Project overview

Indiabulls Park 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000000835. Indiabulls Park 2 is located at 66/7,66/13,65/2,66/14. This is a Ongoing being developed by Lucina Land Development Limited.

Indiabulls Park 2 has 2 BHK M, 2 BHK S & 3 BHK Apartments with carpet areas ranging from 733 to 1070 Sq.ft. Carpet. The Project has total 804 of which 198 are currently available for sale.

Indiabulls Park 2 is being developed on a total land area of 33558 Sq.ft. out of which 54840 Sq.ft. i.e 163% is reserved for recreational purposes. Indiabulls Park 2 has 3 Wings / Towers 5 A,5 B,5 C

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Indiabulls Park 2
  • Location:
  • 66/7,66/13,65/2,66/14
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2024
Developer Details

  • Developer:
    Lucina Land Development Limited
  • Phone:
  • Address:
  • Wework Vaswani Chambers
Project RERA Details
MAHA REARA No: P52000000835
Project Type Residential / Group Housing
RERA Project Status Ongoing
Funding Bank HDFC BANK
Proposed Possession 30 Jun 2024
Revised Possession 30 Jun 2024
Extended Possession 30 Jun 2027
Litigations No Litigations
Last Modified 21 Jun 2024
Last Retrived 28 Jul 2025
Indiabulls Park 2 QR Code
Indiabulls Park 2
MahaRERA - P52000000835
Apartment Details & Configuration
TypeArea
2 BHK M68.95 Sq.mts. ( 742 Sq.ft. )
2 BHK S68.08 Sq.mts. ( 733 Sq.ft. )
3 BHK99.43 Sq.mts. ( 1070 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Indiabulls Park 2last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Common For Proposed Layout (Document Attached)
Basketball Court
Shall Be Done Post Completion Of All Rera Phases
Community Buildings
Common For Proposed Layout (Document Attached)
Cricket Net Practice
Shall Be Done Post Completion Of All Rera Phases
Electrical Meter Room, Sub-Station, Receiving Station
Common For Proposed Layout (Document Attached)
Energy management
Common For Proposed Layout (Document Attached)
Fire Protection And Fire Safety Requirements
Common For Proposed Layout (Document Attached)
Gymnasium Amphitheatre/ Yoga steps
Shall Be Done Post Completion Of All Rera Phases
Kid???s Play area
Shall Be Done Post Completion Of All Rera Phases
Kids??? Pool
Shall Be Done Post Completion Of All Rera Phases
Landscape mound Multipurpose Lawn
Shall Be Done Post Completion Of All Rera Phases
Landscaping & Tree Planting
Common For Proposed Layout (Document Attached)
Mini football court
Shall Be Done Post Completion Of All Rera Phases
Multipurpose Court
Shall Be Done Post Completion Of All Rera Phases
Multipurpose Hall
Shall Be Done Post Completion Of All Rera Phases
Open Parking
Na
Seating Alcove Lounge Deck Pergola
Shall Be Done Post Completion Of All Rera Phases
Sewerage (Chamber, Lines, Septic Tank , STP)
Common For Proposed Layout (Document Attached)
Skating Area
Shall Be Done Post Completion Of All Rera Phases
Solid Waste Management And Disposal
Common For Proposed Layout (Document Attached)
Storm Water Drains
Common For Proposed Layout (Document Attached)
Street Lighting
Common For Proposed Layout (Document Attached)
Swimming Pool
Shall Be Done Post Completion Of All Rera Phases
Treatment And Disposal Of Sewage And Sullage Water
Common For Proposed Layout (Document Attached)
Water Conservation, Rain water Harvesting
Common For Proposed Layout (Document Attached)
Water Supply
Common For Proposed Layout (Document Attached)
Buildings / Wings in Indiabulls Park 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Indiabulls Park 2 by Lucina Land Development Limitedlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

33558 Sq. ft.

Project Area

54840 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

804 apartments in total
Total
804
Booked
606
Available
198

Saleable Area Statistics (Sq. ft.)

655881 Total
Total
655881
Booked
506182
Available
149699
Total 804 apartments in project. 606 apartments booked. 75% apartments booked.
Total 655881 Sq.ft. saleable area. 506182 saleable area booked.
77% area booked.

5 A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
5 AJun 202338101500
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK M68.95 Sq.mts. ( 742 Sq.ft. )140
108 Booked77% Booked
77% Booked
2 BHK S68.08 Sq.mts. ( 733 Sq.ft. )66
31 Booked46% Booked
46% Booked
3 BHK99.43 Sq.mts. ( 1070 Sq.ft. )62
57 Booked91% Booked
91% Booked
268 total apartments / 196 apartments booked. 73% apartments booked.
Work Description in Building 5 ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress79% done
79% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked

5 B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
5 BJun 202338101500
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK M68.95 Sq.mts. ( 742 Sq.ft. )140
112 Booked80% Booked
80% Booked
2 BHK S68.08 Sq.mts. ( 733 Sq.ft. )66
28 Booked42% Booked
42% Booked
3 BHK99.43 Sq.mts. ( 1070 Sq.ft. )62
58 Booked93% Booked
93% Booked
268 total apartments / 198 apartments booked. 73% apartments booked.
Work Description in Building 5 BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress90% done
90% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress74% done
74% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress80% done
80% Booked

5 C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
5 CJun 202338101500
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK M68.95 Sq.mts. ( 742 Sq.ft. )140
105 Booked75% Booked
75% Booked
2 BHK S68.08 Sq.mts. ( 733 Sq.ft. )66
47 Booked71% Booked
71% Booked
3 BHK99.43 Sq.mts. ( 1070 Sq.ft. )62
60 Booked96% Booked
96% Booked
268 total apartments / 212 apartments booked. 79% apartments booked.
Work Description in Building 5 CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress90% done
90% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress71% done
71% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress20% done
20% Booked
Channel Partners
Channel Partners Registered by Developer
Lucina Land Development Limited
for Project
Indiabulls Park 2
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation