Project overview

Intelligentia Horizon By Haware Properties is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800049437. Intelligentia Horizon By Haware Properties is located at Bldg 234 237 Cts No 356 Pt Survey No 113 Pt. This is a New being developed by Haware Intelligentia Properties Llp.

Intelligentia Horizon By Haware Properties has Shop Apartments with carpet areas ranging from 155 to 245 Sq.ft. Carpet. The Project has total 477 of which 477 are currently available for sale.

Intelligentia Horizon By Haware Properties is being developed on a total land area of 24197 Sq.ft. Intelligentia Horizon By Haware Properties has 8 Wings / Towers Wing A 1 To 27 Proposed,Wing A Ground Proposed,Wing B 1 To 27 Proposed,Wing B Ground Proposed,Wing C 1 To 27 Proposed,Wing C Ground Proposed,Wing D 1 To 27 Proposed,Wing D Ground Proposed

ProjectDeveloperLocationPossession
Stella ResidencyVaibhavlaxmi Builders And Developers356 Part30-04-2021 00:00:00
Aadarsh ChsAditya EnterprisesMumbai Suburban, 40008330-09-2016 00:00:00
Rabindranath Tagore Abhashan Prakalp LayoutSsv Developers And Builders Mumbai Proprietor Hemant ParikhMumbai Suburban01-12-2026 00:00:00
Nirvaana HeightsNirvaana Constructions LlpSurvey No.113 Pt C.S. No354 Pt30-06-2024 00:00:00
Swastik EmeraldSwastik Realtors347 Pt, 347/33 To 4030-12-2022 00:00:00
Puneet Sanjivani Phase 1 Floor 0 To Floor 16Puneet DevelopersCts No 351 Pt30-12-2024 00:00:00
Truearth ViewsTruearth Developers Pvt Ltd356 Part30-12-2025 00:00:00
Haware Intelligentia Sigma South Jvlr Wing CSuresh HawareCts No 352 Pt, Tagore Nagar, Bldg No 18, Mumbai, 40008330-06-2026 00:00:00
Vidhya DarshanAditya Enterprises34730-08-2019 00:00:00
Sai SiddhiLaxmi Corporation252A31-12-2018 00:00:00
Green VistaVaibhavlaxmi Builders And DevelopersC.T.S 356 Part31-12-2018 00:00:00
Purnima PrideAditya Enterprises35430-08-2019 00:00:00
Shree Ganesh PrasadAnon Developers1268/330-12-2021 00:00:00
Intelligentia Horizon By Haware PropertiesHaware Intelligentia Properties LlpBldg 234 237 Cts No 356 Pt Survey No 113 Pt31-12-2027 00:00:00
OpulentReki Developers LlpCts No 347 Part31-03-2025 00:00:00
The Rising 58Ashapura UnitedCts No.356 (Pt), Building No.58, Survey No.113 (Pt)31-12-2025 00:00:00
Omkaar SolitaireShiddhivinayak DevelopersC.T.S. No. 356 (Pt)31-12-2025 00:00:00
Project Details
  • Project:
    Intelligentia Horizon By Haware Properties
  • Location:
  • Bldg 234 237 Cts No 356 Pt Survey No 113 Pt
  • Const. Stage:
    New
  • Possession:
    31 Dec 2027
Developer Details

  • Developer:
    Haware Intelligentia Properties Llp
  • Phone:
  • Address:
  • Haware Infotech Park
Project RERA Details
MAHA REARA No: P51800049437
Project Type Others
RERA Project Status New
Architect Kalakruti Architects
Funding Bank ICICI BANK LIMITED
Proposed Possession 31 Dec 2027
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 14 Feb 2023
Last Retrived 26 Jul 2025
Intelligentia Horizon By Haware Properties QR Code
Intelligentia Horizon By Haware Properties
MahaRERA - P51800049437
Apartment Details & Configuration
TypeArea
1 BHK31.12 Sq.mts. ( 335 Sq.ft. )
2 BHK54.53 Sq.mts. ( 587 Sq.ft. )
2 BHK57.13 Sq.mts. ( 615 Sq.ft. )
Shop3.53 Sq.mts. ( 38 Sq.ft. )
Shop11.61 Sq.mts. ( 125 Sq.ft. )
Shop13.56 Sq.mts. ( 146 Sq.ft. )
Shop14.12 Sq.mts. ( 152 Sq.ft. )
Shop16.35 Sq.mts. ( 176 Sq.ft. )
Shop16.54 Sq.mts. ( 178 Sq.ft. )
Shop20.35 Sq.mts. ( 219 Sq.ft. )
1 BHK28.61 Sq.mts. ( 308 Sq.ft. )
1 BHK28.71 Sq.mts. ( 309 Sq.ft. )
1 BHK29.26 Sq.mts. ( 315 Sq.ft. )
1 BHK31.4 Sq.mts. ( 338 Sq.ft. )
1 BHK33.63 Sq.mts. ( 362 Sq.ft. )
1 BHK33.82 Sq.mts. ( 364 Sq.ft. )
1 BHK35.49 Sq.mts. ( 382 Sq.ft. )
1 BHK38.18 Sq.mts. ( 411 Sq.ft. )
2 BHK42.46 Sq.mts. ( 457 Sq.ft. )
2 BHK44.04 Sq.mts. ( 474 Sq.ft. )
Shop9.75 Sq.mts. ( 105 Sq.ft. )
Shop10.96 Sq.mts. ( 118 Sq.ft. )
Shop11.8 Sq.mts. ( 127 Sq.ft. )
Shop12.36 Sq.mts. ( 133 Sq.ft. )
1 BHK32.14 Sq.mts. ( 346 Sq.ft. )
1 BHK32.89 Sq.mts. ( 354 Sq.ft. )
1 BHK36.14 Sq.mts. ( 389 Sq.ft. )
2 BHK45.71 Sq.mts. ( 492 Sq.ft. )
3 BHK67.63 Sq.mts. ( 728 Sq.ft. )
Shop6.69 Sq.mts. ( 72 Sq.ft. )
Shop12.26 Sq.mts. ( 132 Sq.ft. )
Shop13.01 Sq.mts. ( 140 Sq.ft. )
Shop14.31 Sq.mts. ( 154 Sq.ft. )
Shop15.7 Sq.mts. ( 169 Sq.ft. )
Shop16.91 Sq.mts. ( 182 Sq.ft. )
1 BHK32.61 Sq.mts. ( 351 Sq.ft. )
1 BHK39.3 Sq.mts. ( 423 Sq.ft. )
2 BHK57.69 Sq.mts. ( 621 Sq.ft. )
Shop14.4 Sq.mts. ( 155 Sq.ft. )
Shop15.79 Sq.mts. ( 170 Sq.ft. )
Shop21.37 Sq.mts. ( 230 Sq.ft. )
Shop22.76 Sq.mts. ( 245 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Intelligentia Horizon By Haware Propertieslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Will Be Done As Per Requirement
Energy management
Energy Efficient Fixtures Will Be Installed
Fire Protection And Fire Safety Requirements
Will Be Done As Per Requirement
Landscaping & Tree Planting
Will Be Done
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Will Be Done As Per Requirement
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Will Be Done As Per Requirement
Water Supply
Will Be Provided By Planning Authority
Buildings / Wings in Intelligentia Horizon By Haware Properties
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Intelligentia Horizon By Haware Properties by Haware Intelligentia Properties Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

24197 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 8

Wings / Towers in Project

Apartments Statistics

477 apartments in total
Total
477
Booked
0
Available
477

Saleable Area Statistics (Sq. ft.)

220872 Total
Total
220872
Booked
0
Available
220872
Total 477 apartments in project. 0 apartments booked. 0% apartments booked.
Total 220872 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Wing A 1 To 27 Proposed

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing A 1 To 27 ProposedDec 202727100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.12 Sq.mts. ( 335 Sq.ft. )18
None Booked0% Booked
0% Booked
2 BHK54.53 Sq.mts. ( 587 Sq.ft. )20
None Booked0% Booked
0% Booked
2 BHK57.13 Sq.mts. ( 615 Sq.ft. )46
None Booked0% Booked
0% Booked
84 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing A 1 To 27 ProposedCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress25% done
25% Booked
Slabs of Super Structure
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress75% done
75% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing A Ground Proposed

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing A Ground ProposedDec 20271101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Shop3.53 Sq.mts. ( 38 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop11.61 Sq.mts. ( 125 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.56 Sq.mts. ( 146 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.12 Sq.mts. ( 152 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.35 Sq.mts. ( 176 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.54 Sq.mts. ( 178 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop20.35 Sq.mts. ( 219 Sq.ft. )1
None Booked0% Booked
0% Booked
7 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing A Ground ProposedCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing B 1 To 27 Proposed

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing B 1 To 27 ProposedDec 202727100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.61 Sq.mts. ( 308 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK28.71 Sq.mts. ( 309 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK29.26 Sq.mts. ( 315 Sq.ft. )22
None Booked0% Booked
0% Booked
1 BHK31.4 Sq.mts. ( 338 Sq.ft. )22
None Booked0% Booked
0% Booked
1 BHK33.63 Sq.mts. ( 362 Sq.ft. )18
None Booked0% Booked
0% Booked
1 BHK33.82 Sq.mts. ( 364 Sq.ft. )18
None Booked0% Booked
0% Booked
1 BHK35.49 Sq.mts. ( 382 Sq.ft. )19
None Booked0% Booked
0% Booked
1 BHK38.18 Sq.mts. ( 411 Sq.ft. )22
None Booked0% Booked
0% Booked
2 BHK42.46 Sq.mts. ( 457 Sq.ft. )27
None Booked0% Booked
0% Booked
2 BHK44.04 Sq.mts. ( 474 Sq.ft. )24
None Booked0% Booked
0% Booked
180 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing B 1 To 27 ProposedCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress25% done
25% Booked
Slabs of Super Structure
work-in-progress60% done
60% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress60% done
60% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing B Ground Proposed

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing B Ground ProposedDec 20271100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Shop9.75 Sq.mts. ( 105 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop10.96 Sq.mts. ( 118 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop11.8 Sq.mts. ( 127 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.36 Sq.mts. ( 133 Sq.ft. )1
None Booked0% Booked
0% Booked
4 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing B Ground ProposedCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing C 1 To 27 Proposed

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing C 1 To 27 ProposedDec 202727100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.14 Sq.mts. ( 346 Sq.ft. )22
None Booked0% Booked
0% Booked
1 BHK32.89 Sq.mts. ( 354 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK36.14 Sq.mts. ( 389 Sq.ft. )18
None Booked0% Booked
0% Booked
2 BHK45.71 Sq.mts. ( 492 Sq.ft. )23
None Booked0% Booked
0% Booked
3 BHK67.63 Sq.mts. ( 728 Sq.ft. )26
None Booked0% Booked
0% Booked
95 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing C 1 To 27 ProposedCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress25% done
25% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress25% done
25% Booked
Slabs of Super Structure
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress75% done
75% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Wing C Ground Proposed

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing C Ground ProposedDec 20271100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Shop6.69 Sq.mts. ( 72 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.26 Sq.mts. ( 132 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.01 Sq.mts. ( 140 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.31 Sq.mts. ( 154 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.7 Sq.mts. ( 169 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.91 Sq.mts. ( 182 Sq.ft. )1
None Booked0% Booked
0% Booked
6 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing C Ground ProposedCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing D 1 To 27 Proposed

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing D 1 To 27 ProposedDec 202727100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.61 Sq.mts. ( 351 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK39.3 Sq.mts. ( 423 Sq.ft. )18
None Booked0% Booked
0% Booked
2 BHK57.13 Sq.mts. ( 615 Sq.ft. )50
None Booked0% Booked
0% Booked
2 BHK57.69 Sq.mts. ( 621 Sq.ft. )23
None Booked0% Booked
0% Booked
97 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing D 1 To 27 ProposedCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress80% done
80% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress25% done
25% Booked
Slabs of Super Structure
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Wing D Ground Proposed

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing D Ground ProposedDec 20271100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Shop14.4 Sq.mts. ( 155 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.79 Sq.mts. ( 170 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop21.37 Sq.mts. ( 230 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop22.76 Sq.mts. ( 245 Sq.ft. )1
None Booked0% Booked
0% Booked
4 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing D Ground ProposedCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Haware Intelligentia Properties Llp
for Project
Intelligentia Horizon By Haware Properties
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation