Project overview

Indiabulls Park 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000000709. Indiabulls Park 1 is located at 66/5,66/7,67/2,68/3. This is a Ongoing being developed by Lucina Land Development Limited.

Indiabulls Park 1 has 1 BHK, 2 BHK C & 2 BHK L Apartments with carpet areas ranging from 475 to 767 Sq.ft. Carpet. The Project has total 804 of which 155 are currently available for sale.

Indiabulls Park 1 is being developed on a total land area of 25829 Sq.ft. out of which 54840 Sq.ft. i.e 212% is reserved for recreational purposes. Indiabulls Park 1 has 3 Wings / Towers 4 C,4 D,4 E

ProjectDeveloperLocationPossession
Indiabulls Park 4Lucina Land Development Limited81/9 , 81/12 , 81/13 , 81/14 , 71/24,71/23A , 71/23B 30-01-2025 00:00:00
Indiabulls Park 3 Lucina Land Development Limited71/6A ,69/1A, 69/1B , 71/5A ,81/7 , 81/8 , 81/9 , 64/1 30-12-2024 00:00:00
VrundavanShree Vasturachana Realtors116-231-07-2024 00:00:00
Indiabulls Park 1Lucina Land Development Limited66/5,66/7,67/2,68/330-03-2024 00:00:00
Indiabulls Park 2Lucina Land Development Limited66/7,66/13,65/2,66/1430-06-2024 00:00:00
Indiabulls Greens - 2Lucina Land Development Limited8529-02-2020 00:00:00
Indiabulls Greens - 4Lucina Land Development Limited80 A, 83, 8530-06-2021 00:00:00
Gokul Complex IiShree Vasturachana Creators165/030-12-2020 00:00:00
Nirmal GaneshNeelkamal Builders Private Limited151/730-12-2022 00:00:00
ViratnagariShree Vasturachana Realtors112/130-12-2023 00:00:00
Project Details
  • Project:
    Indiabulls Park 1
  • Location:
  • 66/5,66/7,67/2,68/3
  • Const. Stage:
    Ongoing
  • Possession:
    30 Mar 2024
Developer Details

  • Developer:
    Lucina Land Development Limited
  • Phone:
  • Address:
  • Wework Vaswani Chambers
Project RERA Details
MAHA REARA No: P52000000709
Project Type Residential / Group Housing
RERA Project Status Ongoing
Funding Bank HDFC BANK
Proposed Possession 30 Mar 2024
Revised Possession 30 Mar 2024
Extended Possession
Litigations No Litigations
Last Modified 21 Jun 2024
Last Retrived 28 Jul 2025
Indiabulls Park 1 QR Code
Indiabulls Park 1
MahaRERA - P52000000709
Apartment Details & Configuration
TypeArea
1 BHK44.15 Sq.mts. ( 475 Sq.ft. )
2 BHK C55.93 Sq.mts. ( 602 Sq.ft. )
2 BHK L71.24 Sq.mts. ( 767 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Indiabulls Park 1last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Common For Proposed Layout (Document Attached)
Basketball Court
Shall Be Done Post Completion Of All Rera Phases
Community Buildings
Common For Proposed Layout (Document Attached)
Cricket Net Practice
Shall Be Done Post Completion Of All Rera Phases
Electrical Meter Room, Sub-Station, Receiving Station
Common For Proposed Layout (Document Attached)
Energy management
Common For Proposed Layout (Document Attached)
Fire Protection And Fire Safety Requirements
Common For Proposed Layout (Document Attached)
Gymnasium Amphitheatre/ Yoga steps
Shall Be Done Post Completion Of All Rera Phases
Kid???s Play area
Shall Be Done Post Completion Of All Rera Phases
Kids??? Pool
Shall Be Done Post Completion Of All Rera Phases
Landscape mound Multipurpose Lawn
Shall Be Done Post Completion Of All Rera Phases
Landscaping & Tree Planting
Common For Proposed Layout (Document Attached)
Mini football court
Shall Be Done Post Completion Of All Rera Phases
Multipurpose Court
Shall Be Done Post Completion Of All Rera Phases
Multipurpose Hall
Shall Be Done Post Completion Of All Rera Phases
Open Parking
Na
Seating Alcove Lounge Deck Pergola
Shall Be Done Post Completion Of All Rera Phases
Sewerage (Chamber, Lines, Septic Tank , STP)
Common For Proposed Layout (Document Attached)
Skating Area
Shall Be Done Post Completion Of All Rera Phases
Solid Waste Management And Disposal
Common For Proposed Layout (Document Attached)
Storm Water Drains
Common For Proposed Layout (Document Attached)
Street Lighting
Common For Proposed Layout (Document Attached)
Swimming Pool
Shall Be Done Post Completion Of All Rera Phases
Treatment And Disposal Of Sewage And Sullage Water
Common For Proposed Layout (Document Attached)
Water Conservation, Rain water Harvesting
Common For Proposed Layout (Document Attached)
Water Supply
Common For Proposed Layout (Document Attached)
Buildings / Wings in Indiabulls Park 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Indiabulls Park 1 by Lucina Land Development Limitedlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

25829 Sq. ft.

Project Area

54840 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

804 apartments in total
Total
804
Booked
649
Available
155

Saleable Area Statistics (Sq. ft.)

487296 Total
Total
487296
Booked
396227
Available
91069
Total 804 apartments in project. 649 apartments booked. 80% apartments booked.
Total 487296 Sq.ft. saleable area. 396227 saleable area booked.
81% area booked.

4 C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
4 CMar 202338101500
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK44.15 Sq.mts. ( 475 Sq.ft. )72
56 Booked77% Booked
77% Booked
2 BHK C55.93 Sq.mts. ( 602 Sq.ft. )134
111 Booked82% Booked
82% Booked
2 BHK L71.24 Sq.mts. ( 767 Sq.ft. )62
56 Booked90% Booked
90% Booked
268 total apartments / 223 apartments booked. 83% apartments booked.
Work Description in Building 4 CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress99% done
99% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress32% done
32% Booked
Stilt Floor

4 D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
4 DMar 202338101500
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK44.15 Sq.mts. ( 475 Sq.ft. )72
49 Booked68% Booked
68% Booked
2 BHK C55.93 Sq.mts. ( 602 Sq.ft. )134
112 Booked83% Booked
83% Booked
2 BHK L71.24 Sq.mts. ( 767 Sq.ft. )62
48 Booked77% Booked
77% Booked
268 total apartments / 209 apartments booked. 77% apartments booked.
Work Description in Building 4 DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress61% done
61% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress99% done
99% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress32% done
32% Booked
Stilt Floor
work-in-progress61% done
61% Booked

4 E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
4 EMar 202338101500
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK44.15 Sq.mts. ( 475 Sq.ft. )72
53 Booked73% Booked
73% Booked
2 BHK C55.93 Sq.mts. ( 602 Sq.ft. )134
113 Booked84% Booked
84% Booked
2 BHK L71.24 Sq.mts. ( 767 Sq.ft. )62
51 Booked82% Booked
82% Booked
268 total apartments / 217 apartments booked. 80% apartments booked.
Work Description in Building 4 ECompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress99% done
99% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress32% done
32% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Lucina Land Development Limited
for Project
Indiabulls Park 1
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation