Project overview

Innovative Crystal is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000054880. Innovative Crystal is located at Plot No 47 C. This is a New being developed by Pinnacle Construction.

Innovative Crystal has 1 BHK, 2 BHK & Shop Apartments with carpet areas ranging from 146 to 530 Sq.ft. Carpet. The Project has total 39 of which 39 are currently available for sale.

Innovative Crystal is being developed on a total land area of 5910 Sq.ft. Innovative Crystal has 1 Wings / Towers Innovative Crystal

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Innovative Crystal
  • Location:
  • Plot No 47 C
  • Const. Stage:
    New
  • Possession:
    31 Dec 2027
Developer Details

  • Developer:
    Pinnacle Construction
  • Phone:
  • Address:
  • Innovative Palace
Project RERA Details
MAHA REARA No: P52000054880
Project Type Residential / Group Housing
RERA Project Status New
Architect Triarch Design Studio
Funding Bank KARUR VYSYA BANK
Proposed Possession 31 Dec 2027
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 15 Feb 2024
Last Retrived 28 Jul 2025
Innovative Crystal QR Code
Innovative Crystal
MahaRERA - P52000054880
Apartment Details & Configuration
TypeArea
1 BHK25.47 Sq.mts. ( 274 Sq.ft. )
1 BHK29.04 Sq.mts. ( 313 Sq.ft. )
1 BHK29.63 Sq.mts. ( 319 Sq.ft. )
1 BHK29.99 Sq.mts. ( 323 Sq.ft. )
2 BHK47.77 Sq.mts. ( 514 Sq.ft. )
2 BHK49.25 Sq.mts. ( 530 Sq.ft. )
Shop13.58 Sq.mts. ( 146 Sq.ft. )
Shop14.66 Sq.mts. ( 158 Sq.ft. )
Shop16.55 Sq.mts. ( 178 Sq.ft. )
Shop16.65 Sq.mts. ( 179 Sq.ft. )
Shop24.73 Sq.mts. ( 266 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Innovative Crystallast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Cidco Norm
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
As Per Cidco Norms
Buildings / Wings in Innovative Crystal
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Innovative Crystal by Pinnacle Constructionlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

5910 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

39 apartments in total
Total
39
Booked
0
Available
39

Saleable Area Statistics (Sq. ft.)

12893 Total
Total
12893
Booked
0
Available
12893
Total 39 apartments in project. 0 apartments booked. 0% apartments booked.
Total 12893 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Innovative Crystal

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Innovative CrystalDec 202771010010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.47 Sq.mts. ( 274 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK29.04 Sq.mts. ( 313 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK29.63 Sq.mts. ( 319 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK29.99 Sq.mts. ( 323 Sq.ft. )7
None Booked0% Booked
0% Booked
2 BHK47.77 Sq.mts. ( 514 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK49.25 Sq.mts. ( 530 Sq.ft. )5
None Booked0% Booked
0% Booked
Shop13.58 Sq.mts. ( 146 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.66 Sq.mts. ( 158 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.55 Sq.mts. ( 178 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.65 Sq.mts. ( 179 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop24.73 Sq.mts. ( 266 Sq.ft. )1
None Booked0% Booked
0% Booked
39 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Innovative CrystalCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Pinnacle Construction
for Project
Innovative Crystal
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation