Project overview

Insignia is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800002313. Insignia is located at Cts No 5530/A. This is a Ongoing being developed by Ultra Space Developers Private Limited.

Insignia has 4 BHK TYPE 1, 4 BHK TYPE 2, 4 BHK TYPE 3, 4 BHK TYPE 4, 4.5 BHK TYPE 1, 4.5 BHK TYPE 2, 4.5 BHK TYPE 3, 4.5 BHK TYPE 4, 5 BHK TYPE 1, 5 BHK TYPE 2, 5 BHK TYPE 3, 5 BHK TYPE 4 & SHOP 1 Apartments with carpet areas ranging from 1611 to 4800 Sq.ft. Carpet. The Project has total 235 of which 1 are currently available for sale.

Insignia is being developed on a total land area of 99061 Sq.ft. out of which 9907 Sq.ft. i.e 10% is reserved for recreational purposes. Insignia has 6 Wings / Towers Wing A,Wing B,Wing C,Wing D,Wing E,Wing F

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Insignia
  • Location:
  • Cts No 5530/A
  • Const. Stage:
    Ongoing
  • Possession:
    30 Apr 2020
Developer Details

  • Developer:
    Ultra Space Developers Private Limited
  • Phone:
  • Address:
  • Hdil Towers
Project RERA Details
MAHA REARA No: P51800002313
Project Type Others
RERA Project Status Ongoing
Architect Gvs Architects & Associates
Funding Bank STATE BANK OF INDIA
Proposed Possession 30 Apr 2020
Revised Possession 30 Apr 2020
Extended Possession 30 Jun 2022
Litigations No Litigations
Last Modified 09 Sep 2021
Last Retrived 26 Jul 2025
Insignia QR Code
Insignia
MahaRERA - P51800002313
Apartment Details & Configuration
TypeArea
2.5 BHK TYPE 188.1 Sq.mts. ( 948 Sq.ft. )
2.5 BHK TYPE 287.64 Sq.mts. ( 943 Sq.ft. )
2.5 BHK TYPE 390.27 Sq.mts. ( 972 Sq.ft. )
2.5 BHK TYPE 490.05 Sq.mts. ( 969 Sq.ft. )
3.5 BHK TYPE 1118.95 Sq.mts. ( 1280 Sq.ft. )
3.5 BHK TYPE 2116.04 Sq.mts. ( 1249 Sq.ft. )
3.5 BHK TYPE 3118.69 Sq.mts. ( 1278 Sq.ft. )
3.5 BHK TYPE 4120.29 Sq.mts. ( 1295 Sq.ft. )
2.5 BHK TYPE 191.93 Sq.mts. ( 990 Sq.ft. )
3 BHK TYPE 1101.88 Sq.mts. ( 1097 Sq.ft. )
3 BHK TYPE 2103.88 Sq.mts. ( 1118 Sq.ft. )
3.5 BHK TYPE 1121.2 Sq.mts. ( 1305 Sq.ft. )
3.5 BHK TYPE 2120.32 Sq.mts. ( 1295 Sq.ft. )
4 BHK TYPE 1132.09 Sq.mts. ( 1422 Sq.ft. )
4 BHK TYPE 2132.11 Sq.mts. ( 1422 Sq.ft. )
4 BHK TYPE 3132.61 Sq.mts. ( 1427 Sq.ft. )
2.5 BHK TYPE 193.45 Sq.mts. ( 1006 Sq.ft. )
2.5 BHK TYPE 292.32 Sq.mts. ( 994 Sq.ft. )
3 BHK TYPE 1103.09 Sq.mts. ( 1110 Sq.ft. )
3 BHK TYPE 2103.82 Sq.mts. ( 1118 Sq.ft. )
3.5 BHK TYPE 1123.43 Sq.mts. ( 1329 Sq.ft. )
3.5 BHK TYPE 2121.74 Sq.mts. ( 1310 Sq.ft. )
4 BHK TYPE 1135.01 Sq.mts. ( 1453 Sq.ft. )
4 BHK TYPE 2133.8 Sq.mts. ( 1440 Sq.ft. )
5 BHK208.21 Sq.mts. ( 2241 Sq.ft. )
6 BHK TYPE 1239.89 Sq.mts. ( 2582 Sq.ft. )
3 BHK TYPE 1128.68 Sq.mts. ( 1385 Sq.ft. )
3 BHK TYPE 2137.05 Sq.mts. ( 1475 Sq.ft. )
3 BHK TYPE 3131.74 Sq.mts. ( 1418 Sq.ft. )
4 BHK TYPE 1150.44 Sq.mts. ( 1619 Sq.ft. )
4 BHK TYPE 2151.78 Sq.mts. ( 1634 Sq.ft. )
4 BHK TYPE 3151.85 Sq.mts. ( 1635 Sq.ft. )
4 BHK TYPE 4149.62 Sq.mts. ( 1611 Sq.ft. )
4.5 BHK TYPE 1159.53 Sq.mts. ( 1717 Sq.ft. )
4.5 BHK TYPE 2162.79 Sq.mts. ( 1752 Sq.ft. )
4.5 BHK TYPE 3162.59 Sq.mts. ( 1750 Sq.ft. )
4.5 BHK TYPE 4163.94 Sq.mts. ( 1765 Sq.ft. )
5 BHK TYPE 1166.08 Sq.mts. ( 1788 Sq.ft. )
5 BHK TYPE 2162.49 Sq.mts. ( 1749 Sq.ft. )
5 BHK TYPE 3167.23 Sq.mts. ( 1800 Sq.ft. )
5 BHK TYPE 4165 Sq.mts. ( 1776 Sq.ft. )
SHOP 1445.95 Sq.mts. ( 4800 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Insignialast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space95% completed
95% Complete
Building Under Construction
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station95% completed
95% Complete
Building Under Construction
Energy management
Building Under Construction
Fire Protection And Fire Safety Requirements90% completed
90% Complete
Building Under Construction
Landscaping & Tree Planting90% completed
90% Complete
Building Under Construction
Open Parking98% completed
98% Complete
Building Under Construction
Sewerage (Chamber, Lines, Septic Tank , STP)98% completed
98% Complete
Building Under Construction
Solid Waste Management And Disposal98% completed
98% Complete
Building Under Construction
Storm Water Drains100% completed
95% Complete
Building Under Construction
Street Lighting
Building Under Construction
Treatment And Disposal Of Sewage And Sullage Water98% completed
98% Complete
Building Under Construction
Water Conservation, Rain water Harvesting90% completed
90% Complete
Building Under Construction
Water Supply95% completed
95% Complete
Building Under Construction
Buildings / Wings in Insignia
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Insignia by Ultra Space Developers Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

99061 Sq. ft.

Project Area

9907 Sq. ft.

Recreational Open Space

Total 6

Wings / Towers in Project

Apartments Statistics

235 apartments in total
Total
235
Booked
234
Available
1

Saleable Area Statistics (Sq. ft.)

349053 Total
Total
349053
Booked
344253
Available
4800
Total 235 apartments in project. 234 apartments booked. 99% apartments booked.
Total 349053 Sq.ft. saleable area. 344253 saleable area booked.
99% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing ADec 20181514012789
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2.5 BHK TYPE 188.1 Sq.mts. ( 948 Sq.ft. )2
2 Booked100% Booked
100% Booked
2.5 BHK TYPE 287.64 Sq.mts. ( 943 Sq.ft. )2
2 Booked100% Booked
100% Booked
2.5 BHK TYPE 390.27 Sq.mts. ( 972 Sq.ft. )2
2 Booked100% Booked
100% Booked
2.5 BHK TYPE 490.05 Sq.mts. ( 969 Sq.ft. )2
2 Booked100% Booked
100% Booked
3.5 BHK TYPE 1118.95 Sq.mts. ( 1280 Sq.ft. )10
10 Booked100% Booked
100% Booked
3.5 BHK TYPE 2116.04 Sq.mts. ( 1249 Sq.ft. )10
10 Booked100% Booked
100% Booked
3.5 BHK TYPE 3118.69 Sq.mts. ( 1278 Sq.ft. )10
10 Booked100% Booked
100% Booked
3.5 BHK TYPE 4120.29 Sq.mts. ( 1295 Sq.ft. )10
10 Booked100% Booked
100% Booked
48 total apartments / 48 apartments booked. 100% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress98% done
98% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress98% done
98% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress98% done
98% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress65% done
65% Booked
Sanitary Fittings within the flats / premises
work-in-progress65% done
65% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress98% done
98% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BDec 20181514012299
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2.5 BHK TYPE 191.93 Sq.mts. ( 990 Sq.ft. )2
2 Booked100% Booked
100% Booked
2.5 BHK TYPE 290.05 Sq.mts. ( 969 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK TYPE 1101.88 Sq.mts. ( 1097 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK TYPE 2103.88 Sq.mts. ( 1118 Sq.ft. )2
2 Booked100% Booked
100% Booked
3.5 BHK TYPE 1121.2 Sq.mts. ( 1305 Sq.ft. )10
10 Booked100% Booked
100% Booked
3.5 BHK TYPE 2120.32 Sq.mts. ( 1295 Sq.ft. )6
6 Booked100% Booked
100% Booked
4 BHK TYPE 1132.09 Sq.mts. ( 1422 Sq.ft. )14
14 Booked100% Booked
100% Booked
4 BHK TYPE 2132.11 Sq.mts. ( 1422 Sq.ft. )6
6 Booked100% Booked
100% Booked
4 BHK TYPE 3132.61 Sq.mts. ( 1427 Sq.ft. )4
4 Booked100% Booked
100% Booked
48 total apartments / 48 apartments booked. 100% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress98% done
98% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress98% done
98% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress98% done
98% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress65% done
65% Booked
Sanitary Fittings within the flats / premises
work-in-progress65% done
65% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress98% done
98% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CDec 2018151401091
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2.5 BHK TYPE 193.45 Sq.mts. ( 1006 Sq.ft. )2
2 Booked100% Booked
100% Booked
2.5 BHK TYPE 292.32 Sq.mts. ( 994 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK TYPE 1103.09 Sq.mts. ( 1110 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK TYPE 2103.82 Sq.mts. ( 1118 Sq.ft. )2
2 Booked100% Booked
100% Booked
3.5 BHK TYPE 1123.43 Sq.mts. ( 1329 Sq.ft. )10
10 Booked100% Booked
100% Booked
3.5 BHK TYPE 2121.74 Sq.mts. ( 1310 Sq.ft. )10
10 Booked100% Booked
100% Booked
4 BHK TYPE 1135.01 Sq.mts. ( 1453 Sq.ft. )10
10 Booked100% Booked
100% Booked
4 BHK TYPE 2133.8 Sq.mts. ( 1440 Sq.ft. )10
10 Booked100% Booked
100% Booked
48 total apartments / 48 apartments booked. 100% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress98% done
98% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress98% done
98% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress98% done
98% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress65% done
65% Booked
Sanitary Fittings within the flats / premises
work-in-progress65% done
65% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress98% done
98% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing DDec 20181514011833
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
5 BHK208.21 Sq.mts. ( 2241 Sq.ft. )4
4 Booked100% Booked
100% Booked
6 BHK TYPE 1239.89 Sq.mts. ( 2582 Sq.ft. )8
8 Booked100% Booked
100% Booked
12 total apartments / 12 apartments booked. 100% apartments booked.
Work Description in Building Wing DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress98% done
98% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress98% done
98% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress98% done
98% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress65% done
65% Booked
Sanitary Fittings within the flats / premises
work-in-progress65% done
65% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress98% done
98% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing EDec 20181614011070
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK TYPE 1128.68 Sq.mts. ( 1385 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK TYPE 2137.05 Sq.mts. ( 1475 Sq.ft. )20
20 Booked100% Booked
100% Booked
3 BHK TYPE 3131.74 Sq.mts. ( 1418 Sq.ft. )4
4 Booked100% Booked
100% Booked
26 total apartments / 26 apartments booked. 100% apartments booked.
Work Description in Building Wing ECompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress98% done
98% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress98% done
98% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress98% done
98% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress98% done
98% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing FDec 201816140116144
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
4 BHK TYPE 1150.44 Sq.mts. ( 1619 Sq.ft. )2
2 Booked100% Booked
100% Booked
4 BHK TYPE 2151.78 Sq.mts. ( 1634 Sq.ft. )2
2 Booked100% Booked
100% Booked
4 BHK TYPE 3151.85 Sq.mts. ( 1635 Sq.ft. )2
2 Booked100% Booked
100% Booked
4 BHK TYPE 4149.62 Sq.mts. ( 1611 Sq.ft. )2
2 Booked100% Booked
100% Booked
4.5 BHK TYPE 1159.53 Sq.mts. ( 1717 Sq.ft. )1
1 Booked100% Booked
100% Booked
4.5 BHK TYPE 2162.79 Sq.mts. ( 1752 Sq.ft. )1
1 Booked100% Booked
100% Booked
4.5 BHK TYPE 3162.59 Sq.mts. ( 1750 Sq.ft. )10
10 Booked100% Booked
100% Booked
4.5 BHK TYPE 4163.94 Sq.mts. ( 1765 Sq.ft. )10
10 Booked100% Booked
100% Booked
5 BHK TYPE 1166.08 Sq.mts. ( 1788 Sq.ft. )1
1 Booked100% Booked
100% Booked
5 BHK TYPE 2162.49 Sq.mts. ( 1749 Sq.ft. )1
1 Booked100% Booked
100% Booked
5 BHK TYPE 3167.23 Sq.mts. ( 1800 Sq.ft. )10
10 Booked100% Booked
100% Booked
5 BHK TYPE 4165 Sq.mts. ( 1776 Sq.ft. )10
10 Booked100% Booked
100% Booked
SHOP 1445.95 Sq.mts. ( 4800 Sq.ft. )1
None Booked0% Booked
0% Booked
53 total apartments / 52 apartments booked. 98% apartments booked.
Work Description in Building Wing FCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress98% done
98% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress98% done
98% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress98% done
98% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress98% done
98% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Ultra Space Developers Private Limited
for Project
Insignia
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation