.51 Sq.mts. ( 1028 Sq.ft. )3
3 Booked100% Booked
100% Booked
5 total apartments / 5 apartments booked. 100% apartments booked.
Work Description in Building Ipsit Paradise Phase 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Dreamland Developers
for Project
Ipsit Paradise Phase 2
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation