Project overview

Insignia is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900012105. Insignia is located at S.K. Bole Road. This is a On-Going Project being developed by Ashwatha Developers.

Insignia has 2 BHK, 3 BHK, 4 BHK & 5 BHK Apartments with carpet areas ranging from 1120 to 1020 Sq.ft. Carpet. The Project has total 93 of which 93 are currently available for sale.

Insignia is being developed on a total land area of 32805 Sq.ft. Insignia has 1 Wings / Towers Insignia

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Insignia
  • Location:
  • S.K. Bole Road
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Dec 2023
Developer Details

  • Developer:
    Ashwatha Developers
  • Phone:
  • Address:
  • F P No 267, Kawliwadi, S K Bole Road, Opp Aaradhana Bhavan, Dadar West, 400028
Project RERA Details
MAHA REARA No: P51900012105
Project Type Residential
RERA Project Status On-Going Project
Funding Bank ICICI BANK
Proposed Possession 31 Dec 2023
Revised Possession 30 Dec 2024
Extended Possession
Litigations Yes
Last Modified 22 Nov 2023
Last Retrived 28 Jul 2025
Insignia QR Code
Insignia
MahaRERA - P51900012105
Apartment Details & Configuration
TypeArea
2 BHK73.4 Sq.mts. ( 790 Sq.ft. )
3 BHK94.76 Sq.mts. ( 1020 Sq.ft. )
3 BHK104.05 Sq.mts. ( 1120 Sq.ft. )
4 BHK176.51 Sq.mts. ( 1900 Sq.ft. )
5 BHK213.68 Sq.mts. ( 2300 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Insignialast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Shall Be Done Prior To Oc
Energy management
Na
Fire Protection And Fire Safety Requirements
Shall Be Done Prior To Oc
Landscaping & Tree Planting
Shall Be Done Prior To Oc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Shall Be Done Prior To Oc
Solid Waste Management And Disposal
Shall Be Done Prior To Oc
Storm Water Drains
Shall Be Done Prior To Oc
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Shall Be Done Prior To Oc
Water Conservation, Rain water Harvesting
Shall Be Done Prior To Oc
Water Supply
Shall Be Done Prior To Oc
Buildings / Wings in Insignia
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Insignia by Ashwatha Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

32805 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

93 apartments in total
Total
93
Booked
0
Available
93

Saleable Area Statistics (Sq. ft.)

121499 Total
Total
121499
Booked
0
Available
121499
Total 93 apartments in project. 0 apartments booked. 0% apartments booked.
Total 121499 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Insignia

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
InsigniaJan 19005511000300
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK73.4 Sq.mts. ( 790 Sq.ft. )12
None Booked0% Booked
0% Booked
3 BHK94.76 Sq.mts. ( 1020 Sq.ft. )25
None Booked0% Booked
0% Booked
3 BHK104.05 Sq.mts. ( 1120 Sq.ft. )26
None Booked0% Booked
0% Booked
4 BHK176.51 Sq.mts. ( 1900 Sq.ft. )29
None Booked0% Booked
0% Booked
5 BHK213.68 Sq.mts. ( 2300 Sq.ft. )1
None Booked0% Booked
0% Booked
93 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building InsigniaCompletion
Excavation
work-in-progress50% done
50% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Ashwatha Developers
for Project
Insignia
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation